This Request for Information (RFI) concerns the replacement of an old wooden footbridge at Nāhuku in Hawaii Volcanoes National Park, Solicitation No. 140P8225B0004. The document addresses pre-bid questions from prospective contractors regarding project details, including helicopter material transport, work timeframe, and structural specifications. Key responses include: helicopter materials transport is allowable with strict safety and park requirements, a December 1, 2025 mobilization date is acceptable, glulam beams can be continuous if structural requirements are met, and contractors may provide portable toilets near the project site. The NPS anticipates a construction start 2-3 months after contract award, with administrative steps like bond and insurance review taking 3-4 weeks post-award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

Park Name & Project Title: Hawaii Volcanoes National Park, Replace Old Deteriorated Wooden Footbridge at Nāhuku

NPS Solicitation / Contract No: Solicitation No. 140P8225B0004

Contractor Name: Pre-Bid Questions from Prospective Contractors

Subject of RFI: Varies

RFI Number: 001 Date Submitted: Varies Response Required By: NA

Please provide additional information or clarifications to the questions below:

Q1a: Can heliops be used to mobilize materials to the jobsite? Q1b: Does helicopter use require DOI approved helicopter company or can a Contractor hire a company at their discretion?

Q2: Is the work timeframe flexible? Can the work begin on December 1, 2025?

Q3: Can the glulam be a continuous member from end to end?

Q4: Can the Contractor provide portable toilets adjacent to the site?

Contractor Recommendation, if applicable

NPS SECTION

Name of NPS Respondent: Scott Henrickson, P.E., PMP Date of Response: 8/14/25

Below is additional information or clarifications in response to the Contractor RFI:

Q1a: Helicopter transport of materials to the site is allowable as long as the Contractor follows park and industry safety standards, park aviation requirements, employs resource protection measures (Refer to Specification Section 01 11 40), and requires minimal to no vegetation clearing (if required, veg clearing to be completed by the park). Heliops shall require a detailed aviation plan; coordination with park dispatch and aviation managers; and adherence to Best Management Practices (BMP). Refer to GFD #1 – Heliops BMP. The park believes a long line in the range of 100-150 feet would likely be required, but it will be the contractor’s responsibility to ensure the materials can be safely mobilized without damaging infrastructure, vegetation, or park resources. Potential staging areas include a forested but relatively open site approximately 0.5 miles away, and a more open area roughly 3.5 miles away. Refer to revised Specification Section 01 11 00, PART 1.8.K.

Q1b: The Contractor is responsible for hiring vendors / subcontractors that are qualified, accredited, and can meet the requirements.

Q2: It typically takes 3-4 weeks after contract award to review bonds, insurance, and Division 01 Informational Submittals. The preconstruction meeting is scheduled after all Informational Submittals have been accepted.

Notice to Proceed (NTP) is typically issued after the precon meeting. The contract period of performance will extend from the Notice to Proceed (NTP) to substantial completion. Due to these administrative steps, and the long lead procurement and shipping of materials, the NPS does not anticipate a construction start until 2-3 months after award. A December 1, 2025 mobilization would be acceptable. Reference Section 01 11 40 (Work Restrictions) for the seasonal requirements during the proposed construction period.

CONTRACTOR SECTION

Q3: Yes, a glulam beam can be one continuous member as long as the structural requirements are met. Any major changes to the current construction drawings will require submittal of shop drawings and calculations.

Note that the designer proposed shorter structural members in consideration of site constraints and cost.

Q4: Yes, the Contractor may provide porta potties close to the project site. Exact location to be determined after contract award. See also Specification Section 01 11 00, PART 1.5.D.1 and Section 01 50 00, PART 2.3.B.

Clarification: Government-Furnished Housing is NOT AVAILABLE on this project. Refer to revised Specification Section 01 11 00, PART 1.5.F.

Clarification: Specification Section 01 11 00, PART 1.14 (Professional Services) somehow got dropped from the final construction specifications. It has been added back to the specifications.

All changes / updates to the specifications are highlighted in red text.