B08_Att_4_Price_Schedule.pdf

PDF 175 KB Posted

Attached to
LAWN AND IRRIGATION SYSTEM REPLACEMENT SAFR Federal contract opportunity
Solicitation number
140P8622R0007
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is a price schedule template for a solicitation to replace an existing lawn and irrigation system at the San Francisco Maritime National Historical Park in California. The solicitation number is 140P8622R0007 issued by the National Park Service Pacific West Region.

The price schedule template includes line items for mobilization, demobilization, installation, removal, materials, equipment, planting establishment maintenance, profit and overhead, and bonding. Offerors are required to provide pricing for all base line items and option line items. Lump sum line items require only a total price, while unit priced line items need both a unit price and extended total. The total proposed price should include the base price plus any optional items.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATED 05/05/2022

Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18

Solicitation Number: 140P8622R0007

PARK - PMIS: SAFR 226144 B

(Project Management Information System)

Developed Area:

Project Title: Replacement of Existing Lawn and Irrigation System San Francisco Maritime National

Historical Park, CA Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title

Quantity

Unit of Measure

Unit Price

Total Price

1a Mobilization 1 LUMP SUM $ $

1b Demobilization 1 LUMP SUM $ $

2a Installation 1 LUMP SUM $ $

2b Removal 1 LUMP SUM $ $

3a Materials 1 LUMP SUM $ $

3b Equipment 1 LUMP SUM $ $

4 Planting Establishment Maintenance 1 LUMP SUM $ $

5 Profit and Overhead 1 LUMP SUM $ $

6 Bonding 1 LUMP SUM $ $

TOTAL BASE PRICE (Contract Line Item Number 1 through 6) --------------------------------------------------------------------------------- $

DATED 05/05/2022

Bid Option 1

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through XX) -------------------------- $