B08_ATT_6_Lim_on_SubK_Breakout_29Dec2022.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- AFS BUILDING 1541 ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L0622R0033
About this file
This document contains a template for tracking limitations on subcontracting for small business set-aside contracts. It requires the prime contractor to provide details on the total amount proposed, total material costs, self-performed labor costs, and amounts paid to small and large business subcontractors. The percentages are then calculated to ensure at least the minimum self-performance requirement is met and that the limitation on subcontracting to large businesses does not exceed the allowable threshold.
A related federal contract opportunity is also provided. The solicitation is for roof replacement services at the Alaska Fire Service Building 1541 located at Fort Wainwright Army Base in Fairbanks, Alaska. The work includes a full roof assembly replacement along with installation of a fall protection system, new roof drains with thawing components, and EPDM membrane and metal roofing. The requirement is being issued by the Bureau of Land Management's National Office.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_ATT_9_Fort_Wainwright_Installation_Access_Restrictions_-_22_Jun_21_0002.pdf | ||
| B09_HYSAFE_0002.pdf | ||
| B09_Sol_Q_A_140L0622R0033_0002.pdf | ||
| B09_Site_Visit_Sign-in_Sheet_-_1541_reroof_2022_0002.pdf | ||
| Sol_140L0622R0033_Amd_0002.pdf | ||
| Sol_140L0622R0033_Amd_0001.pdf | ||
| B08_ATT_5_WDOL_AK20220001_04_15_2022.pdf | ||
| B08_ATT_2_902101_Final_Manual_-_Specifications_06-29-2021.pdf | ||
| Sol_140L0622R0033.pdf | ||
| B08_ATT_3_902101_Final_11x17_Drawings_08-10-2021.pdf | ||
| B08_ATT_1_BID_SCHEDULE.pdf | ||
| B08_ATT_8_FAR_52_203-19_CERTIFICATION.pdf | ||
| B08_ATT_7_SF1442_HowTo_1Nov2021.pdf | ||
| B08_ATT_4_902101_Final_22x34_Drawings_08-10-2021.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | |
| Type of Set Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .