B08_Att_2_Specifications_WHIS_Road_Striping.pdf
PDF 222 KB Posted
- Solicitation number
- 140P8426Q0052
About this file
Project Specifications Summary
This is a Project Specifications document for roadway striping services at Whiskeytown National Recreation Area (WHIS), located approximately 8 miles west of Redding, California on Highway 299. The solicitation number is 140P8426Q0052, and the project PMIS# is 317111. The contractor must provide all labor, materials, equipment, and supervision to apply pavement markings including roadway centerlines, edge lines, stop bars, parking stalls, directional arrows, and ADA parking stalls with hatching across eleven work locations throughout the park.
Work will be performed at multiple locations including the Visitor Center Parking Area, Brandy Creek Beach, South Shore Drive, Brandy Creek Marina Road & RV Parking, Whiskey Creek, Oak Bottom Beach, Marina, Fire Station, and Boat Launch, and Carr Powerhouse. The project scope includes approximately 20,000 linear feet of centerline striping and over 700 parking stalls across all locations. All work must comply with the Manual on Uniform Traffic Control Devices (MUTCD), California Department of Transportation (CDOT) Standard Specifications for Construction (2014), and CDOT Traffic Line Manual. Paint materials must be selected from the CDOT Qualified Products List (QPL). Work is limited to daylight hours (7 am to 5 pm, Monday through Friday, excluding government holidays) and requires coordination to minimize disruption to park operations and public access. The contractor must submit division submittals including a project superintendent letter, construction schedule, schedule of values, accident prevention plan, traffic control plan, product data, samples, and shop drawings prior to a preconstruction meeting. A one-year contractor-issued warranty on workmanship is required following final acceptance.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
Whiskeytown National Recreation Area Perform Roadway Striping Parkwide PMIS#317111
Solicitation #140P8426Q0052
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK (SECTION 01 11 00)
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. General: All work outlined below will be performed under a single contract.
B. Project Location: This project is located at Whiskeytown National Recreation Area (WHIS), approximately 8 miles west of Redding, California on Highway 299. Work will be performed at multiple locations throughout the park as identified in the contract schedules. These locations include:
• Visitor Center Parking Area
• Brandy Creek Beach
• South Shore Drive (Brandy Creek to Dry Creek)
• Brandy Creek Marina Road & Parking
• Brandy Creek RV Parking
• Whiskey Creek
• Oak Bottom Beach
• Oak Bottom Marina
• Oak Bottom Fire Station
• Oak Bottom Boat Launch
• Carr Powerhouse
C. Project Background: WHIS experiences considerable rain and hot weather conditions. This combined with considerable traffic from park visitation results in severe wear on park roads and, in particular road markings installed on the roads for traffic delineation, control, and safety. The specified road surface markings need to be replaced in kind.
D. Project Scope of Work: The Contractor shall provide all labor, materials, equipment, and supervision necessary to perform roadway and parking area striping at Whiskeytown National Recreation Area (WHIS). Work includes the application of pavement markings such as roadway centerlines, edge lines, and stop bars in accordance with applicable federal and state standards.
Striping shall be applied to restore visibility, improve traffic control, and enhance visitor and operational safety throughout the park.
All work shall be performed in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), Caltrans Standard Specifications, and other applicable standards as referenced in this contract. Project work will occur at multiple locations throughout the park. Detailed quantities, layouts, and specific striping requirements for each location will be identified in individual schedule line items associated with this contract.
The Contractor shall coordinate all work to minimize disruption to park operations, visitor use, and traffic flow. Traffic control measures shall be implemented as necessary to safely perform the work.
E. Schedule
The following schedules are provided to facilitate project biding per schedule line item.
SCHEDULE 1 – VISITOR CENTER PARKING AREA
• Parking Stalls: 28 Each
• ADA Parking Stalls w/ Hatching: 2 Each
• Directional Arrows: 4 Each
• Stop Bars: 2 Each
SCHEDULE 2 – BRANDY CREEK BEACH
• Parking Stalls: 100 Each
• ADA Parking Stalls w/ Hatching: 8 Each
• Directional Arrows: 12 Each
• Centerline: 2740 LF
• Stop Bars: 3 Each
SCHEDULE 3 – SOUTH SHORE DRIVE (BRANDY CREEK TO DRY CREEK)
• Centerline: 6,891 LF
SCHEDULE 4 – BRANDY CREEK MARINA ROAD & RV PARKING
4A – Brandy Creek Marina Road & Parking
• Centerline: 2,100 LF
• ADA Parking Stalls w/ Hatching: 4 Each
• Directional Arrows: 8 Each
• Stop Bars: 1 Each
4B – Brandy Creek RV Parking
• Centerline: 2,100 LF
• Directional Arrows: 6 Each
• Stop Bars: 1 Each
SCHEDULE 5 – WHISKEY CREEK
• Parking Stalls: 40 Each
• ADA Parking Stalls w/ Hatching: 6 Each
• Trailer Parking Stalls: 30 Each
• Directional Arrows: 9 Each
• Stop Bars: 1 Each
SCHEDULE 6 – OAK BOTTOM AREA
6A – Oak Bottom Beach
• Parking Stalls: 100 Each
• ADA Parking Stalls w/ Hatching: 4 Each
• Directional Arrows: 6 Each
6B – Oak Bottom Marina
• Centerline: 1944 LF
• Parking Stalls: 60 Each
• Double Parking Stalls: 30 Each
• ADA Parking Stalls w/ Hatching: 1 Each
• Directional Arrows: 8 Each
6C – Oak Bottom Fire Station
• Parking Stalls: 6 Each
• Directional Arrows: 3 Each
• Stop Bars: 2 Each
6D – Oak Bottom Boat Launch
• Centerline: 2,109 LF
• Parking Stalls: 40 Each
• Double Trailer Parking Stalls: 80 Each
• ADA Parking Stalls w/ Hatching: 6 Each
• Directional Arrows: 8 Each
• Stop Bars: 2 Each
SCHEDULE 7 – CARR POWERHOUSE
• Centerline: 3,500 LF
• Parking Stalls: 20 Each
• Directional Arrows: 4 Each
• Stop Bars: 2 Each
F. Lineal footage indicated is estimated and should be verified by contractor prior to providing a quote for this project. Please provide each Schedule as a separate line item in any quote for this project.
G. All activities and work shall be performed in accordance with California Department of
Transportation (CDOT) Standard Specification for Construction (2014), specifically Section
00850.00 Common Provisions for Pavement Markings, CDOT Traffic Line Manual, and the Manual of Uniform Traffic Control Devices (MUTCD).
H. All paint materials used on this project shall be from CDOT Qualified Products List (QPL).
1.2 GOVERNMENT-FURNISHED ITEMS
A. No government furnished items will be provided with this project.
1.3 PUBLIC / STAFF USE OF THE SITE
A. General: The project site will be open to the public and/or staff during construction. The contractor shall always conduct operations to ensure the least inconvenience to the public and staff. Temporary closures may be permitted upon specific written approval by the Contracting
Officer.
1.4 CONTRACTOR USE OF SITE
A. General: Limit use of the site during the construction period to the project area limits as outlined on the attached site map.
B. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law Enforcement Rangers will intervene if they perceive any unsafe or unlawful activity.
C. Park Entry: Vehicles associated with the Contractor shall be waived the entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicle(s). Please note that the entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
1. Provide the Contracting Officer with a list of all contract personnel and their associated vehicles entering the park daily.
2. Provide the Contracting Officer with a list of anticipated deliveries for each week.
D. Site Access: The contractor shall access the project site as outlined on the attached site map. Do not drive vehicles off road or access non-project areas without permission from the contracting officer or their representative.
E. Working Hours: Regular work hours shall be limited to daylight hours from 7 am until 5 pm
Monday through Friday, excluding government holidays. Work outside regular hours requires approval from the Contracting Officer.
F. Staging and Storage: Confine the storage of equipment and materials to the staging / lay-down / storage areas as established at the preconstruction meeting.
G. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or Park Dispatch at the first available opportunity at 530-242-3431.
H. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.
PART 2 – WORK RESTRICTIONS (SECTION 01 11 40)
2.1 WORK RESTRICTIONS
A. General: The Contractor must comply with the following work restrictions:
B. Vehicles / Heavy Equipment:
1. Rules of the Road: All vehicles and heavy equipment will comply with posted traffic regulations, including speed limits and double-yellow center lane markings. Vehicles and heavy equipment shall take every safe opportunity to use paved roadside pullouts to allow faster moving traffic to pass. Failure to comply with traffic regulations will result in a citation being issued to the driver.
2. Vehicle Parking: The contractor shall park vehicles and heavy equipment in designated areas as established at the preconstruction meeting. Vehicles are not permitted within long-term or overnight parking along park roads or in associated overlooks / pullouts.
3. Driveways and Entrances: The contractor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles always.
4. Vehicle Exhaust: All vehicles will be properly maintained to ensure that the exhaust produced is within legal limits. Effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.
5. Spills: The Contractor shall be responsible for any cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. Contractor must immediately notify the Contracting Officer of spills.
6. DOT Compliance: All vehicles are to be compliant with all DOT requirements including but not limited to driver with appropriate license class, medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, mounted fire extinguisher, and valid DOT safety sticker.
7. Slow Vehicles: The Contractor is to notify the Contracting Officer of slow vehicles that may cause traffic delays or extended traffic lines.
8. Oversized Vehicles: Oversized vehicles are defined as vehicles where the width of the vehicle or load exceeds one lane (i.e., beyond the center line of the paved road). Oversized vehicles must not exceed the clearances along the park road corridor. Oversized vehicles will require an escort and drivers must avoid driving on the edges of the park road. The Contractor is to notify the Contracting Officer of oversized vehicles, scheduled dates, and estimated arrival times at the park entrance; and the identity of who is escorting the vehicle (e.g., police, contractor, etc.).
9. Road & Weight Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on the park road (36 CFR § 4.11). No loads heavier than the current load rating for park roads and bridges will be permitted.
C. Resource Protection:
1. General: The Park is committed to protecting natural and cultural resources found within the park and adjacent lands. The Contractor must comply with the following rules and conditions:
2. Preservation of Natural Features: Prevent damage to natural surroundings. Do not attach ropes, wires, guy lines, cables, or chains to trees or vegetation. Restore damaged areas and replace damaged trees, vegetation, and grass at no expense to the government.
3. Invasive Species: The introduction of non-native invasive species can threaten rare and endangered species or can create new populations of non-native species not traditionally found in the park. The contractor is required to inform personnel, subcontractors, and vendors to thoroughly clean all vehicles (especially the tires), equipment, tools, supplies, and materials prior to packing / loading. The park requires and will perform inspections to prevent transport of non-native species PRIOR to arriving at the park entrance. Contact the
Equipment Inspector Dave Larabee at 530-604-5710 at least (3) three days in advance of park entry to arrange for inspection(s).
4. Endangered Species: Endangered species are protected by Federal law. Obey all park regulations. Drivers must obey all traffic laws and watch for animals on or alongside road or at the jobsite. Contact Park Dispatch at 530-242-3431 immediately if animal is hit or injured or will not move off the road.
The following measures are required to minimize disturbance to endangered wildlife:
a. Work shall be conducted to ensure the work area is cleaned up at the end of each work shift so that loose tools, debris, and materials are not left out in a manner that could present a hazard to a listed species.
b. Noise and vibrations of equipment shall be kept to a minimum when working in the vicinity of a listed species.
c. Hazmat spill prevention protocols shall be employed when using gas-powered equipment.
d. Ensure loose nails and screws do not make it to the ground when working on exterior surfaces as these can be detrimental to listed species.
5. Archaeological Resources: Archaeological resources are physical evidence of past human activity, including evidence of the effects of that activity on the environment.
Archaeological resources are found above and below ground and underwater. The
Contractor’s Project Superintendent, or designee, will observe all ground-disturbing activities in archaeological sensitive areas. If the Contractor discovers resources, the Contractor shall stop work or relocate to a non-sensitive area and contact the Contracting Officer immediately. The Park may also have an Archaeological Monitor at the jobsite who is authorized to stop work upon discovery of archaeological resources. Archaeological resources typically found in the park or at the project site will be discussed further at the preconstruction meeting.
6. Soundscape / Noise: The contractor shall minimize noise levels at the project site to protect the soundscape of the park. Perform noise-producing work in less sensitive hours of the day or week or as directed by the contracting officer.
PART 3 – PROJECT MANAGEMENT (SECTION 01 31 00)
3.1 SUBMITTALS
A. Division 01 Submittal Documents: The following documents shall be submitted a minimum of one week prior to the Preconstruction Meeting. If all these documents have not been received one week prior to the scheduled Preconstruction Meeting date, the meeting will be cancelled and the Notice to Proceed (NTP) will not be issued. Work shall not commence until written Notice to Proceed has been issued.
1. Letter designating the Project Superintendent.
2. Construction Schedule - Submit a baseline schedule with start date, end date, major work activities and durations, estimated pre-final inspection date, and other major milestones.
Provide updates to baseline schedule as needed / requested during construction.
3. Schedule of Values (SOV) – Submit a schedule of values with a breakdown of component work activities for which progress payments will be requested. The total costs for the component work activities shall equal the total contract price.
4. Accident Prevention Plan (APP) – Submit an accident prevention plan with the name of the supervisor responsible for executing the plan, first aid procedures, and planning for potential emergency situations.
5. Traffic Control Plan (TCP) – Submit a site-specific Traffic Control Plan in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). The plan shall include traffic control devices, signage, flagging operations, lane closures (if applicable), and methods to safely maintain vehicle and pedestrian traffic during work operations.
6. A list of Subcontractors for this project.
7. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
8. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
B. Division 02-49 Submittal Documents: The following documents shall be submitted to the Contracting Officer prior to construction start. If these documents have not been received and approved by the NPS prior to construction, the construction start date may be delayed.
1. Product Data – Submit product cut sheets / material data on all products to be used for approval. Indicate the size, model, or type of each recommended product.
2. Samples – When requested, submit a physical sample of a product or an array of color choices for approval.
3. Shop Drawings - Submit shop drawings that embody all major elements of the work.
a. Drawings shall be developed in AutoCAD or similar drafting software.
b. Drawings shall include details, dimensions, notational information and other data to ensure the contractor has a complete understanding of the work.
c. Drawings shall be submitted to the Contracting Officer in PDF format. Allow 2 weeks for the drawings to be reviewed by NPS staff. The Contractor shall incorporate review comments into the shop drawings and resubmit for final approval.
3.2 PRECONSTRUCTION MEETING
A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting either on site or via teleconference. The meeting agenda will include the following topics:
1. NPS Roles & Responsibilities
2. Key Contractor Personnel
3. Coordination with Subcontractors
4. Correspondence & Submittal Procedures
5. Submittals
a. Status of Division 01 Submittals
b. Schedule & SOV
c. Safety & Accident Prevention Plan
d. Status of Division 02-49 Submittals
6. Park Rules & Regulations
7. Work Hours and Weekend, Holiday, and Night Work
8. Project Information
a. Park Access & Vehicle Reporting
b. Jobsite Access & Parking
c. Staging, Storage, and Lay Down Area(s)
d. Temporary Facilities & Controls
e. Jobsite Restrictions
f. Resource Protection
g. Weather, Climate, Environmental Conditions
h. Reference Documents
i. Other Contracts / Ongoing Work
9. Labor Standards Provisions
10. Labor Interviews
11. Payroll Reports
12. Payments to the Contractor
13. Change Orders / Modifications
14. Progress Meetings
15. QC Daily Reports
16. Inspections
17. Acceptance and Rejection of Work
18. Closeout Procedures & Submittals
19. Contract Period of Performance
20. Notice to Proceed
3.3 REQUESTS FOR INFORMATION (RFIs)
A. General: On discovery of the need for additional information or interpretation of the Contract Documents, the Contractor shall prepare and submit a RFI utilizing the form attached.
1. Contracting Officer will only respond to RFIs submitted by the Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. RFI Form: Include a detailed, legible description of the subject or item needing information or interpretation on the RFI Form with:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, if applicable.
6. Photographs or sketches if applicable.
7. Contractor's suggested resolution. If the Contractor's suggested resolution impacts the contract time or the contract sum, Contractor shall state impact in the RFI.
C. Response to the RFI: The Contracting Officer will review each RFI, determine the action required, and respond accordingly.
PART 4 – SUBMITTAL PROCEDURES (SECTION 01 33 23)
4.1 SUBMITTAL PROCEDURES
A. CM-16 Transmittal Form: All submittals shall be transmitted using National Park Service CM-16 form attached to the end of this specification section. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Complete all applicable fields, sign the form, and attach all supporting documentation.
PART 5 – SAFETY REQUIREMENTS (SECTION 01 35 23)
1.1 SAFETY REQUIREMENTS
1. First Aid Equipment: Provide adequate first aid equipment for all contract employees and the hazards associated with the types of ongoing construction work at the site.
2. First Aid Training: Provide adequate training to all Contractor personnel to ensure prompt and efficient application of first aid.
3. Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees.
4. Hazardous Materials: Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
Store hazardous materials in accordance with manufacturers and OSHA recommendations.
Maintain MSDS onsite for each chemical used on the jobsite. Immediately report all spills of hazardous materials to the contracting officer.
5. Safety Meetings: At a minimum, conduct weekly "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the week.
6. Emergency Contacts: Post telephone numbers and reporting instructions for ambulance, hospital, fire department, police, and park dispatch in conspicuous locations at the site.
7. Emergency Reporting: In the event of an emergency medical incident, the Contractor shall Dial 911 as needed. The Contractor shall also contact Park Dispatch at 530-242-3431 for any medical emergency, traffic accident, or personal injury occurring within the park. Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles need to enter the Park and so that any available Emergency Medical Services personnel in the park might respond until such time as the ambulance arrives.
PART 6 – QUALITY REQUIREMENTS (SECTION 01 40 00)
6.1 QUALITY REQUIREMENTS
A. General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance are in compliance with applicable specifications, drawings, building codes and standards.
B. Quality Control (QC) Daily Reports: Submit quality control daily reports documenting the progress and quality of the work. The Contractor’s Quality Control Supervisor shall utilize the forms attached at the end of this Section. The submission frequency of the QC Daily Report to the contracting officer will be determined at the preconstruction meeting.
PART 7 – TEMPORARY FACILITIES & CONTROLS (SECTION 01 50 00)
7.1 TEMPORARY FACILITIES & CONTROLS
A. General: The contractor will be allowed to set up temporary facilities and controls as outlined.
All temporary facilities and controls shall be removed from the site before final acceptance of the work.
B. Temporary Utilities: The following utilities / services are available for use at the project site:
1. Electrical Power Service: Electrical power is not available at the site. The contractor shall use battery powered tools or furnish portable generators with proper fuel containment and emergency spill kits.
2. Water Service: Non-potable water service is not available at the site. The contractor shall furnish all non-potable water required for construction and cleanup.
3. Sanitary Facilities: Restrooms are available at or near the project site for use on the contract without charge.
4. Telephone Cellular Service: The project site may or may not have cellular service.
C. Temporary Office: The construction of temporary office buildings or installation of trailers will not be allowed in the park. If the contractor requires office space, the park will attempt to accommodate the contractor with an existing space for administrative work.
D. Temporary Enclosures: For uncontrolled sites, the contractor shall construct an enclosure fence, barrier, or partition to prevent people and animals from entering the project site except by gates / doors.
E. Temporary Traffic Controls: The contractor shall erect and maintain barricades, danger signals, and warning signs in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition. The contractor shall provide adequate traffic control, including flaggers on either side of any work performed in the road. Any workers on or near the road must wear highly visible, bright clothing.
PART 8 – EXECUTION (SECTION 01 73 40)
8.1 EXECUTION
A. Examination: Examine the project area and site facilities and verify compatibility between existing conditions and the scope of work.
B. Preparation: Take field measurements or conduct surveys to verify dimensions before fabrication or installation.
C. Installation: Install all systems or components according to the specifications, manufacturer’s recommendations, permit conditions (where applicable), and local, State, and Federal codes, standards, and regulations.
D. Correction of the Work: Upon discovery of defects or damage of new work or to existing facilities damaged by new work, repair or replace damaged systems or components and restore substrates and finishes.
E. Progress Cleaning: Clean the project site and work area daily. Keep site free of waste and debris in proper containment. Properly dispose of all waste and debris offsite.
F. Final Cleaning & Waste Disposal: At the completion of the work, clean all surfaces and remove all waste materials, trash, tools, equipment, machinery, and surplus items from the project site and legally dispose of all waste items.
PART 9 – CLOSEOUT PROCEDURES (SECTION 01 77 00)
9.1 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When the project, or a designated portion of the project, is substantially complete, the Contractor shall request a final inspection in writing. Upon receipt of the written request that the project is substantially complete, the Contracting Officer will proceed with a final inspection within ten (10) days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If the work is determined to be substantially complete at the final inspection, the Contracting Officer will prepare a Letter of Substantial Completion with a Punch List of deficiencies to be corrected before final acceptance. The Contractor shall complete the work described in the Punch List within thirty (30) calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
C. If the work is determined to be not substantially complete, the Contracting Officer will notify the Contractor in writing. The Contractor may request a new final inspection. All re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.
D. After all deficiencies have been corrected and the project is complete, a Letter of Final Acceptance will be issued by the Contracting Officer.
9.2 CLOSEOUT SUBMITTALS
A. Operation & Maintenance (O&M) Manual: Submit three (3) hard copies (in D-ring binders) and three (3) compact disks (CDs) with all operation and maintenance information including but not limited to a preventative maintenance schedule, operating instructions, product / material cut sheets, system diagrams, as-built drawings, progress photos, product warranties, and a one (1) year Contractor-issued warranty on all workmanship starting from the date of final acceptance.
9.3 DEMONSTRATION & TRAINING
A. Demonstration & Training: Provide onsite demonstration and training to NPS operators and staff on the proper, safe operation of all new systems and components.
File details come from the government source that posted it. Updated .