B08_Attach_8_Contractor_Price_Proposal_Form_(rev6-26-25).xlsx

XLSX spreadsheet 42 KB Posted

Attached to
HAVO REPLACE FOOTBRIDGE NAHUKU Federal contract opportunity
Solicitation number
140P8225B0004
Issued by
Department of the Interior National Park Service

About this file

This is a Contractor Price Proposal Form Excel template for a National Park Service project to replace the Nahuku Footbridge at Hawaii Volcanoes National Park (Solicitation No. 140P8225B0004). The comprehensive spreadsheet provides a detailed cost breakdown mechanism with multiple tabs for calculating direct costs, other direct costs, and contractor markups, including sections for materials, labor, equipment, onsite supervision, travel expenses, and support services.

The template is designed to capture granular pricing information across various cost categories, with specific instructions for contractors to complete each section. It includes provisions for calculating overhead, general and administrative costs, profit, and applicable general excise taxes (ranging from 4.167% to 5.25% depending on location). The form requires contractors to develop a work breakdown structure (WBS), specify materials, labor trades, equipment, quantities, and unit prices, and provides a structured approach for presenting a comprehensive and detailed price proposal for the footbridge replacement project.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Summary

PARK:Park Name & LocationPROJECT:Project Title
FOR:Solicitation or Contract No.CONTRACTOR:Prime Contractor NameDATE:0/0/0
PRICE PROPOSAL SUMMARYCONTRACTOR MARKUP CALCULATOR / WORKSHEET
Description of Item% of Total$ TotalSubcontractor / Vendor Name$ Totals
DIRECT COSTS (DC)Contractor Portion of Direct & Other Direct Costs$0.00
Materials & ShippingERROR:#DIV/0!$0Overhead / G&A$0.00
Labor PoolERROR:#DIV/0!$0Profit$0.00
Heavy EquipmentERROR:#DIV/0!$0General Excise Tax (GET)$0.00
TOTAL - DIRECT COSTSERROR:#DIV/0!$0Subcontractor / Vendor Name$ Totals
OTHER DIRECT COSTS (ODC)Contractor Portion of Direct & Other Direct Costs$0.00
Onsite SupervisionERROR:#DIV/0!$0Overhead / G&A$0.00
AdministrationERROR:#DIV/0!$0Profit$0.00
Travel ExpensesERROR:#DIV/0!$0General Excise Tax (GET)$0.00
Support Items & ServicesERROR:#DIV/0!$0Subcontractor / Vendor Name$ Totals
TOTAL - OTHER DIRECT COSTSERROR:#DIV/0!$0Contractor Portion of Direct & Other Direct Costs$0.00
TOTAL - DIRECT & OTHER DIRECT COSTSERROR:#DIV/0!$0Overhead / G&A$0.00
CONTRACTOR MARKUPSProfit$0.00
Overhead / G&AERROR:#DIV/0!$0General Excise Tax (GET)$0.00
ProfitERROR:#DIV/0!$0Prime Contractor Name$ Totals
BondsERROR:#DIV/0!$0Contractor Portion of Direct & Other Direct Costs$0.00
General Excise Tax (GET)ERROR:#DIV/0!$0Overhead / G&A$0.00
TOTAL - CONTRACTOR MARKUPSERROR:#DIV/0!$0Profit$0.00
TOTAL - PRICE PROPOSAL$0Bonds$0.00
General Excise Tax (GET)$0.00
INSTRUCTIONSGET = 4.167% Maui / Molokai; 4.712% Oahu / Hawaii; 5.25% CNMI
DIRECT COSTS (DC) TAB 2
Step 1Develop WBS for project (Materials, Labor, Equipment)CONTRACT SCHEDULE / TIMELINE
Use the categories from the pulldown menu as headingsDuration of Field Activities (Mobe to Demobe)X days
Step 2Enter the Material Item(s) or Assembly for each WBS ItemOptimal Contract PoP (NTP to Closeout)X days
Step 3Enter the Labor Trade associated with the WBS Item
Step 4Enter the Heavy Equipment Type for each WBS ItemASSUMPTIONS / NOTES
Step 5Enter the Quantity, Unit, and $/Unit for each WBS Item
OTHER DIRECT COSTS (ODC) TAB 3
Step 6In the WBS column, select applicable items from pulldown
Do not select items that are NOT required or necessary
Step 7Enter the Specific Item, Trade-Position, & Equipment Type
Step 8Enter the Quantity, Unit, and $/Unit for each WBS Item
SUMMARY TAB 1
Step 9Complete Project Information fields at the top of sheet
Step 10Check to ensure DC & ODC numbers carry over to Summary
Step 11Insert each Contractor's markups in yellow highlight
Markups will auto-total in the Price Proposal Summary
Step 12Insert proposed days in the field & optimal contract PoP
Step 13Insert any applicable Assumptions / Notes
Step 14Create and submit a PDF of tabs 1, 2, and 3
Password to unprotect sheet = password

&"-,Bold"PRICE PROPOSAL SUMMARY

2. Direct Costs

WORK BREAKDOWN STRUCTURE (WBS)MATERIALS & SHIPPINGLABOR POOLHEAVY EQUIPMENT$ TOTAL
Description of Work ElementMaterial Item(s) or AssemblyQtyUnit$ / Unit$ TotalLabor TradeCrew-HrsWage / Hr$ TotalEquipment TypeQtyUnit$ / Unit$ Total
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
SUBTOTALS - DIRECT COSTS$00$0$0
TOTAL - DIRECT COSTS$0
Note 1: If additional rows are needed: Insert a new row(s) → Copy the formulas from an existing row (using Ctrl "C") → Paste the formulas in the new row (using Ctrl "V"). Ensure all fields are adding up and carrying over correctly. The NPS is not responsible for errors in the Price Proposal form.
Note 2: For 8(a) sole source non-competitve solicitations, ensure all items include a complete breakdown. Lump sum pricing is NOT allowed. All items must have a unit quantity and unit price. If lump sum pricing is presented, the NPS will not review until the item(s) are broken down.
Password to unprotect sheet = password

&"-,Bold"DIRECT COSTS

3. Other Direct Costs

WORK BREAKDOWN STRUCTUREMATERIALS or ITEMLABOR POOLHEAVY EQUIPMENT$ TOTAL
Description of Work ElementMaterials or Item(s)QtyUnit$ / Unit$ TotalLabor Trade-PositionHoursWage / Hr$ TotalEquipment TypeQtyUnit$ / Unit$ Total
ONSITE SUPERVISION
Onsite Job Superintendent (Full-Time, All Projects)$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
TOTAL - ONSITE SUPERVISION0$0
GOVERNMENT GENERAL CONDITIONS (ADMINISTRATION)
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
TOTAL - GOVERNMENT GENERAL CONDITIONS (ADMINISTRATION)0$0
TRAVEL EXPENSES
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
TOTAL - TRAVEL EXPENSES0$0
STANDARD GENERAL CONDITIONS (SUPPORT ITEMS & SERVICES)
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
$0.00$0$0.00$0$0$0$0
TOTAL - STANDARD GENERAL CONDITIONS (SUPPORT ITEMS & SERVICES)0$0
TOTAL - OTHER DIRECT COSTS$0
Password to unprotect sheet = password

&"-,Bold"OTHER DIRECT COSTS

Uniformat II Codes

UNIFORMAT II - BUILDING CLASSIFICATION
CODEDESCRIPTION
MOBILIZATIONTransport of Items & Equipment (Hub to Site)
DEMOBILIZATIONTransport of Items & Equipment (Site to Hub)
F20 - DEMOLITIONBuilding Element Demolition, Hazardous Component Abatement
G10 - SITE PREPARATIONSite Clearing, Site Demolition & Relocations, Site Earthwork, Hazardous Waste Remediation
G20 - SITE IMPROVEMENTSRoadways, Parking Lots, Pedestrian Paving, Site Development, Landscaping
G30 - SITE MECHANICAL UTILITIESSite / Exterior: Water Supply, Sanitary Sewer, Storm Sewer, Heating & Cooling, Fuel Distribution
G40 - SITE ELECTRICAL UTILITIESSite / Exterior: Electrical Distribution, Lighting, Communications & Security
A10 - FOUNDATIONSStandard Foundations & Slab on Grade
A20 - BASEMENT CONSTRUCTIONBasement Excavation & Basement Walls
B10 - SUPERSTRUCTUREFloor Construction & Roof Construction
B20 - EXTERIOR ENCLOSUREExterior Walls, Exterior Windows, and Exterior Doors
B30 - ROOFINGRoof Coverings & Roof Openings
C10 - INTERIOR CONSTRUCTIONPartitions, Interior Doors, Fittings
C20 - STAIRSStair Construction & Stair Finishes
C30 - INTERIOR FINISHESWall Finishes, Floor Finishes, Ceiling Finishes
D10 - CONVEYINGElevators & Lifts, Escalators & Moving Walks, Other Conveying
D20 - PLUMBINGInterior: Plumbing Fixtures, Domestic Water Distribution, Sanitary Waste, Rainwater Drainage
D30 - HVACEnergy Supply, HVAC Generating Systems, HVAC Package Units & Controls, Testing & Balancing
D40 - FIRE PROTECTIONSprinklers & Standpipes, Fire Protection Specialties
D50 - ELECTRICALInterior: Electrical Service & Distribution, Lighting & Brach Wiring, Communications & Security
E10 - EQUIPMENTCommercial Equipment, Institutional Equipment, Vehicular Equipment
E20 - FURNISHINGSFixed Furnishings, Moveable Furnishings

&"-,Bold"UNIFORMAT II CODES

ODC Pick List

ONSITE SUPERVISION
Onsite Job Superintendent (Full-Time, All Projects)
Foreman / Crew Leader (Complex Jobs)
Quality Control (QC) Daily Reports
GOVERNMENT GENERAL CONDITIONS (ADMINISTRATION)
Division 01 Plan Submittals
Division 02-48 Material Submittals
Permit(s) to Construct, if applicable
Shop Drawings, if applicable
Accessibility Form, if applicable
Closeout Submittals
Permit(s) to Operate, if applicable
Project Manager (Weekly Calls, RFI, Expediting)
Other (Identify)
TRAVEL EXPENSES
Airline Flights (Prime Contractor)
Lodging & Lodging Tax (Prime Contractor)
Transport Vehicle & Gasoline (Prime Contractor)
Per Diem / Meals & Incidentals (Prime Contractor)
Other (Prime Contractor)
Airline Flights (Subcontractors)
Lodging & Lodging Tax (Subcontractors)
Transport Vehicle & Gasoline (Subcontractors)
Per Diem / Meals & Incidentals (Subcontractors)
Other (Subcontractors)
STANDARD GENERAL CONDITIONS (SUPPORT ITEMS & SERVICES)
Invasive Species Inspections
Temporary Fence / Barriers (Site, Exterior)
Temporary Barriers (Protect Trees / Plants)
Temporary Partition (Buildings, Interior)
Temporary Pedestrian Bypass
Temporary Vehicle Bypass
Temporary Traffic Control Signs / Devices
Traffic Control Services (Crew / Flaggers)
Communication / Radios
Material Storage Containers
Temporary Office Trailer
Construction Waste Containers
Construction Waste Disposal Services
Landfill Disposal Fees
Hazmat Remediation Services
Hazmat PPE, if applicable
Fire Extinguishers
Personal Protective Equipment (PPE)
Marine Safety Equipment & Devices
Fall Protection, Ropes, Rigging, Harness
Ladders / Scaffolding
Tripod / Gantry / Hoist
Temporary Erosion Control BMP
Surface Protections for Equipment
Temporary Weather Protections
Trench Box / Trench Shoring
Steel Plates
Temporary Embankment Stabilization
Temporary Water Connections
Pressure Testing Equipment
Potable Water Delivery Services
Non-Potable Water Delivery Services
Water System Disinfection (per AWWA)
Water Quality Sampling & Testing
Temporary Dust Control
Temporary Irrigation
Temporary Toilets (Porta Potties)
Sewage Pumping & Disposal Services
Trash Pump & Hoses
Surface Water Dewatering
Generator / Electrical Power Generation
Fuel Storage & Dispensing
Fuel Spill Prevention BMP
Temporary Fans / Ventilation
Temporary Heating / Cooling System
HVAC Testing & Balancing
Building Commissioning
Temporary Indoor / Outdoor Lighting
Hand & Power Tools
Air Compressor
Paiting Supplies
Construction Stakeout (by Contractor)
Utility Toning Services
Field Surveying (by PLS)
Field Engineering (by P.E.)
Surface Compaction Testing Services
Asphalt / Concrete Testing Services
Inspection Services (Other)
Soil Sampling & Testing Services
Soil Percolation Testing & Report
Final Jobsite Cleaning
Other (Identify)

&"-,Bold"OTHER DIRECT COSTS

File details come from the government source that posted it. Updated .