This document is a Statement of Work (SOW) for the National Park Service Glacier Bay National Park & Preserve Radio Repeater and Shelter Replacement project. The project involves replacing repeater components at five sites: Althorp, Beartrack, Deception Hill, Idaho, and Jackie Point. The contractor will be responsible for replacing existing radio equipment, including UHF/VHF repeater modules, duplexers, antennas, and associated hardware. Specific tasks include site visits, equipment verification, transportation of components, installation of new equipment, and potential shelter replacement at some sites.
The contract includes a base bid for replacing repeater equipment at Althorp and Beartrack, with additional options for replacing equipment at other sites, shelter replacements, and debris removal. The project requires helicopter transportation, with an estimated two to three flights per site. The work must be completed between a site visit in September 2025 and July 31, 2026. The contractor must provide all tools, equipment, and labor, while the National Park Service will supply specific radio and solar equipment. The project involves detailed specifications for equipment installation, solar panel and battery replacement, and site restoration, with strict requirements for equipment mounting, wiring, and overall site configuration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P9725Q0047_Amd_0005.pdf | ||
| Sol_140P9725Q0047_Amd_0004.pdf | ||
| Sol_140P9725Q0047_Amd_0003.pdf | ||
| Sol_140P9725Q0047_Amd_0002.pdf | ||
| Sol_140P9725Q0047_Amd_0001.pdf | ||
| B08_Attach_5__Past_Peformance_Questionnaire_3pg.docx | DOCX document | |
| B08_Attach_2__Bid_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P9725Q0047.pdf | ||
| B08_Attach_4_Project_Experience_Questionnaire_1_pg.docx | DOCX document | |
| B08_Attach_3_WD_2015-5687_v_24_12_23_24-22pg.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
National Park Service
Glacier Bay National Park & Preserve
Radio Repeater and Shelter Replacement
1. GENERAL PROJECT DESCRIPTION:
This project replaces repeater components at four sites and a new repeater installation at a fifth site all within Glacier Bay National Park & Preserve (GLBA, see map in Attachment A).
Representative photos of the repeater site and components can be found in Attachment B. The Contractor shall furnish all labor, supplies, equipment, and material (other than those identified in Attachment C to be provided by the National Park Service (NPS) to install the repeater components as specified in the description of tasks. The Contractor shall provide the NPS all requested reports, and supporting material developed during the period of service. During the performance of work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of work, and fully acknowledge the National Park Service in any published or formally presented material developed or derived from this contract.
The repeater is comprised of various types of equipment, which are summarized in Attachment C. All repeater components currently on site shall be replaced as listed in Attachment C.
Historically transportation to replace similar equipment includes at least two flights for equipment and one flight for installation personnel (round trip). More flights will likely be required if the shelter replacement option is awarded. Contractor is responsible for confirming the number of flights that will be required to complete the work of this contract and options and including all associated costs in their estimate. Other than sealed batteries, no hazardous materials have been identified as part of this project.
2. DESCRIPTION OF TASKS:
A. If the selected contractor has not previously performed work on Alaska National Parks repeater systems, up to 2 representatives from the contractor and one NPS employee shall participate in a site visit to Althorp September 30, 2025, to familiarize the contractor and park staff with general system components. The specific date will be coordinated between the NPS and the contractor to identify a mutually agreeable date and back-up dates, if needed
B. The Contractor and NPS staff shall review the repeaters/modules, duplexers, antennas, and general hardware provided by the NPS to verify functionality at the Anchorage Radio Shop. This will document that any issues with functionality post-installation are the responsibility of the Contractor and that the NPS has provided all necessary components and hardware. All NPS supplied items will be located at the Alaska NPS Radio shop, 5100 Cordova Street, Anchorage, Alaska unless otherwise indicated in Attachment C.
C. Contractor shall package all NPS-supplied equipment and transport the items from Anchorage to the two (3, 4 or 5) repeater sites listed in Table 1 below. Solar panels for the Beartrack site are located at the park headquarters in Gustavus, AK.
Table 1: Description of repeater sites Repeater Latitude Longitude Elevation Source of Information Althorp N 58.093288 W 136.415473 2,336ft inReach - decimal degree Beartrack N 58:36.771 W 135:52.009 2,368ft Radio Shop Master book -degrees minutes seconds Deception Hill N 59:05.825 W 138:12.449 2,320ft Radio Shop Master book -degrees minutes seconds Idaho N 58:53.640 W 136:19.296 3,774ft Radio Shop Master book -degrees minutes seconds Jackie Point N 58.941832 W 136.946314 2,602ft inReach - decimal degree
Attachments A & B are provided as additional background:
Attachment A - Glacier Bay National Park and Preserve Radio Infrastructure Map Attachment B - GLBA Site Specific Information and Photos
D. If the shelter option(s) is awarded: The contractor shall remove old shelter and foundation materials, and provide a new foundation constructed from ground rated pressure treated timbers laid out in sufficient number to properly support the new shelter and as per manufacturer’s recommendations. Install the new hard sided shelter with the appropriate anchoring and grounding methods to ensure compliance with industry standards and manufacturer’s stated warranty of product. The shelter shall be muted in color and meet the specifications as listed in Attachment D. The final shelter location shall be in the same footprint as the existing equipment. The old shelter and foundation materials shall be removed from the site and legally disposed of by the contractor outside of the park boundaries.
E. If the shelter option(s) is NOT awarded: Contractor shall inspect exterior duckbills, anchors, cabling, and turnbuckles and adjust to industry standards, replacing any components that have become comprised and/or show signs of rust or degradation as part of the Base Bid.
F. Install NPS equipment according to industry standards and specifications in:
Attachment C - GLBA Parts List by site Attachment D - GLBA Radio Shelter Specifications Attachment E - GLBA Replacement Specifications
G. The Contractor must provide a minimum of 72 hours advance notice prior to working on the system and shall notify the park when work is finished and/or stopped for greater than a 12-hour period. The Contractor shall complete work with no break, other than that which is required for weather or safety. The contractor shall organize work to complete all required tasks while minimizing downtime of the repeater to the maximum extent possible.
H. Install NPS-supplied antenna and mast set at height that complies with manufacturers warranted specifications in terms of load/grounding that affords for an effective transmission/signal for GLBA communications. Installation shall meet all Motorola R56 Standards and Guidelines for Communication Sites.
I. Contractor shall verify the functionality of each repeater site following the work to ensure it is functioning properly. The NPS will coordinate with the contractor to provide a handheld radio for testing purposes, if requested.
J. Contractor shall take and provide the NPS with detailed photos documenting the completed installation of required components as outlined in this statement of work.
K. Items Removed: Contractor shall collect all construction-related debris, remove from the site, and dispose of all items in accordance with Alaska DEC requirements and other applicable regulations. All repeaters/modules, and duplexers shall be returned by the contractor to the Radio Shop office in Anchorage. A certificate of recycling shall be provided to the project COR prior to project close out.
3. CONTRACTOR’S USE OF PREMISES
A. Conduct of Operations: The contractor shall conduct their operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
B. On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday.
C. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
4. SCHEDULE OF WORK AND SUBMITTALS:
The contractor shall complete the installation as identified in Attachments C, D & E after the site visit in 2025 and before July 31, 2026.
The NPS shall conduct post-installation inspections to verify functionality the repeater site to specification before contract close out.
5. NPS FURNISHED MATERIALS:
The NPS shall provide only the materials listed in appendix C to be collected by the Contractor from the Alaska NPS Radio shop located at 5100 Cordova Street, Anchorage, Alaska. All programming shall be completed by the NPS before the repeaters are given to the contractor. Prior to final acceptance, the NPS shall perform a pre-acceptance inspection once the contractors work is complete. The NPS shall be responsible for acquisition of their own helicopter transportation to the site for pre-acceptance inspections at each site.
6. CONTRACTOR FURNISHED EQUIPMENT & MATERIALS:
The contractor shall provide all tools and equipment (for example and not limited to, drills, wrenches) to complete the tasks listed above. The contractor shall provide components as listed in Attachment C and any other materials and components that are not listed but are required to complete the work.
Aviation Requirements: The contractor shall be responsible for acquisition of the helicopter for their contractor staff site visit, installation, and for any contractor inspection flights prior to the completion of work. Should additional pre-acceptance inspections be required due to incomplete or insufficient work as found during the NPS’s initial pre-acceptance inspection, additional flights for NPS-personnel shall be at the expense of the contractor.
For all flights where NPS personnel are on-board, pilot and aircraft must be OAS certified and all NPS policies and OAS IDIQ requirements (available upon request) must be followed (including PPE, PASP, flight manager, flight following, fuel etc.).
7. DEFINITION OF BID ITEMS:
A. BASE BID ITEM 1: Replace Althorp and Beartrack Repeater Equipment - Fixed Price/Lump Sum Price
B. OPTION 1: Replace Althorp shelter and disposal of old shelter and foundation - Fixed Price/Lump Sum Price
C. OPTION 2: Replace Deception Hill Repeater Equipment - Fixed Price/Lump Sum Price
D. OPTION 3: Replace Idaho Repeater Equipment - Fixed Price/Lump Sum Price
E. OPTION 4: Supply a new Radio Repeater Shelter to Park Headquarters in Gustavus -
Fixed Price/Lump Sum Price
F. OPTION 5: Supply and install new Radio Repeater Equipment and Shelter with Foundation at the Jackie Point site.- Fixed Price/Lump Sum Price
G. OPTION 6: Haul out and dispose of old repeater components and batteries from the
Althorp site and dispose of in accordance with Alaska DEC requirements as shown in the pictures of Appendix B, “Removal of Debris at Althorp” - Fixed Price/Lump Sum Price
NOTE: Only Option 4 OR Option 5 will be awarded.
8. POINTS OF CONTACT:
A. Point of Contact:
AKRO Radio Shop Manager Walter DeGroat National Park Service, Alaska Regional Office 240 W. 5th Avenue Anchorage, Alaska 99501 walter_degroat@NPS.gov Tel: (907) 644-3722
B. Contracting Office for Contractual Support:
Janet Milson– Contract Specialist National Parks Service, Alaska Regional Office 240 W. 5th Ave. Anchorage, AK 99501 janet_milson@nsp.govTel: (907) 201-2581
9. SUBMIT INVOICE(S) TO:
Submit an invoice into Invoice Processing Platform (IPP) with a copy of the invoice to the COR (see FAR 32.905 for proper invoicing), and a copy to the Contracting Office.
10. PERIOD OF PERFORMANCE (POP):
Period of performance is from the date of the award until July 31, 2026.
11. CONTRACTING OFFICER’S AUTHORITY:
The Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:
(1) direct or negotiate any changes in the Statement of Work or specifications.
(2) modify or extend the period of performance;
(3) change the delivery schedule; or
(4) otherwise change any terms and conditions of this contract.
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and not withstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
Attachment A
Glacier Bay National Park and Preserve Radio Infrastructure Map
Attachment B GLBA Site Specific Information and Photos
Althorp
Althorp is located approximately 34.5 miles southwest of Gustavus.
• Repeater is located at approximate GPS: N 58.093288 W 136.415473 - decimal degree, Elevation 2,336 FT
• Work at this site includes replacing the existing Park Operations (Park Ops) repeater equipment and installing a second and new parallel Law Enforcement (LE) repeater system so that when work is done Park Operations and Law Enforcement communication can occur independently on separate channels. When work at Althorp is complete if shall function similarly to the Beartrack site.
• Equipment is housed in a standard radio repeater shelter. Work shall include replacing all equipment as listed in Appendix C; NPS furnished equipment is highlighted in grey.
• Option 1 of this contract covers the replacement of the existing shelter with one (1) new shelter capable of housing all repeater equipment, a new treated lumber foundation, and removal of the old shelter and timber foundation.
• If Option 1 is not awarded then duckbills, anchors, cabling, and turnbuckles shall be checked for integrity and replaced if there are any signs of degradation.
Beartrack
Beartrack is located approximately 14 miles north-northwest of Gustavus.
• Repeater is located at approximate GPS: N 58:36.771 W 135:52.009 - degrees minutes seconds, Elevation 2,368 FT
• At Beartrack independent Park Operations and Law Enforcement repeater systems already exist. Work at this site shall replace UHF/VHF repeater modules for both repeaters and all other system equipment.
• Equipment is housed in a standard radio repeater shelter. Work shall include replacing all equipment as listed in Appendix C; NPS furnished equipment is highlighted in grey.
• The shelter is not being replaced at this site. Duckbills, anchors, cabling, and turnbuckles shall be checked for integrity and replaced if there are any signs of degradation..
Beartrack
When contract is complete, all repeater sites shall have a 2 repeater/2 duplexer rack installed in a neat and orderly manner as shown above.
Deception Hill
Deception Hill is located approximately 101 miles northwest of Gustavus.
• Repeater is located at approximate GPS: N 59:05.825 W 138:12.449 - degrees minutes seconds, Elevation 2,320 FT
• Work at this site includes replacing the existing Park Operations (Park Ops) repeater equipment and installing a second and new parallel Law Enforcement (LE) repeater system so that when work is complete Park Operations and Law Enforcement communication can occur independently on separate channels. When work at Deception Hill is complete it shall function similarly to the Beartrack site.
• Equipment is housed in a standard radio repeater shelter. Work shall include replacing all equipment as listed in Appendix C; NPS furnished equipment is highlighted in grey.
• The shelter is not being replaced so duckbills, anchors, cabling, and turnbuckles are not applicable for this sight but shall be checked for integrity and replaced as necessary.
Idaho
Idaho is located approximately 39 miles northwest of Gustavus.
• Repeater is located at approximate GPS: N 58:53.640 W 136:19.296 - degrees minutes seconds, Elevation 3,774 FT
• Work at this site includes replacing the existing Park Operations (Park Ops) repeater equipment and installing a second and new parallel Law Enforcement (LE) repeater system so that when work is complete Park Operations and Law Enforcement communication can occur independently on separate channels. When work at Idaho is complete if shall function similarly to the Beartrack site.
• Equipment is housed in a standard radio repeater shelter. Work shall include replacing all equipment as listed in Appendix C; NPS furnished equipment is highlighted in grey.
• The shelter is not being replaced so duckbills, anchors, cabling, and turnbuckles are not applicable for this sight but shall be checked for integrity and replaced as necessary.
Idaho
Jackie Point
Jackie Point is located approximately 57 miles northwest of Gustavus.
• The new repeater site is located at approximate GPS: N 58.941832 W 136.946314 -decimal degree, Elevation 2,602 FT. Currently the NPS has a small portable repeater at the site as shown in the pictures below.
• Work at this site includes installing all new equipment for new Park Operations (Park Ops) and Law Enforcement (LE) repeater systems. When work is complete this new repeater site shall be similar in the configuration to the Beartrack site. Equipment shall be housed in a new standard radio repeater shelter with treated timber foundation.
• Work shall include installing all equipment as listed in Appendix C; NPS furnished equipment is highlighted in grey.
• Anchoring with duckbills is anticipated but the contractor may need to use rock anchors which shall be contractor provided.
Jackie Point
Removal of Debris at Althorp
Option 5 of the contract is to remove all debris from the Althorp site. Items to remove are primarily shown in the pictures below but there may also be some minor debris that is not shown.
an old pallet lumber,2 metal ladders old lumber lumber/timbers lumber & ladders different angle, lumber, metal battery box-est.
weight 255 lbs wood box, 2-3 concrete blocks timber, metal battery box-est. weight 255 lbs concrete block lumber & ladders, different angle, metal battery box, est 255 lbs lumber & ladders, different angle
Attachment C GLBA Parts List by site
Bid
Item Location Description Recommended Source Component Details Quantity/site
Base Bid Althorp New LE Repeater NPS Supplied Codan MT-4E UHF/VHF switched 1 repeater
Base Bid Althorp Park Ops VHF/UHF Repeater
Modules NPS Supplied Codan MT-4E UHF/VHF switched 2 modules
Base Bid Althorp New LE & Park Ops Duplexers NPS Supplied 2 duplexers
Base Bid Althorp New LE Antennas NPS Supplied UHF/VHF 2 antennas
Base Bid Althorp New Antenna Sch. 80 galvenized mast assembly and hardware Various discuss design with NPS radio shop, mast to be mounted with 2 fixed points on outside of shelter
1 mast
Base Bid Althorp Charge Controllers with mounting panel Various ASC 12/16 Charge controllers and mounting panel 4 controllers
Base Bid Althorp Batteries Renewable energy
ANC 100AH AGM solar batteries 24 each
Base Bid Althorp Battery cables Renewable energy
ANC polar wire 1 set
Base Bid Althorp Solar Panels Renewable energy
ANC 100W 12VDC panels 4 panels
Base Bid Althorp Duckbill easy hook anchors &
Turnbuckles NPS Supplied sets of 8
Base Bid Althorp 50-100' 1/4" aluminum cabling NPS Supplied 1 roll+
Base Bid Althorp Miscellaneous hardware, stainless hinges, bolts, unistrut, wire, etc. Various as needed
Source Component Details Quantity/site
Base Bid Beartrack LE & Park Ops VHF/UHF Repeater
Modules NPS Supplied Codan MT-4E UHF/VHF switched 4 modules
Base Bid Beartrack New LE & Park Ops Duplexers NPS Supplied 2 duplexers
Base Bid Beartrack Charge Controllers with mounting panel Various ASC 12/16 Charge controllers and mounting panel 4 controllers
Base Bid Beartrack Battery cables Renewable energy
ANC polar wire 1 set
Base Bid Beartrack Solar Panels
NPS supplied, to be picked up by contractor in
Gustavus
Renewable energy ANC, 100W 12VDC panels 4 panels
Base Bid Beartrack Duckbill easy hook anchors &
Turnbuckles NPS supplied sets of 8
Base Bid Beartrack 50-100' 1/4" aluminum cabling NPS supplied 1 roll+
Base Bid Beartrack Miscellaneous hardware, stainless
Option 1 Althorp Shelter Shelter Various 1 each
Source Component Details Quantity/site
Option 2 Deception Hill New LE VHF/UHF Repeater NPS supplied Codan MT-4E UHF/VHF switched 1 repeater
Option 2 Deception Hill
Park Ops VHF/UHF Repeater Modules NPS supplied Codan MT-4E UHF/VHF switched 2 modules
Option 2 Deception Hill New LE & Park Ops Duplexers NPS supplied 2 duplexers
Option 2 Deception Hill New LE Antennas NPS supplied UHF & VHF 2 antennas
Option 2 Deception Hill
New Antenna Sch. 80 galvenized mast assembly and hardware Various discuss design with NPS radio shop, mast to be mounted with 2 fixed points on outside of shelter
1 mast
Option 2 Deception Hill
Charge Controllers with mounting panel Various ASC 12/16 Charge controllers and mounting panel 4 controllers
Option 2 Deception Hill Batteries Renewable energy
ANC 100AH AGM solar batteries 24 each
Option 2 Deception Hill Battery cables Renewable energy
ANC polar wire 1 set
Option 2 Deception Hill Solar Panels Renewable energy
ANC 100W 12VDC panels 4 panels
Option 2 Deception Hill
Duckbill easy hook anchors & Turnbuckles NPS supplied sets of 8
Option 2 Deception Hill 50-100' 1/4" aluminum cabling NPS supplied 1 roll+
Option 2 Deception Hill
Miscellaneous hardware, stainless
Source Component Details Quantity/site
Option 3 Idaho New LE Repeater NPS supplied Codan MT-4E UHF/VHF switched 1 repeater
Option 3 Idaho Park Ops VHF/UHF Repeater Modules NPS supplied Codan MT-4E UHF/VHF switched 2 modules
Option 3 Idaho New LE & Park Ops Duplexers NPS supplied 2 duplexers Option 3 Idaho New LE Antennas NPS supplied UHF & VHF 2 antennas
Option 3 Idaho New Antenna Sch. 80 galvenized mast assembly and hardware Various discuss design with NPS radio shop, mast to be mounted with 2 fixed points on outside of shelter
1 mast
Option 3 Idaho Charge Controllers with mounting panel Various ASC 12/16 Charge controllers and mounting panel 4 controllers
Option 3 Idaho Batteries Renewable energy ANC 100AH AGM solar batteries 24 each
Option 3 Idaho Battery cables Renewable energy ANC polar wire 1 set
Option 3 Idaho Solar Panels Renewable energy ANC 100W 12VDC panels 4 panels
Option 3 Idaho Duckbill easy hook anchors & Turnbuckles NPS supplied sets of 8
Option 3 Idaho 50-100' 1/4" aluminum cabling NPS supplied 1 roll+
Option 3 Idaho Miscellaneous hardware, stainless
Option 4 Second Shelter Shelter Various 1 each
Source Component Details Quantity/site
Option 5 Jackie Point New LE and Park Ops VHF/UHF Repeaters NPS supplied Codan MT-4E UHF/VHF switched 2 repeaters
Option 5 Jackie Point New LE & Park Ops Duplexers NPS supplied 2 duplexers
Option 5 Jackie Point Repeater/Duplexer Rack and mounting hardware
TESSCO Bud Industries Inc.
24in X 19in Table Top Rack, or equivalent 1 rack
Option 5 Jackie Point New LE & Park Ops Antennas NPS supplied UHF & VHF 4 antennas
Option 5 Jackie Point New Antenna Sch. 80 galvenized mast assembly and hardware Various discuss design with NPS radio shop, mast to be mounted with 2 fixed points on outside of shelter
1 mast
Option 5 Jackie Point Charge Controllers with mounting panel Various ASC 12/16 Charge controllers and mounting panel 4 controllers
Option 5 Jackie Point Batteries Renewable energy ANC 100AH AGM solar batteries 24 each
Option 5 Jackie Point Battery cables Renewable energy ANC polar wire 1 set
Option 5 Jackie Point Solar Panels Renewable energy ANC 100W 12VDC panels 4 panels
Option 5 Jackie Point Duckbill easy hook anchors & Turnbuckles NPS supplied sets of 8
Option 5 Jackie Point 50-100' 1/4" aluminum cabling NPS supplied 1 roll+
Option 5 Jackie Point Miscellaneous hardware, stainless hinges, bolts, unistrut, wire, etc. Various as needed
Option 5 Jackie Point Shelter Various 1 each Option 5 Jackie Point Shelter Rock Anchors as necessary Various 1 each
Attachment D GLBA Radio Shelter Specifications
GENERAL DESCRIPTION: The shelter shell shall be molded fiberglass reinforced polyester laminated foam cored construction. Alternative type shelters may be acceptable if the contractor can demonstrate the proposed alternative is of sound weather tight construction and is suitable for this application with a minimum 10-year warranty.
MINIMUM DIMENSIONS: 6 feet (L) x 6 feet (W) x sufficient height to accommodate an internally mounted 70 inch vertical antenna with mast. Alternately the shelter internal height shall be a minimum of 6’ high with an external mast on the outside of the shelter to mount an antenna.
GENERAL SHELTER CONSTRUCTION: Walls and roof shall be sandwiched construction with no less than 1/8 inch Fiberglass Reinforced Polyester (FRP) laminate with a minimum of 15 mills polyester gel-coat applied to exterior and ½” 4# density PVC foam bonded to the exterior laminate. 1/16” FRP laminate shall then be applied over entire interior of shelter. Gel-coat shall then be applied over the entire interior of shelter.
The shelter shall have a minimum 6 inch flange at the base to support added ballast for ground anchoring.
FLOOR DETAIL: Floor shall be made of ¾” plywood and shall be completely wrapped with Fiberglass Reinforced Polyester before being bonded to shelter.
INTERIOR SHELVES: Two shelve units shall be constructed in an “L” arrangement. Shelving shall have a ½” upward flange. Each shelf shall be capable of supporting 750lbs.
SHELTER DOOR: Frame for shelter door shall be molded into shelter walls. The door shall be sufficiently large to allow for easy entry and exit by NPS staff. The door shall have heavy duty support hinges, a freezer style latch with holes for a padlock, and contain a neoprene seal.
SHELTER VENTILATION: The shelter shall contain ventilation tubes at the top and bottom to support proper ventilation.
SHELTER SIDEWALL: The shelter sidewall shall be reinforced for solar panel mounting.
ANTENNA MOUNT: The NPS provided antenna & mast shall be installed vertically in the shelter to via cross supports. Alternately the shelter shall be manufactured such that the antenna and mast can be installed on the outside of the shelter with sufficient support to withstand wind loads of 125MPH.
SHELTER ENVIORMENTAL REQUIREMENTS: The shelter shall support wind loads of 125MPH and snow loads of 150lbs PSF.
GROUNDING REQUIREMENTS: The shelter shall have a 5”x7” ground plate mounted inside the shelter.
HARDWARE REQUIREMENTS: Shelter hardware shall consist of non-corrosive material.
SHELTER TRANSPORTATION: The shelter shall have a total of 4 each 1.5“ eyebolts installed on each corner to facilitate transportation by helicopter via slingload.
Attachment E GLBA Replacement Specifications
Note: The pictures that follow are of typical NPS repeater sites and not necessarily the GLBA sites.
Anchors/duckbills (if applicable) Some corners are held down by easy hook anchors (“duckbills”), such Model 88 Earth Anchors, which are power hammered into the ground. Contractor shall inspect the existing duckbills and new duckbills shall be installed if any rust or degradation is present.
Cabling and turnbuckles The anchors are tied to the shelter via ¼” aluminum cabling with 1”X12” turnbuckles. The contractor shall inspect existing cabling and if any rust or degradation is present, replace the cabling. The turnbuckles shall be installed in a manner to support future tightening due to cable stretch and shall be zip tied upon completion to prevent them from listening in inclement weather.
Solar Panels 100W 12vdc panels, such as Go Power brand or equal; there are 4 panels to be replaced. The contractor shall inspect existing solar panel rack and if compatible with the new panels and there is no rust or degradation, the solar panel rack may be reused for mounting the new panels. Alternately the panels may be mounted to the new shelter exterior if Option 1 is awarded with the new shelter oriented for optimal solar exposure.
The solar panels shall be sealed using manufacturer provided sealant on 3 sides: the top and sides (NOT the bottom edge). Old panels shall be removed and disposed of according to Alaska DEC specifications and a certificate of disposal provided to the COR.
Solar batteries Replace current batteries with 31 AGM 12vdc batteries, such as Trojan brand. There are 24 per site, weighing approximately 65 lbs each. Old batteries shall be disposed of according to Alaska DEC specifications and a certificate of disposal provided to the COR.
Battery wiring Connect batteries as shown in the figure below. Batteries are typically strung in 3 rows of 8 batteries.
Typical lengths of battery connectors used between batteries in the same string are 10.5”. Typical lengths of battery connectors used to connect battery strings are 2’. Spare connector cables are recommended to be brought on site.
Charge Controllers (if applicable) Replace charge controllers and mounting panel. Bolt in place and wire as shown in picture below. Bolt 4th charge controller in place, but leave the 4th controller un-wired (NOT as pictured below, which shows all 4 wired) as a spare.
Interconnecting 12vdc wiring Replace and mount all interconnecting wiring between charge controllers, solar panels, batteries, and repeater as shown in photo below. Run cabling in clean runs along shelves to batteries and charge controllers. Wire runs shall be zip tied to walls and shelves of shelter.
Repeater rack All sites except Jackie Point should have a repeater rack equivalent to TESSCO Bud Industries Inc. 24in X 19in Table Top Rack. Ensure rack is securely fixed to shelves with ½” hardware.
Repeater and duplexer At Althorp, Deception Hill and Idaho replace UHF/VHF Park Operations (Ops) repeater modules and duplexer and install a secondary Law Enforcement (LE) repeater and duplexer system.
At Beartrack replace the UHF/VHF Park Ops and LE repeater modules and duplexers.
At Jackie Point install new Park Ops and LE repeaters and duplexers.
If duplexer is too large to be rack mounted, two holes shall be drilled in the lip of the upper shelf and the duplexer secured upright (connectors facing straight up) with large zip tie. Repeaters and duplexers removed from the sites shall be returned to the Radio Shop office in Anchorage.
Once all awarded site installation/replacements are complete, all repeater racks should look like this:
STATEMENT OF WORK