About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Glacier Bay Radio Repeater Replacement project. Amendment 0005, effective 06/03/2025, addresses vendor questions and provides clarification on shelter specifications. Key details include a shelter weight of approximately 1,150 lbs, passive ventilation through weather-resistant louvers, solar panel and battery power as specified in Attachment C of the Statement of Work, and a foundation of treated timbers. The contract requires uniform shelter configurations across all sites, with a period of performance from 07/10/2025 to 07/31/2026. The National Park Service Alaska Regional Office is issuing the solicitation, and the procurement will be awarded on a firm fixed-price basis. The amendment indicates that no further questions will be answered, and the original submission deadline will not be extended.

View the file

Other files for this federal contract opportunity

Other files attached to GLACIER BAY RADIO REPEATER REPLACEMENT, newest first.
File Type Posted
Sol_140P9725Q0047_Amd_0004.pdf PDF
Sol_140P9725Q0047_Amd_0003.pdf PDF
Sol_140P9725Q0047_Amd_0002.pdf PDF
Sol_140P9725Q0047_Amd_0001.pdf PDF
B08_Attach_5__Past_Peformance_Questionnaire_3pg.docx DOCX document
B08_Attach_1__SOW_33pg.pdf PDF
B08_Attach_2__Bid_Schedule.xlsx XLSX spreadsheet
Sol_140P9725Q0047.pdf PDF
B08_Attach_4_Project_Experience_Questionnaire_1_pg.docx DOCX document
B08_Attach_3_WD_2015-5687_v_24_12_23_24-22pg.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P9725Q0047 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PAK

Anchorage AK 99501-2327 240 W. 5th Ave, Room 114 NPS, ARO - Alaska Regional Office

06/03/20250005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/03/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of the amendment 5, is to answer questions of vendors. No more questions will be answered moving forward.

What is the current shelter weight(s)? -

- In the past shelters of similar size as specified in Attachment D of the Statement of

Work weighed approximately 1150 lbs.

Is NPS willing to extend the due date of this requirement by another week?

- Not at this time, it will not be extended passed the 10th. Also, no more questions will be answers going forward.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Janet Milson

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P9725Q0047/0005

Please confirm what shelter and how tall.

- The contractor is meant to build a shelter or purchase one from a third party. The minimum specifications for the shelter including shelter dimensions are provided in Attachment D of the

Statement of Work.

There are also ancillary questions to the above:

1) Ventilation: Louvered? Single HVAC? Dual

HVAC?

- Passive ventilation through weather resistant louvers.

RF I/Os ¿ How many and what size transmission cables do you want in/out of shelter? -

- Waiting to receive this answer. POC is out of the office.

Power input: 120VAC? 48VDC?

- Solar panel and battery power, quantity and size shall be as identified in Attachment C of the Statement of Work.

What is the electrical load of your network so we can size the solar panels, and batteries? This may take a 2nd rack so an 8x8 shelter might best.

- Solar panel and battery power, quantity and size shall be as identified in Attachment C of the Statement of Work.

Please confirm you do not want a concrete pad poured.

- There is no concrete pad. The foundation of new/replacement shelters shall be treated timbers in sufficient number and configuration to support the weight of the shelter, radio equipment, snow loads and two people.

Do you want shelter configurations the same at all sites?

- Yes

Period of Performance: 07/10/2025 to 07/31/2026

FIRM FIXED PRICE

Contracting Officer: Janet Milson

New phone # information 253-322-1378 janet_milson@nps.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .