About this file
This is a Davis-Bacon Act Wage Determination (WD# HI20260001, Modification 1) issued by the U.S. Department of Labor Wage and Hour Division, effective January 16, 2026. The determination applies to all construction types—building, heavy, highway, and residential—throughout Hawaii (statewide, covering Hawaii, Honolulu, Kalawao, Kauai, and Maui counties). This wage determination establishes prevailing wage rates that must be paid to workers on federal construction projects subject to the Davis-Bacon Act.
The document contains comprehensive wage rate schedules organized by trade classification, including carpenters ($55.50–$55.75/hour), electricians ($41.00–$63.90/hour depending on classification), operating engineers with multiple groups ranging from $57.66–$61.32/hour, laborers in various classifications ($31.40–$46.40/hour), plumbers ($53.83/hour), cement masons ($44.12–$44.27/hour), and numerous other skilled trades. Rates are indexed by classification code and effective date. The determination also specifies premium pay for crane operators based on boom or lead length, special pay premiums for ironworkers performing hazardous work, and detailed classifications for power equipment operators, dredging operations, and underground laborers. Executive Order 13706 requires contractors to provide paid sick leave (1 hour per 30 hours worked, up to 56 hours annually), and Executive Order 13658 establishes a federal minimum wage of $17.35/hour for covered workers in 2025. The wage determination includes instructions for appeals and clarifies that unlisted classifications may be added during contract performance through conformance procedures under 29 CFR 5.5(a)(1)(iii).
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
An official website of the United States government Here’s how you know
Contract Awards Scheduled Maintenance
Show Details Mar 30, 2026
Revolutionary FAR Overhaul Impacts to SAM.gov
Show Details Aug 15, 2025
See All Alerts
Home Data Bank Data Services HelpSearch
Wage Determination
Overview
Document
History
Follow
WAGE DETERMINATIONS
Davis-Bacon Act WD #
HI20260001
States and Counties
Wage Determination
Modification #
Construction Building, Heavy, Highway, Residential
Last Revised Date Jan 16, 2026
3/30/26, 11:23 AM SAM.gov https://sam.gov/wage-determination/HI20260001/1 1/32 https://sam.gov/ https://sam.gov/ javascript:void(0) javascript:void(0) https://sam.gov/ https://sam.gov/reports/awards/standard https://sam.gov/data-services https://sam.gov/help https://sam.gov/search/ https://sam.gov/workspace/profile/feeds https://sam.gov/workspace/profile/feeds/notification https://sam.gov/workspace/profile/workspace javascript:void(0)
State Hawaii
Counties Hawaii, Honolulu, Kalawao, Kauai, Maui
Document Print Download
"General Decision Number: HI20260001 01/
Superseded General Decision Number: HI20250001
State: Hawaii
Construction Types: Building, Heavy (Heavy and Dre Highway and Residential
Counties: Hawaii Statewide.
BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTR
PROJECTS (consisting of single family homes and ap to and including 4 stories); HEAVY AND HIGHWAY CO
PROJECTS AND DREDGING
Modification Number Publication Date 0 01/02/2026 1 01/16/2026
ASBE0132-001 09/07/2025
Rates F
Asbestos Workers/Insulator Includes application of
3/30/26, 11:23 AM SAM.gov https://sam.gov/wage-determination/HI20260001/1 2/32 https://sam.gov/api/prod/wdol/v1/wd/HI20260001/1/download?api_key=null all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 46.90
BOIL0627-005 01/01/2025
Rates F
BOILERMAKER......................$ 49.37
BRHI0001-001 09/05/2023
Rates F
BRICKLAYER
Bricklayers and Stonemasons.$ 48.03 Pointers, Caulkers and Weatherproofers.............$ 48.28
BRHI0001-002 09/05/2023
Rates F
Tile, Marble & Terrazzo Worker Terrazzo Base Grinders......$ 44.69 Terrazzo Floor Grinders and Tenders.................$ 43.14 Tile, Marble and Terrazzo Workers.....................$ 46.50
CARP0745-001 09/01/2025
3/30/26, 11:23 AM SAM.gov https://sam.gov/wage-determination/HI20260001/1 3/32
Rates F
Carpenters:
Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;
Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........$ 55.50 Millwrights and Machine Erectors....................$ 55.75 Power Saw Operators (2 h.p. and over)..............$ 55.65
CARP0745-002 09/01/2025
Rates F
Drywall and Acoustical Workers and Lathers..............$ 55.75
ELEC1186-001 08/24/2025
Rates F
Electricians:
Cable Splicers..............$ 63.90 Electricians................$ 56.55 Telecommunication worker....$ 41.00
ELEC1186-002 08/24/2025
Rates F
Line Construction:
Cable Splicers..............$ 63.90 Groundmen/Truck Drivers.....$ 42.41 Heavy Equipment Operators...$ 50.90 Linemen.....................$ 56.55 https://sam.gov/wage-determination/HI20260001/1 4/32
Telecommunication worker....$ 41.00
ELEV0126-001 01/01/2025
Rates F
ELEVATOR MECHANIC................$ 73.85 38.
a. VACATION: Employer contributes 8% of basic ho 5 years service and 6% of basic hourly rate for 5 years service as vacation pay credit.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Day, Labor Day, Veterans' Day, Thanksgiving Day, after Thanksgiving Day and Christmas Day.
ENGI0003-002 09/01/2025
Rates F
Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)...$ 81.72 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)..$ 72.35 Stand-by Diver (Aqua Lung) (Scuba)....................$ 62.97 Diver (Other than Aqua Lung) Diver (Other than Aqua Lung).......................$ 81.72 Diver Tender (Other than Aqua Lung)..................$ 59.94 Stand-by Diver (Other than Aqua Lung)..................$ 62.97 Helicopter Work Airborne Hoist Operator for Helicopter..............$ 61.52 Co-Pilot of Helicopter......$ 61.66 Pilot of Helicopter.........$ 62.83 https://sam.gov/wage-determination/HI20260001/1 5/32
Power equipment operator -tunnel work
GROUP 1....................$ 57.96
GROUP 2....................$ 58.07
GROUP 3....................$ 58.24
GROUP 4....................$ 58.51
GROUP 5....................$ 58.82
GROUP 6....................$ 59.47
GROUP 7....................$ 59.79
GROUP 8....................$ 59.90
GROUP 9....................$ 60.01
GROUP 9A...................$ 60.24
GROUP 10....................$ 60.30
GROUP 10A...................$ 60.45
GROUP 11....................$ 60.60
GROUP 12....................$ 60.96
GROUP 12A...................$ 61.32
Power equipment operators:
GROUP 1....................$ 57.66
GROUP 2....................$ 57.77
GROUP 3....................$ 57.94
GROUP 4....................$ 58.21
GROUP 5....................$ 58.52
GROUP 6....................$ 59.17
GROUP 7....................$ 59.49
GROUP 8....................$ 59.60
GROUP 9....................$ 59.71
GROUP 9A...................$ 59.94
GROUP 10....................$ 60.00
GROUP 10A...................$ 60.15
GROUP 11....................$ 60.30
GROUP 12....................$ 60.66
GROUP 12A...................$ 61.02
GROUP 13....................$ 57.94
GROUP 13A...................$ 58.21
GROUP 13B...................$ 58.52
GROUP 13C...................$ 59.17
GROUP 13D...................$ 59.49
GROUP 13E...................$ 59.60
https://sam.gov/wage-determination/HI20260001/1 6/32
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Fork Lift (up to and including 10 tons) (heavy duty repair shop parts room when needed).
GROUP 2: Conveyor Operator (Handling building ma Hydraulic Monitor; Mixer Box Operator (Concrete
GROUP 3: Brakeman; Deckhand; Fireman; Oiler;
Oiler/Gradechecker; Signalman; Switchman; Highli Signalman; Bargeman; Bunkerman; Concrete Curing (self-propelled, automatically applied unit on s highways, airports and canals); Leveeman; Roller and under); Tugger Hoist.
GROUP 4: Boom Truck or dual purpose ""A"" Frame or less); Concrete Placing Boom (Building Constr Dinky Operator; Elevator Operator; Hoist and/or drum); Straddle Truck (Ross Carrier, Hyster and
GROUP 5: Asphalt Plant Fireman; Compressors, Pum Generators and Welding Machines (""Bank"" of 9 o individually or collectively); Concrete Pumps or Guns; Lubrication and Service Engineer (Grease R Screedman.
GROUP 6: Boom Truck or Dual Purpose ""A""Frame T tons); Combination Loader/Backhoe (up to and inc
cu. yd.); Concrete Batch Plants (wet or dry); Co Cutter, Groover and/or Grinder (self-propelled u streets, highways, airports, and canals); Convey Concrete Pump (Truck or Equipment Mounted); Dril Machinery (not to apply to waterliners, wagon dr jack hammers); Fork Lift (over 10 tons); Loader including 3 and 1/2 cu. yds); Lull High Lift (un feet); Lubrication and Service Engineer (Mobile) Internal Full Slab Vibrator (on airports, highwa and warehouses); Man or Material Hoist; Mechanic Finisher (Large Clary, Johnson Bidwell, Bridge D similar); Mobile Truck Crane Driver; Portable Sh https://sam.gov/wage-determination/HI20260001/1 7/32
Concrete Cleaning Machine; Portable Boring Machi streets, highways, etc.); Portable Crusher; Powe Operator (setting slip forms, etc., in tunnels);
(over 5 tons); Self-propelled Compactor (single Self-propelled Pavement Breaker; Skidsteer Loade attachments; Slip Form Pumps (Power driven by hy electric, air, gas, etc., lifting device for con forms); Small Rubber Tired Tractors; Trencher (u including 6 feet); Underbridge Personnel Aerial (50 feet of platform or less).
GROUP 7: Crusher Plant Engineer, Dozer (D-4, Cas Deere 450, and similar); Dual Drum Mixer, Extend Hoist and/or Winch (2 drums); Loader (over 3 and yds. up to and including 6 yards.); Mechanical F Spreader Machine (asphalt), (Barber Greene and s (Screedman required); Mine or Shaft Hoist; Mobil Mixer (over 5 tons); Pipe Bending Machine (pipel Pipe Cleaning Machine (tractor propelled and sup Pipe Wrapping Machine (tractor propelled and sup Roller Operator (Asphalt); Self-Propelled Elevat Plane; Slusher Operator; Tractor (with boom) (D-similar); Trencher (over 6 feet and less than 20 Water Tanker (pulled by Euclids, T-Pulls, DW-10, or similar); Winchman (Stern Winch on Dredge).
GROUP 8: Asphalt Plant Operator; Barge Mate (Sea Cast-in-Place Pipe Laying Machine; Concrete Batc (multiple units); Conveyor Operator (tunnel); De Dozer (D-6 and similar); Finishing Machine Opera (airports and highways); Gradesetter; Kolman Loa similar); Mucking Machine (Crawler-type); Muckin (Conveyor-type); No-Joint Pipe Laying Machine; P Crushing and Screening Plant; Power Blade Operat 12); Saurman Type Dragline (up to and including Stationary Pipe Wrapping, Cleaning and Bending M Surface Heater and Planer Operator, Tractor (D-6 similar); Tri-Batch Paver; Tunnel Badger; Tunnel and/or Boring Machine Operator Underbridge Perso Platform (over 50 feet of platform).
https://sam.gov/wage-determination/HI20260001/1 8/32
GROUP 9: Combination Mixer and Compressor (gunit Loaderand Adams Elegrader; Dozer (D-7 or equal);
and/or Ladder Trencher (over 6 feet and 200 to 7
GROUP 9A: Dozer (D-8 and similar); Gradesetter ( by the Contractor to work from drawings, plans o specifications without the direct supervision of or superintendent); Push Cat; Scrapers (up to an 20 cu. yds); Self-propelled Compactor with Dozer Self-Propelled, Rubber-Tired Earthmoving Equipme and including 20 cu. yds) (621 Band and similar) Foot; Tractor (D-8 and similar); Tractors with b than D-6, and similar).
GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Welder; Hoist and/or Winch (3 drums); Hydraulic (Koehring and similar); Loader (over 6 cu. yds.
including 12 cu. yds.); Saurman type Dragline (o yds.); Self-propelled, rubber-tired Earthmoving (over 20 cu. yds. up to and including 31 cu. yds and similar); Soil Stabilizer (P & H or equal);
(Gurries or other automatic type); Tractors (D-9 equivalent, all attachments); Tractor (Tandem Sc Watch Engineer.
GROUP 10A: Boat Operator; Cable-operated Crawler and including 25 tons); Cable-operated Power Sho Clamshell, Dragline and Backhoe (up to and inclu yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) attachments); Gradall (up to and including 1 cu.
Hydraulic Backhoe (over 3/4 cu. yds. up to and i
cu. yds.); Mobile Truck Crane Operator (up to an 25 tons) (Mobile Truck Crane Driver Required);
Self-propelled Boom Type Lifting Device (Center to and including 25 tons) (Grove, Drott, P&H, Pe similar; Trencher (over 6 feet and 750 h.p. or m Engineer (steam or electric).
GROUP 11: Automatic Slip Form Paver (concrete or https://sam.gov/wage-determination/HI20260001/1 9/32
Band Wagon (in conjunction with Wheel Excavator) Cable-operated Crawler Cranes (over 25 tons but 50 tons); Cable-operated Power Shovel, Clamshell and Backhoe (over 1 cu. yd. up to 7 cu. yds.); G (over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, e (Tandem); Earthmoving Machines (multiple propuls units and 2 or more Scrapers) (up to and includi yds.,"" struck"" m.r.c.); Highline Cableway; Hyd Backhoe (over 2 cu. yds. up to and including 4 c Leverman; Lift Slab Machine; Loader (over 12 cu.
Master Boat Operator; Mobile Truck Crane Operato tons but less than 50 tons); (Mobile Truck Crane required); Pre-stress Wire Wrapping Machine; Sel Boom-type Lifting Device (Center Mount) (over 25 m.r.c); Self-propelled Compactor (with multiple-power units); Single Engine Rubber Tired Earthmo Machine (with Tandem Scraper); Tandem Cats; Tren (pulling attached shield).
GROUP 12: Clamshell or Dipper Operator; Derricks Multi-Propulsion Earthmoving Machines (2 or more (over 35 cu. yds ""struck""m.r.c.); Operators (D Piledrivers and Cranes); Power Shovels and Dragl yds. m.r.c. and over); Self-propelled rubber-tir Earthmoving equipment (over 31 cu. yds.) (657B a similar); Wheel Excavator (up to and including 7 per hour); Wheel Excavator (over 750 cu. yds. pe
GROUP 12A: Dozer (D-11 or similar or larger); Hy Excavators (over 4 cu. yds.); Lifting cranes (50 over); Pioneering Dozer/Backhoe (initial clearin excavation for the purpose of providing access f equipment where the terrain worked involves 1-to that are 50 feet in height or depth, the scope o does not include normal clearing and grubbing on hilly terrain nor the excavation work once the a provided); Power Blade Operator (Cat 12 or equiv over); Straddle Lifts (over 50 tons); Tower Cran Traveling Truss Cranes; Universal, Liebher, Lind similar types of Tower Cranes (in the erection, https://sam.gov/wage-determination/HI20260001/1 10/32 dismantling, and moving of equipment there shall additional Operating Engineer or Heavy Duty Repa Yo-Yo Cat or Dozer.
GROUP 13: Truck Driver (Utility, Flatbed, etc.)
GROUP 13A: Dump Truck, 8 cu.yds. and under (wate Water Truck (up to and including 2,000 gallons).
GROUP 13B: Water Truck (over 2,000 gallons); Tan Truck, over 8 cu. yds. (water level).
GROUP 13C: Truck Driver (Semi-trailer. Rock Cans or Roll-Offs).
GROUP 13D: Truck Driver (Slip-In or Pup).
GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, or similar); Tractor Trailer (Hauling Equipment Trucks hooked up to Trailer (Hauling Equipment)
BOOMS AND/OR LEADS (HOURLY PREMIUMS):
The Operator of a crane (under 50 tons) with a b feet or more (including jib), or of a crane (und with leads of 100 feet or more, shall receive a premium for each hour worked on said crane (unde in accordance with the following schedule:
Booms of 80 feet up to but not including 130 feet or Leads of 100 feet up to but not including 130 feet 0.50 Booms and/or Leads of 130 feet up to but not including 180 feet 0.75 Booms and/or Leads of 180 feet up to and including 250 feet 1.15 Booms and/or Leads over 250 feet 1.50 https://sam.gov/wage-determination/HI20260001/1 11/32
The Operator of a crane (50 tons and over) with feet or more (including jib) shall receive a per premium for each hour worked on said crane (50 t over) in accordance with the following schedule:
Booms of 180 feet up to and including 250 feet 1.25 Booms over 250 feet 1.75
ENGI0003-004 09/01/2025
Rates F
Dredging: (Boat Operators) Boat Deckhand...............$ 57.94 Boat Operator...............$ 60.15 Master Boat Operator........$ 60.30 Dredging: (Clamshell or Dipper Dredging)
GROUP 1.....................$ 60.66
GROUP 2.....................$ 60.00
GROUP 3.....................$ 59.60
GROUP 4.....................$ 57.94
Dredging: (Derricks)
GROUP 1.....................$ 60.66
GROUP 2.....................$ 60.00
GROUP 3.....................$ 59.60
GROUP 4.....................$ 57.94
Dredging: (Hydraulic Suction Dredges)
GROUP 1.....................$ 60.30
GROUP 2.....................$ 60.15
GROUP 3.....................$ 60.00
GROUP 4.....................$ 59.94
GROUP 5.....................$ 37.88
Group 5.....................$ 59.60
GROUP 6.....................$ 37.77
Group 6.....................$ 59.49
GROUP 7.....................$ 36.22
https://sam.gov/wage-determination/HI20260001/1 12/32
Group 7.....................$ 57.94
CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS
GROUP 1: Clamshell or Dipper Operator.
GROUP 2: Mechanic or Welder; Watch Engineer.
GROUP 3: Barge Mate; Deckmate.
GROUP 4: Bargeman; Deckhand; Fireman; Oiler.
HYDRAULIC SUCTION DREDGING CLASSIFICATIONS
GROUP 1: Leverman.
GROUP 2: Watch Engineer (steam or electric).
GROUP 3: Mechanic or Welder.
GROUP 4: Dozer Operator.
GROUP 5: Deckmate.
GROUP 6: Winchman (Stern Winch on Dredge) GROUP 7: Deckhand (can operate anchor scow under Deckmate); Fireman; Leveeman; Oiler.
DERRICK CLASSIFICATIONS
GROUP 1: Operators (Derricks, Piledrivers and Cra GROUP 2: Saurman Type Dragline (over 5 cubic yard GROUP 3: Deckmate; Saurman Type Dragline (up to including 5 yards).
GROUP 4: Deckhand, Fireman, Oiler.
ENGI0003-044 09/01/2025
Rates F
Power Equipment Operators
(PAVING)
Asphalt Concrete Material Transfer....................$ 58.67 Asphalt Plant Operator......$ 59.07 Asphalt Raker...............$ 57.68 Asphalt Spreader Operator...$ 59.16 https://sam.gov/wage-determination/HI20260001/1 13/32
Cold Planer.................$ 59.47 Combination Loader/Backhoe (over 3/4 cu.yd.)...........$ 57.68 Combination Loader/Backhoe (up to 3/4 cu.yd.)..........$ 56.70 Concrete Saws and/or Grinder (self-propelled unit on streets, highways, airports and canals)........$ 58.64 Grader......................$ 59.47 Laborer, Hand Roller........$ 57.18 Loader (2 1/2 cu. yds. and under)......................$ 58.64 Loader (over 2 1/2 cu.
yds. to and including 5
cu. yds.)...................$ 58.96 Roller Operator (five tons and under)..................$ 57.41 Roller Operator (over five tons).......................$ 58.84 Screed Person...............$ 58.64 Soil Stabilizer.............$ 59.47
* IRON0625-001 09/01/2025
Rates F
Ironworkers:.....................$ 50.50
a. Employees will be paid $.50 per hour more whi tunnels and coffer dams; $1.00 per hour more whe work under or are covered with water (submerged) are required to work on the summit of Mauna Kea, Haleakala.
LABO0368-001 09/02/2024
Rates F
Laborers:
Driller.....................$ 44.75 https://sam.gov/wage-determination/HI20260001/1 14/32
Final Clean Up..............$ 31.40 Gunite/Shotcrete Operator and High Scaler.............$ 42.25 Laborer I...................$ 41.75 Laborer II..................$ 39.15 Mason Tender/Hod Carrier....$ 42.25 Powderman...................$ 42.75 Window Washer (bosun chair).$ 41.25
LABORERS CLASSIFICATIONS
Laborer I: Air Blasting run by electric or pneum compressor; Asphalt Laborer, Ironer, Raker, Lute Handroller, and all types of Asphalt Spreader Bo Asphalt Shoveler; Assembly and Installation of M Liner Plates, Rings, Mesh, Mats; Batching Plant and temporary); Boring Machine Operator (under s sidewalks); Buggymobile; Burning and Welding; Ch Faller, Logloader, and Bucker; Compactors (Jacks Jack and similar); Concrete Bucket Dumpman; Conc Chipping; Concrete Chuteman/Hoseman (pouring con handling of the chute from ready-mix trucks for as walls, slabs, decks, floors, foundations, foo curbs, gutters, and sidewalks); Concrete Core Cu (Walls, Floors, and Ceiling); Concrete Grinding Concrete: Hooking on, signaling, dumping of conc treme work over water on caissons, pilings, abut etc.; Concrete: Mixing, handling, conveying, pou vibrating, otherwise placing of concrete or aggr by any other process; Concrete: Operation of mot wheelbarrows or buggies or machines of similar c whether run by gas, diesel, or electric power; C Placement Machine Operator: operation of Somero Copperheads, or similar machines; Concrete Pump (laying, coupling, uncoupling of all connections cleaning of equipment); Concrete and/or Asphalt (Walking or Handtype) (cutting walls or flatwork old or new concrete and/or asphalt) (cutting for joints) (streets and ways for laying of pipe, ca conduit for all purposes); Concrete Shovelers/La https://sam.gov/wage-determination/HI20260001/1 15/32 or Dry); Concrete Screeding for Rough Strike-Off or striking-off, by hand or mechanical means pri finishing; Concrete Vibrator Operator; Coring Ho footings, piers or other obstructions for passag or conduits for any purpose and the pouring of c secure the hole; Cribbers, Shorer, Lagging, Shee Trench Jacking and Bracing, Hand-Guided Lagging Whaling Bracing; Curbing (Concrete and Asphalt) Concrete (impervious membrane and form oiler) m other materials by any mode or method; Cut Grani Setter (setting, leveling and grouting of all pr concrete or stone curbs); Cutting and Burning To (demolition); Dri Pak-It Machine; Environmental removal of asbestos, lead, and bio hazardous mat and/or OSHA certified); Falling, bucking, yardin or burning of all trees or timber on constructio Forklift (9 ft. and under); Gas, Pneumatic, and tools; Grating and Grill work for drains or othe Green Cutter of concrete or aggregate in any for mechanical means, grindstone or air and/or water Spreading for any purpose; Guinea Chaser (Grade for general utility trenches, sitework, and exca Headerboard Man (Asphalt or Concrete); Heat Weld Plastic (Laborers' AGC certified workers) (when involves waterproofing for waterponds, artificia reservoir) heat welding for sewer pipes and fusi pipes; Heavy Highway Laborer (Rigging, signaling and installation of pre-cast catch basins, manho and gutters); High Pressure Nozzleman - Hydrauli (over 100# pressure); Jackhammer Operator; Jacki forms: All semi and unskilled work connected the Laying of all multi-cell conduit or multi-purpos Magnesite and Mastic Workers (Wet or Dry)(includ operator);Mortar Man; Mortar Mixer (Block, Brick and Plastering); Nozzleman (Sandblasting and/or Blasting): handling, placing and operation of no Operation, Manual or Hydraulic jacking of shield use of such other mechanical equipment as may be Pavement Breakers; Paving, curbing and surfacing streets, ways, courts, under and overpasses, bri https://sam.gov/wage-determination/HI20260001/1 16/32 approaches, slope walls, and all other labor con therewith; Pilecutters; Pipe Accessment in place and lining up of sectional metal or other pipe i corrugated pipe; Pipelayer performing all servic laying and installation of pipe from the point o pipe in the ditch until completion of operation, any and all forms of tubular material, whether p metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conve substance or element, whether water, sewage, sol air, or other product whatsoever and without reg nature of material from which tubular material i fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men asphalt, Laykold, treating Creosote and similar-materials (6-inch) pipe and over); Piping: resur paving of all ditches in preparation for laying pipes; Pipe laying of lateral sewer pipe from ma sewer to buildings or structure (except Contacto direct work be done under proper supervision); P leveling and marking of the joint used for main sewers and storm sewers; Laying of all clay, ter ironstone, vitrified concrete, HDPE or other pip drainage; Placing and setting of water mains, ga all pipe including removal of skids; Plaster Mor Mixer/Pump; Pneumatic Impact Wrench; Portable Sa Operation: Choker setters, off bearers, and lumb connected with clearing; Posthole Digger (Hand H Air and Electric); Powderman's Tender; Power Bro (Small); Preparation and Compaction of roadbeds railroad track laying, highway construction, and preparation of trenches, footings, etc., for cro transmission by pipelines, electrical transmissi underground lines or cables (by mechanical means of structure by manual or hydraulic jacks or oth and resetting of structure in new locations, inc concrete work; Ramming or compaction; Rigging in with Laborers' work (except demolition), Signali (including the use of walkie talkie) Choke Setti line usage; Tagging and Signaling of building ma https://sam.gov/wage-determination/HI20260001/1 17/32 into high rise units; Riprap, Stonepaver, and Ro (includes placement of stacked concrete, wet or loading, unloading, signaling, slinging and sett other similar materials); Rotary Scarifier (incl multiple head concrete chipping Scarifier); Sala Heater, Drying of plaster, concrete mortar or ot aggregate; Scaffold Erector Leadman; Scaffolds:
hanging) including maintenance thereof; Scaler;
Tank/Cesspool and Drain Fields Digger and Instal Shredder/Chipper (tree branches, brush, etc.); S and Setting Forms; Stripping of Forms: Other tha forms which are to be re-used in their original stripping of forms on all flat arch work; Tamper Wacker, and similar type); Tank Scaler and Clean Tarman; Tree Climbers and Trimmers; Trencher (in hand-held, Davis T-66 and similar type); Trucks to and including 2 1/2 tons when used in connect on-site Laborers'work; Trucks (Refuse and Garbag (from job site to dump); Vibra-Screed (Bull Floa connection with Laborers' work); Well Points, In of or any other dewatering system.
Laborer II: Asphalt Plant Laborer; Boring Machi Bridge Laborer; Burning of all debris (crates, b packaging waste materials); Chainman, Rodmen, a Markers; Cleaning, clearing, grading and/or remo streets, highways, roadways, aprons, runways, si parking areas, airports, approaches, and other s installations; Cleaning or reconditioning of str sewers and waterlines, all maintenance work and unskilled and semi-skilled nature; Concrete Buck (Groundman) hooking and unhooking of bucket; Con Forms; moving, cleaning, oiling and carrying to point of erection of all forms; Concrete Product Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Laborers and all other similar plants; Demolitio and Salvage Laborers: Wrecking and dismantling o and all structures, with use of cutting or wreck breaking away, cleaning and removal of all fixtu https://sam.gov/wage-determination/HI20260001/1 18/32 hooking, unhooking, signaling of materials for s scrap removed by crane or derrick; Digging under roadways, aprons or other paved surfaces; Drille Chuck Tender, Outside Nipper; Dry-packing of con (plugging and filling of she-bolt holes); Fence Guardrail Erector: Dismantling and/or re-install all fence; Finegrader; Firewatcher; Flagman (Con preparing, stablishing and removing portable roa barricade devices); Signal Men on all constructi defined herein, including Traffic Control Signal construction site; General Excavation; Backfilli and all other labor connected therewith; Digging trenches, ditches and manholes and the leveling, and other preparation prior to laying pipe or co any purpose; Excavations and foundations for bui piers, foundations and holes, and all other cons Preparation of street ways and bridges; General Cleaning and Clearing of all debris and surplus Clean-up of right-of-way. Clearing and slashing trees by hand or mechanical cutting. General Cle sweeping, cleaning, wash-down, wiping of constru facility and equipment (other than ""Light Clean (Janitorial) Laborer. Garbage and Debris Handler Cleaners. Appliance Handling (job site) (after d unlading in storage area); Ground and Soil Treat (Pest Control); Gunite/Shotcrete Operator Tender Laborers (same as Salvage Yard); Laser Beam ""Ta connection with Laborers' work; Layout Person fo (when work involves waterproofing for waterponds artificial lakes and reservoirs); Limbers, Brush and Pilers; Loading, Unloading, carrying, distri handling of all rods and material for use in rei concrete construction (except when a derrick or operated by other than hand power is used); Load unloading, sorting, stockpiling, handling and di of water mains, gas mains and all pipes; Loading unloading of all materials, fixtures, furnishing appliances from point of delivery to stockpile t installation; hooking and signaling from truck, or stockpile; Material Yard Laborers; Pipelayer https://sam.gov/wage-determination/HI20260001/1 19/32
Pipewrapper, Caulker, Bander, Kettlemen, and men asphalt, Laykold, Creosote, and similar-type mat (pipe under 6 inches); Plasterer Laborer; Prepar construction and maintenance of roadbeds and sub all paving, including excavation, dumping, and s sub-grade material; Prestressed or precast concr walls, or sections: all loading, unloading, stoc hooking on of such slabs, walls or sections; Qua Laborers; Railroad, Streetcar, and Rail Transit and Repair; Roustabout; Rubbish Trucks in connec Building Construction Projects (excluding cleari grubbing, and excavating); Salvage Yard: All wor with cutting, cleaning, storing, stockpiling or materials, all cleanup, removal of debris, burni back-filling and landscaping of the site; Sandbl Tender (Pot Tender): Hoses and pots or markers;
Erection, planking and removal of all scaffolds support for lathers, plasters, brick layers, mas other construction trades crafts; Scaffolds: (Sp designed by carpenters) laborers shall tend said on erection and dismantling thereof, preparation foundation or mudsills, maintenance; Scraping of Screeds: Handling of all screeds to be reused; h dismantling and conveyance of screeds; Setting, and securing or bracing of metal or other road f expansion joints; Sheeting Piling/trench shoring and placing of skip sheet or wood plank trench s Ship Scalers; Shipwright Tender; Sign Erector (s traffic, regulatory, and street-name signs); Slo Seal Crews (Mixer Operator, Applicator, Squeegee Shuttle Man, Top Man); Snapping of wall ties and tie rods; Soil Test operations of semi and unski such as filling sand bags; Striper (Asphalt, Con other Paved Surfaces); Tool Room Attendant (Job Traffic Delineating Device Applicator; Underpinn lagging, bracing, propping and shoring, loading, right-of-way clearance along the route of moveme clearance of new site, excavation of foundation a house or structure from old site to new site;
employees; Water Man; Waterscape/Hardscape Labor https://sam.gov/wage-determination/HI20260001/1 20/32
Mesh Pulling (all concrete pouring operations);
stripping, dismantling and handling concrete for work.
LABO0368-002 09/03/2024
Rates F
Landscape & Irrigation Laborers
GROUP 1.....................$ 28.40
GROUP 2.....................$ 29.40
GROUP 3.....................$ 23.00
LABORERS CLASSIFICATIONS
GROUP 1: Installation of non-potable permanent o irrigation water systems performed for the purpo Landscaping and Irrigation architectural horticu work; the installation of drinking fountains and or temporary irrigation systems using potable wa Landscaping and Irrigation architectural horticu purposes only. This work includes (a) the instal all heads, risers, valves, valve boxes, vacuum b (pressure and non-pressure), low voltage electri and, provided such work involves electrical wiri will carry 24 volts or less, the installation of master control panels, display boards, junction conductors, including all other components for c
(b) and metallic (copper, brass, galvanized, or pipe, as well as PVC or other plastic pipe inclu work incidental thereto, i.e., unloading, handli distribution of all pipes fittings, tools, mater equipment, (c) all soldering work in connection above whether done by torch, soldering iron, or means; (d) tie-in to main lines, thrust blocks ( precast and poured in place), pipe hangers and s incidental to installation of the entire irrigat
(e) making of pressure tests, start-up testing, https://sam.gov/wage-determination/HI20260001/1 21/32 purging, water balancing, placing into operation irrigation equipment, fixtures and appurtenances under this agreement, and (f) the fabrication, r repair and servicing oflandscaping and irrigatio Operation of hand-held gas, air, electric, or se tools and equipment used in the performance of L and Irrigation work in connection with architect horticulture; Choke-setting, signaling, and rigg equipment operators on job-site in the performan Landscaping and Irrigation work; Concrete work ( performed in connection with such Landscaping an Irrigation work. This work shall also include th of rock, stone, or riprap in connection with suc Landscape, Waterscape, Rockscape, and Irrigation Grubbing, pick and shovel excavation, and hand r tamping in connection with the performance of su Landscaping and Irrigation work; Sprigging, hand and planting of trees, shrubs, ground covers, an plantings and the performance of all types of ga horticultural work relating to said planting; Op flat bed trucks (up to and including 2 1/2 tons)
GROUP 2. Layout of irrigation and other non-pota irrigation water systems and the layout of drink fountains and other potable irrigation water sys connection with such Landscaping and Irrigation includes the layout of all heads, risers, valves boxes, vacuum breakers, low voltage electrical l hydraulic and electrical controllers, and metall (coppers, brass, galvanized, or similar) pipe, a PVC or other plastic pipe. This work also inclu reading and interpretation of plans and specific connection with the layout of Landscaping, Rocks Waterscape, and Irrigation work; Operation of Hydro-Mulching machines (sprayman and driver), D Trenchers (riding type, Davis T-66, and similar) lifts used in connection with the performance of Landscaping and Irrigation work; Tree climbers a saw tree trimmers, Sporadic operation (when used connection with Landscaping, Rockscape, Watersca https://sam.gov/wage-determination/HI20260001/1 22/32
Irrigation work) of Skid-Steer Loaders (Bobcat a similar), Cranes (Bantam, Grove, and similar), H Backhoes, Loaders, Rollers, and Dozers (Case, Jo and similar), Water Trucks, Trucks requiring a S Hawaii Public Utilities Commission Type 5 and/or license, sit-down type and ""gang"" mowers, and self-propelled, sit-down operated machines not l Landscape & Irrigation Maintenance Laborer; Chem spraying using self-propelled power spraying equ gallon capacity or more).
GROUP 3: Maintenance of trees, shrubs, ground co and other planted areas, including the replantin shrubs, ground covers, and other plantings that ""take"" or which are damaged; provided, however re-planting that requires the use of equipment, or power tools shall be paid for at the rate of specified under Landscape and Irrigation Laborer Raking, mowing, trimming, and runing, including ""weed eaters"", hedge trimmers, vacuums, blower hand-held gas, air, electric, or self-powered to the operation of lawn mowers (Note: The operatio sit-down type and ""gang"" mowers shall be paid rate of pay specified under Landscape & Irrigati Group 2); Guywiring, staking, propping, and supp trees; Fertilizing, Chemical spraying using spra with less than 200 gallon capacity, Maintaining and sprinkler systems, including the staking, cl adjustment of risers, and the adjustment and/or of sprinkler heads, (Note: the cleaning and glui and fittings shall be paid for at the rate of pa under Landscape & Irrigation Laborer(Group 1); W hand or sprinkler system and the peformance of o of gardening, yardman, and horticultural-related
LABO0368-003 09/02/2024
Rates F https://sam.gov/wage-determination/HI20260001/1 23/32
Underground Laborer
GROUP 1.....................$ 42.35
GROUP 2.....................$ 43.85
GROUP 3.....................$ 44.35
GROUP 4.....................$ 45.35
GROUP 5.....................$ 45.70
GROUP 6.....................$ 45.95
GROUP 7.....................$ 46.40
GROUP 1: Watchmen; Change House Attendant.
GROUP 2: Swamper; Brakeman; Bull Gang-Muckers, T Dumpmen (any method); Concrete Crew (includes ro spreading); Grout Crew; Reboundmen
GROUP 3: Chucktenders and Cabletenders; Powderma House); Vibratorman, Pavement Breakers
GROUP 4: Miners - Tunnel (including top and bott shaft and raise work); Timberman, Retimberman (w steel or substitute materials thereof); Blasters Powderman (in heading); Microtunnel Laborer; Hea Cherry Pickerman (where car is lifted); Nipper;
Gunmen; Grout Pumpman & Potman; Gunite, Shotcret Potmen; Concrete Finisher (in tunnel); Concrete Bit Grinder; Steel Form Raisers & Setters; High Nozzleman; Nozzleman (on slick line); Sandblaste (combination work assignment interchangeable); T
GROUP 5: Shaft Work & Raise (below actual or exc level); Diamond Driller; Gunite or Shotcrete Noz Rodman; Groundman
GROUP 6: Shifter
GROUP 7: Shifter (Shaft Work & Raiser)
PAIN1791-001 07/01/2025
https://sam.gov/wage-determination/HI20260001/1 24/32
Painters:
Brush.......................$ 44.05 Sandblaster; Spray..........$ 44.05
PAIN1889-001 07/01/2025
Rates F
Glaziers.........................$ 48.50
PAIN1926-001 03/02/2025
Rates F
Soft Floor Layers................$ 43.27
PAIN1944-001 01/01/2025
Rates F
Taper............................$ 47.36
PLAS0630-001 09/04/2023
Rates F
PLASTERER........................$ 46.12
PLAS0630-002 09/04/2023
Rates F
Cement Masons:
Cement Masons...............$ 44.12 Trowel Machine Operators....$ 44.27
PLUM0675-001 07/06/2025
https://sam.gov/wage-determination/HI20260001/1 25/32
Plumber, Pipefitter, Steamfitter & Sprinkler Fitter...$ 53.83
ROOF0221-001 11/06/2022
Rates F
Roofers (Including Built Up, Composition and Single Ply)......$ 43.15
SHEE0293-001 03/02/2025
Rates F
Sheet metal worker...............$ 50.16
SUHI1997-002 09/15/1997
Rates F
Drapery Installer................$ 13.60
FENCE ERECTOR (Chain Link Fence)...........................$ 9.33
WELDERS - Receive rate prescribed for craft perfor operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Pai for Federal Contractors applies to all contracts s Davis-Bacon Act for which the contract is awarded solicitation was issued) on or after January 1, 20 contract is covered by the EO, the contractor must employees with 1 hour of paid sick leave for every they work, up to 56 hours of paid sick leave each https://sam.gov/wage-determination/HI20260001/1 26/32
Employees must be permitted to use paid sick leave own illness, injury or other health-related needs, preventive care; to assist a family member (or per like family to the employee) who is ill, injured, health-related needs, including preventive care; o resulting from, or to assist a family member (or p like family to the employee) who is a victim of, d violence, sexual assault, or stalking. Additional on contractor requirements and worker protections is available at https://www.dol.gov/agencies/whd/government-contra
Note: Executive Order 13658 generally applies to c subject to the Davis-Bacon Act that were awarded o January 1, 2015 and January 29, 2022, and that hav renewed or extended on or after January 30, 2022.
Order 13658 does not apply to contracts subject on Davis-Bacon Related Acts regardless of when they w If a contract is subject to Executive Order 13658, contractor must pay all covered workers at least $ hour (or the applicable wage rate listed on this w determination, if it is higher) for all hours spen on the contract in 2025. The applicable Executive minimum wage rate will be adjusted annually. Add information on contractor requirements and worker under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not inclu the scope of the classifications listed may be add award only as provided in the labor standards cont (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the clas and wage rates that have been found to be prevaili type(s) of construction and geographic area covere determination. The classifications are listed in a https://sam.gov/wage-determination/HI20260001/1 27/32 order under rate identifiers indicating whether th rate is a union rate (current union negotiated rat rate, a weighted union average rate, a state adopt supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a uni prevailing for that classification in the survey.
PLUM0198-005 07/01/2024. PLUM is an identifier of whose collectively bargained rate prevailed in the this classification, which in this example would b 0198 indicates the local union number or district number where applicable, i.e., Plumbers Local 0198 number, 005 in the example, is an internal number processing the wage determination. The date, 07/01 example, is the effective date of the most current rate.
Union prevailing wage rates are updated to reflect over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) gover classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate those classifications, but that 100% of the data r the classifications reflected union rates. EXAMPLE UAVG-OH-0010 01/01/2024. UAVG indicates that the r weighted union average rate. OH indicates the Stat The next number, 0010 in the example, is an intern used in producing the wage determination. The date in the example, indicates the date the wage determ updated to reflect the most current union average
A UAVG rate will be updated once a year, usually i reflect a weighted average of the current rates in collective bargaining agreements on which the rate https://sam.gov/wage-determination/HI20260001/1 28/32
Survey Rate Identifiers
The ""SU"" identifier indicates that either a sing rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was computing a weighted average rate based on all the reported in the survey for that classification. As average rate includes all rates reported in the su include both union and non-union rates. Example: S 6/27/2024. SU indicates the rate is a single non-u prevailing rate or a weighted average of survey da classification. FL indicates the State of Florida.
year of the survey on which these classifications based. The next number, 007 in the example, is an number used in producing the wage determination. T 6/27/2024 in the example, indicates the survey com for the classifications and rates under that ident
?SU? wage rates typically remain in effect until a is conducted. However, the Wage and Hour Division discretion to update such rates under 29 CFR 1.6(c
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classific prevailing wage rates set by a state (or local) go adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2 01/03/2024. SA reflects that the rates are state a refers to the State of Maine. 2023 is the year dur state completed the survey on which the listed cla and rates are based. The next number, 007 in the e internal number used in producing the wage determi The date, 01/03/2024 in the example, reflects the the classifications and rates under the ?SA? ident effect under state law in the state from which the adopted.
https://sam.gov/wage-determination/HI20260001/1 29/32
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matte be:
a) a survey underlying a wage determina
b) an existing published wage determina
c) an initial WHD letter setting forth a position a wage determination matter
d) an initial conformance (additional classificati and rate) determination
On survey related matters, initial contact, includ for summaries of surveys, should be directed to th of Wage Surveys. Requests can be submitted via ema davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such conformance decisions, requests for initial decisi directed to the WHD Branch of Construction Wage De Requests can be submitted via email to BCWD-Office by mail to:
Branch of Construction Wage Determinat Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then an party (those affected by the action) that disagree decision can request review and reconsideration fr and Hour Administrator (See 29 CFR Part 1.8 and 29 Requests for review and reconsideration can be sub https://sam.gov/wage-determination/HI20260001/1 30/32
History
Jan 16, 2026 HI20260001 - Modification 1 email to dba.reconsideration@dol.gov or by mail to
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statem interested party's position and any information (w data, project description, area practice material, the requestor considers relevant to the issue.
3) If the decision of the Administrator is not fav interested party may appeal directly to the Admini Review Board (formerly the Wage Appeals Board). W
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION"
https://sam.gov/wage-determination/HI20260001/1 31/32
WARNING
SAM.gov
An official website of the U.S. General Services Administration
Jan 16, 2026 HI20260001 - Modification 0
Our Website
About This Site
Our Community
Release Notes
System Alerts
Our Partners
Acquisition.gov
USASpending.gov
Grants.gov
More Partners
Policies
Terms of Use
Privacy Policy
Restricted Data Use
Freedom of Information Act
Accessibility
Customer Service
Help
Check Entity Status
Federal Service Desk
External Resources
Contact
This is a U.S. General Services Administration Federal Government computer system that is "FOR OFFICIAL USE ONLY." This system is subject to monitoring. Individuals found performing unauthorized activities are subject to disciplinary action including criminal prosecution.
This system contains Controlled Unclassified Information (CUI). All individuals viewing, reproducing or disposing of this information are required to protect it in accordance with 32 CFR Part 2002 and GSA Order CIO 2103.2 CUI Policy.
3/30/26, 11:23 AM SAM.gov https://sam.gov/wage-determination/HI20260001/1 32/32 https://sam.gov/wage-determination/HI20260001/0 https://sam.gov/about/this-site https://interact.gsa.gov/group/integrated-award-environment-iae-industry-community https://www.fsd.gov/gsafsd_sp?id=kb_category&kb_category=ccf4380a1ba67410fe314000f54bcb16&kb_id=f66d8e6cdb76d4100d73f81d0f9619c https://sam.gov/alerts https://acquisition.gov/ https://usaspending.gov/ https://grants.gov/ https://sam.gov/about/partners https://sam.gov/about/terms-of-use https://sam.gov/about/terms-of-use#privacy https://sam.gov/about/terms-of-use#restricted https://www.gsa.gov/reference/freedom-of-information-act-foia https://sam.gov/about/accessibility https://sam.gov/help https://sam.gov/content/status-tracker https://www.fsd.gov/gsafsd_sp https://sam.gov/about/external-resources https://sam.gov/about/contact https://www.gsa.gov/
File details come from the government source that posted it. Updated .