B08_Att_4_Project_Experience_Questionnaire.docx

DOCX document 40 KB Posted

Attached to
KEMO 258734 - Redesign Kennesaw MT Road to Improve
Solicitation number
140P2025R0018
Issued by

About this file

The document is a Project Experience Questionnaire for Solicitation 140P2025R0018, associated with a Kennesaw Mountain Drive Improvements project for pedestrian safety, being managed by the Department of the Interior National Park Service. The questionnaire requires detailed responses from potential contractors about their previous project experiences, focusing on seven key areas: project work description, specific experience elements, price and schedule changes, problem resolution, successful methods, and additional relevant project information.

The questionnaire template includes sections for capturing comprehensive project details such as project title, location, description, project owner information, and contractor information. Two contractors are referenced in the example: a prime contractor and a subcontractor specializing in plumbing and mechanical work. The document instructs offerors to provide detailed responses that demonstrate their capability and past performance, with the expectation that responses may span multiple pages to adequately address the evaluation criteria outlined in Section L of the solicitation.

View the file

Other files

File Type Posted
Att_11_RFIs_5-27-25_0003.pdf PDF
Sol_140P2025R0018_Amd_0003.pdf PDF
Sol_140P2025R0018_Amd_0002.pdf PDF
B09_Att_10_RFIs_5-20-25_0002.pdf PDF
Sol_140P2025R0018_Amd_0001.pdf PDF
B09_Att_9_RFIs_5-7-25_0001.pdf PDF
B08_Att_1_Specifications.pdf PDF
B08_Att_5_Past_Performance_Questionnaire.docx DOCX document
B08_Att_7_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
Sol_140P2025R0018.pdf PDF
B08_Att_8_WD_GA20250003.pdf PDF
B08_Att_3_Contract_Price_Schedule_.xlsx XLSX spreadsheet
B08_Att_2_Drawings.pdf PDF
B08_Att_6_Banking_Information_Questionnaire.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P2025R0018

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in Solicitation Section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror
Company Name

REFERENCED PROJECT INFORMATION

Project Title
Title
Project Location
City, State
Brief Project Description
Description
Project Owner
Company Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX
Agency
Agency Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX

CONTRACTOR LIST

List contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (e.g., prime and subcontractors), provide information specific to that contractor.

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final
XXX
Prime
Prime
$XXX,XXX
$X,XXX,XXX
XXX
XXX
XXX
Subcontractor
Plumbing & Mechanical
$X,XXX,XXX
$X,XXX,XXX
XXX
XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response