B08_Attach_9_Photo_Log.pdf

PDF 2 MB Posted

Attached to
Bishop Campgrounds' Water Systems Great American O Federal contract opportunity
Solicitation number
140L1225R0001
Issued by
Department of the Interior Bureau of Land Management California Region

About this file

This document appears to be an attachment containing a photo log for a Bureau of Land Management contract opportunity titled "Bishop Campgrounds' Water Systems Great American Outdoor Act (GAOA)". The photos provide detailed visual information about the solar power, well, and water tank systems at various campground locations, including Tuttle Creek, Horton Creek, and Crowley Lake. The photos show the solar panel arrays, well and tank infrastructure, and related piping and electrical components. However, this attachment does not appear to contain information about the specific products, services, or requirements of the federal contract opportunity. It seems to be supplementary documentation rather than the main solicitation or contract document.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management

Attachment 9: Photo Log

Photo 1 Tuttle Creek Campground Front of Solar Panels

Photo 2 Tuttle Creek Campground Back of Solar Panels

Photo 3 12 Solar Panel Array typical of all Campgrounds

Photo 4 Typical distance between Solar Panel and Tanks at all Campgrounds

Photo 5 Individual Panel Specifications for solar panels at all Campgrounds

Photo 6 Circuit Panel Breaker at all Campgrounds

Photo 7 Replaced Lorentz PS2-1800C well controller Board at Crowley

Photo 8 Lorentz PS2-4000C Well Controller at Tuttle and Horton

Photo 9 Typical concrete foundation at attachment of solar panel base

Photo 10 Typical 11-ft between well pad to solar foundation

Photo 11 Typical 22-ft wide within fenced area

Photo 12 Tuttle Creek Wellhead

Photo 13 Tuttle Creek Wellhead (Blue Arrow), Pump to Waste (Green Arrow)

Photo 14 Tuttle Creek Wellhead Discharge Piping

Photo 15 Tuttle Creek Tank Piping and Ladder, Drain Line Green

Photo 16 Tuttle Creek Tank Discharge Piping

Photo 17 18-inches deep existing valve box and gate valve

Photo 18 Tuttle Creek tank ladder and overflow

Photo 19 Tuttle Creek Tank Sample Tap

Photo 20 Tuttle Creek Existing Drain Valves and line

Photo 21 Tuttle Creek Tank 4-inch Drain Valve

Photo 22 Tuttle Creek Tank Pad 9.5-inches thick

Photo 23 Tuttle Creek Pad to fence line

Photo 24 Horton Creek Solar Panels, Well, and Tank

Photo 25 Horton Creek Solar Panel Foundation

Photo 26 Horton Creek Solar Panels

Photo 27 Power line from Panels to Well

Photo 28 Solar Panel post

Photo 29 Horton Creek Wellhead and Tank

Photo 30 Tank Piping and Ladder, Drain Line Highlighted

Photo 31 Horton Creek Wellhead Discharge Piping

Photo 32 Horton Creek Discharge Line

Photo 33 Crowley Lake Solar Panels

Photo 34 Crowley Lake Drain and Overflow Lines

Photo 35 Crowley Lake Tank Piping and Ladder

Photo 36 Crowley Lake Tank Discharge Line

Photo 37 Crowley Lake Solar Panel

Photo 38 Crowley Lake Wellhead

Photo 39 Tank Conduit Entry on Roof

Photo 40 Tank 1-inch Sample Tap

Photo 41 Tank Locking Ladder

Photo 42 Typical existing surface drain line

Attachment 10: Photo Log

File details come from the government source that posted it. Updated .