B08 - Attachment 0017 - Safety Statement of Work (SOW).pdf

PDF 409 KB Posted

Attached to
DRAFT Solicitation - Special Ammunition and Weapon Systems (SAWS) Federal contract opportunity
Solicitation number
W52P1J-20-R-0069
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This draft solicitation seeks proposals for an indefinite delivery indefinite quantity multiple award contract to provide Special Ammunition and Weapon Systems to the Department of Defense and other U.S. agencies. The Army Contracting Command-Rock Island will award contracts on a best value tradeoff basis for procuring ammunition, ordnance, and related accessories under NAICS code 332994. The virtual industry day will be held on June 2nd, 2020, and all prospective contractors must register in SAM.gov prior to submitting proposals or receiving awards. The final solicitation will include the actual due date for offers.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT Solicitation - Special Ammunition and Weapon Systems (SAWS), newest first.
File Type Posted
B08 - DRAFT Solicitation W52P1J-20-R-0069 - SAWS.pdf PDF
B08 - Attachment 0010 - Status Report Template.xls XLS spreadsheet
B08 - Exhibit A - Contract Data Requirements List (CDRL).pdf PDF
B08 - Attachment 0002 - General Spec for PdD-SAWS General Ammunition 1 January 2019.pdf PDF
B08 - Attachment 0003 - General Spec for PdD-SAWS Small Caliber Ammunition 1 January 2019.pdf PDF
B08 - Attachment 0009 - Past Performance Questionnaire.pdf PDF
B08 - Attachment 0001 - Statement of Work (SOW).pdf PDF
B08 - Attachment 0005 - Gen Spec for PdD-SAWS Rocket Grenades 1 Jan 201....pdf PDF
B08 - Attachment 0016 - Security - Statement of Work (SOW).pdf PDF
B08 - Attachment 0019 - Section M.pdf PDF
B08 - Attachment 0013 - Hazardous Material Warning Label.pdf PDF
B08 - Attachment 0006 - General Spec for PdD-SAWS Mortar Weapons 1 January 2019.pdf PDF
B08 - Attachment 0007 - Price Matrix.xlsx XLSX spreadsheet
B08 - Attachment 0012 - Disclosure Lobbying Act.pdf PDF
B08 - Attachment 0011 - Delivery Status Report Template.xlsx XLSX spreadsheet
Industry Day Registration Form 24 Apr 20.xlsx XLSX spreadsheet
B08 - Attachment 0008 - Past Performance Cover Letter.pdf PDF
B08 - Attachment 0014 - Item Information Certification Statement Template.docx DOCX document
B08 - Attachment 0018 - Section L.pdf PDF
B08 - Attachment 0004 - General Spec for PdD-SAWS Mortar Ammunition 1 January 2019.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 FEB 2018

Special Ammunition and Weapon Systems (SAWS) SAFETY

STATEMENT OF WORK (SOW)

General Safety Requirements

1.1. Nothing in this Safety Statement of Work (SOW) shall relieve the Contractor of its responsibility for complying with all applicable local, national, and international laws, ordinances, codes, and regulations (including those requiring the obtaining of licenses and permits).

1.2. The contractor is required to identify to the Procuring Contracting Officer (PCO) and the Administrative Contracting Officer (ACO) all Ammunition and Explosive (A

& E) subcontractors where end items will be presented to the Government for inspection. Contractor is required to flow‐down this safety SOW to all A & E subcontractors where Government Source Inspection (GSI) will be performed.

Contractor shall establish and implement management controls to ensure A & E subcontractors comply with this safety SOW.

1.3. The contractor shall demonstrate and maintain an effective safety program that shall be made available to the US Government and includes the following minimum requirements;

1.3.1. Comply with the requirements of this Safety SOW and any other safety requirements contained within the contract.

1.3.2. Designate an individual to administer and implement the safety program.

1.3.3. Provide for US Government access to facilities and review of safety program documentation.

1.3.4. The contractor shall provide safety awareness, entry, and emergency egress training to all US Government inspectors and visitors.

1.3.5. Develop and implement a plan that demonstrates the protective safety measures for US Government personnel performing A&E‐ related Government Source Inspections/surveillance activities (GSI), including site ingress/egress.

1.3.6. Contractors must provide, document and report all A&E‐related mishaps/accidents for to the cognizant Defense Contract Management

Agency (DCMA) ACO and Safety Manager and the PCO, identifying any negative impact to contractor production schedules, US Government surveillance activities, and US Government delivery schedules.

1.3.7. Major and Minor mishaps/accidents are defined as:

1.3.7.1 Major ‐ One or more fatalities, five or more non‐fatal injuries, delay in delivery schedule exceeding 24 hours and any accident that may degrade operational or production capability or is likely to arouse media interest.

1.3.7.2 Minor - All other A&E related mishaps/accidents that do not meet the definition of “Major” as documented above.

1.3.8. Mishap/Accident Reporting timelines are as follows

(email/telephonic notification of event):

1.3.8.1 Major Mishap/Accident ‐ As soon as possible, not later than 8 hours after the incident.

1.3.8.2 Minor Mishap/Accident – 3 days

1.3.9. Mishap/Accident Reporting. Mishap/Accident reports will include, as a minimum: contractor name and location, date and time of accident, location of the accident, type of accident (explosion, fire, etc.), material/item involved, a short accident narrative, number of fatalities and injuries, property damage, and, if known, quantity of material involved and cause. All reports must include this contract’s number and the contact information of the person submitting the report.

1.3.10. Records, maintains, and makes available for review, until final delivery under this contract, all contract‐related safety inspections/oversight, safety records, and hazard analyses documentation used to determine compliance to mandatory safety requirements.

2. Detailed Safety Requirements

2.1 The contractor shall provide US Government personnel a safe and healthy work/inspection environment (to include ingress/egress of the contractor’s facilities and or property). Each US Government inspection location and ingress/egress routes shall be verified by a contractor safety professional prior to use to assure the minimum safety requirements are met.

2.2 The contractor shall in accordance with Section C, Statement of Work, submit and maintain current A & E site plans for all DoD GSI locations and ingress/egress routes as addressed below:

2.2.1 The contractor/subcontractor shall establish, provide, maintain, and monitor quantity/distance (QD) separation to identified GSI locations from surrounding A & E locations and operations. The QD separation distance will be based on either the applicable NATO A & E Standards, Host Nation A & E Standards, or the applicable QD tables from DoD

4145.26‐M, DoD Contractors Safety Manual for Ammunition and

Explosives March 13, 2008; whichever is more stringent. A minimum safety zone of at least inhabited building distance (IBD) for GSI sites and at least public transportation route distance (PTRD) for site ingress/egress will not be dictated by the U.S. Government, but should be considered by the contractor/subcontractor and separation distances should be based on either the applicable documents named above.

2.2.2 If the quantity/distance separation requirements are not compliant to the applicable standard(s) in paragraph 2.2.1, the A&E Site Plan will include the contractor’s alternate risk mitigation plan to reduce any exposure to explosion risks during the GSI. Individual maximum credible event

(MCE) data analysis or equivalent level of protection data analysis may also be considered when QD separation is limited. Alternative risk mitigation plans may include, but are not limited to, temporary cessation/shutdown of operations during GSI, conduct GSI during nonoperational hours, clear the assembly lines of explosive material during inspection, or identification of an alternate location for the GSI.

The alternate plan may be to define building design, A & E spacing, A &

E configuration, terrain, barricades, or barriers that reduce the risk of exposure, such analysis shall be included in the A&E site plan for

Government assessment.

2.2.3 When increasing the existing net explosive weight for quantity distance

(NEWQD) or MCE for any A&E facility Improvement /modification that can negatively impact US Government Ingress /egress routes or inspection locations, the contractor shall notify and provide an updated site plan in accordance with Section C of the contract.

2.2.4 Unless identified and documented in contractors' submitted A & E site plan, GSI locations shall not be utilized to store non DoD related ammunition, explosive items, products, or materials.

2.2.5 Contractor US Government inspection sites that do not meet this safety

SOW shall be subject to withdrawal of US Government personnel and require A&E materials to be relocated to an accepted location for GSI activities.

2.3 The inability of the contractor to meet the minimum safety requirements at the time of GSI verification shall not relieve the contractor from meeting their contractual requirements.

2.4 Nothing in this statement of work (SOW), nor any US Government action or failure to act in surveillance of this contract, shall relieve the contractor of its responsibility for the safety of US Government personnel and/or property.

2.5 If the US Government acts or fails to act in surveillance or enforcement of the safety requirements of this contract, this shall not impose any liability on the US

Government.

File details come from the government source that posted it. Updated .