This is a Scope of Work document for fire suppression repairs at Eisenhower National Historic Site, a National Park Service facility located in Gettysburg, Pennsylvania. The project involves the demolition and replacement of fire sprinkler system components across three locations: Farm One Main Barn, Farm One Guest House, and Farm Two Show Barn. The work period runs from March 18, 2026 to September 16, 2026, and prevailing wage requirements apply to all labor.
The Show Barn requires demolition of existing galvanized sprinkler mains and lines, installation of new sprinkler mains with appropriate materials and couplings, pressure testing of new piping, and replacement of the dry system valve and VPS (Valve Pressure Switch). The Guest House requires replacement of sprinkler heads to prevent freezing. The Main Barn requires complete demolition of the existing dry system in the basement and main floor, installation of new prefabricated piping for the basement only (main floor will not be reinstalled), and replacement of the dry system valve and VPS. Specified materials include Schedule 10 piping for mains and Schedule 40 for threaded lines, Viking VXR 6" dry system valves, VPS1500A or equivalent pressure switches, and Victaulic Firelock Couplings or equivalent. The contractor must obtain all necessary permits and approvals, comply with OSHA guidelines and local fire codes, provide system testing documentation and certified payroll records, and provide a one-year warranty on newly installed systems. The Contract Officer Representative is Brendan W. Middaugh, Supervisory Exhibits Specialist, reachable at 717-253-2478.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_In-EISE_Fire_Suppression_Repairs_0002.pdf | ||
| Sol_140P4226Q0005_Amd_0002.pdf | ||
| B08_Attachment_7_-_140P4226Q0005_Project_Experience_0002.docx | DOCX document | |
| Sol_140P4226Q0005_Amd_0001.pdf | ||
| Sol_140P4226Q0005.pdf | ||
| B08_Attachment_3_-_Drawings_Reference_Only.pdf | ||
| B08_Attachment_6_-_Q_A_Document.xlsx | XLSX spreadsheet | |
| B03_Attachment_4_-_WD_PA20260073.pdf | ||
| B08_Attachment_5_-_Subcontracting_Percentage_Worksheet.docx | DOCX document | |
| B08_Attachment_2_-_Specifications_Reference_Only.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. United States Department of the Interior
National Park Service Gettysburg National Military Park
Eisenhower National Historic Site
1195 Baltimore Pike
Gettysburg, PA 17325
Scope of Work
Eisenhower Farm One Bank Barn, Farm Two Show Barn and Guest House
Fire Suppression Repairs
Eisenhower National Historic Site
Prepared By: Brendan Middaugh 01/29/2026
This project involves the demolition and replacement of various fire sprinkler system components across three locations: The Farm One Main Barn, the Guest House on Farm One and the Farm Two Show Barn. The work will include replacing sprinkler mains, dry systems, pendants, and related components. All work will be performed in accordance with local codes, all applicable agency regulations, and will adhere to prevailing wage requirements.
1. Project Objectives
a. Show Barn: Demolition of existing galvanized sprinkler mains and replacement with new piping, couplings, dry system valve and VPS (Valve Pressure Switch).
b. Guest House: Replace sprinkler heads with proper heads to prevent freezing.
c. Main Barn: Complete replacement of the existing dry system in the basement, with new prefabricated piping, a dry valve, and VPS system and complete demolition of the system on the second (main) floor. The main floor system will not be reinstalled
d. Period of Performance: 03/18/2026 to 09/16/2026
All work will be performed by qualified professionals and comply with local building codes and fire safety regulations. Prevailing wage rates will apply to all labor associated with this project.
2. Scope of Work
A. Show Barn
a. Demolition of Existing System:
Remove existing galvanized sprinkler mains, lines, including all associated couplings.
Do not replace the stainless mains, lines and couplings.
b. Installation of New Sprinkler Mains:
Install new sprinkler mains with appropriate materials.
Install new coupling at every location where couplings were removed or disturbed during this project to ensure a leak-free system.
Conduct pressure testing of new piping to verify system integrity.
c. Dry System Replacement:
Remove the old dry system components, including the valve and control valve.
Install a new dry system valve and VPS.
Test the new dry system for correct operation.
B. Main Barn
a. Demolition of Existing Dry System:
Disconnect and safely remove the existing dry system in the basement, and main floor to include piping and the dry valve.
Properly dispose of all old materials.
b. Installation of New Prefabricated Piping:
Install new prefabricated piping for the dry system in the basement. Main floor is not getting reinstalled.
Use code-compliant piping and fittings to ensure proper functionality and safety.
Pressure test the new piping system.
c. Dry Valve and VPS System Replacement:
Install a new dry system valve and VPS.
Conduct system testing to ensure correct operation.
3. Deliverables
a. System Testing Documentation: Documentation of pressure tests and system checks confirming proper operation of all systems.
b. Compliance with Prevailing Wage: Proof of adherence to prevailing wage rates for laborers, including certified payroll records.
4. Materials and Equipment
a. Piping: Sch10 for mains and Sch 40 for threaded lines
b. Dry Valves and VPS: Viking VXR 6” for the dry system valve and VPS1500A or equivalent
c. Couplings/Fittings: Victaulic Firelock Couplings or equivalent
d. Pressure Testing Equipment: For testing new systems after installation
6. Safety Requirements
a. OSHA Compliance: All work will adhere to OSHA guidelines to ensure the safety of all personnel.
b. Personal Protective Equipment (PPE): Hard hats, gloves, safety glasses, and hearing protection must be worn by all workers.
7. Permits and Approvals
a. The contractor is responsible for obtaining all necessary permits and approvals from local authorities and fire safety inspectors.
b. All work must comply with local fire codes, building codes, and NFPA regulations.
8. Warranty
a. The contractor will provide a warranty for the newly installed systems (piping, dry valves, VPS, and pendants) for a period of 1 year from the completion date.
9. Modifications or alteration of schedule
a. Any requests for alterations or modifications of terms of the contract such as delivery, cleaning, pick-up or quantity must be submitted in writing to the Contracting Officer and COR for approval prior to any changes being made.
Contract Officer Representative (COR)
Brendan W. Middaugh
Supervisory Exhibits Specialist - Preservation Branch, Structures
Gettysburg National Military Park
Eisenhower National Historic Site
405 Taneytown Rd
Gettysburg, PA 17325
Cell: 717-253-2478