B08_Att_2_Price_Schedule.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- REPAIR/REPLACE ROOFING ALCATRAZ GOGA NRA
- Solicitation number
- 140P8622R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8622R0012_Amd_0005.pdf | ||
| B12_Questions_and_Answers_07292022_0005.docx | DOCX document | |
| Sol_140P8622R0012_Amd_0004.pdf | ||
| B11_Site_Visit_Log_0004.pdf | ||
| Sol_140P8622R0012_Amd_0003.pdf | ||
| B12_Questions_and_Answers_0003.docx | DOCX document | |
| Sol_140P8622R0012_Amd_0002.pdf | ||
| Sol_140P8622R0012_Amd_0001.pdf | ||
| B08_SF1442_Section_A-M_06242022.docx | DOCX document | |
| B08_Att_11_Relevant_Experience_Template.docx | DOCX document | |
| B08_Att_5_Construction_Invoice_NPS_302_2_Invoice_Payment_Request.docx | DOCX document | |
| Sol_140P8622R0012.pdf | ||
| B08_Att_8_SF25_Performance_Bond.pdf | ||
| B08_Att_4_PPQ.docx | DOCX document | |
| B08_Att_7_SF24-16d_Bid_Bond.pdf | ||
| B08_Att_6_Release_of_Claims.pdf | ||
| B03_Att_3_General_Decision_CA_20220018_Rev7_06032022.pdf | ||
| B08_Att_9_SF25A_Payment_Bond.pdf | ||
| B08_Att_10_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Att_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rollup
| Project: Repair/Replace Roofing at Various Structures, Alcatraz | Bid By: | ||
| Park: GOGA | Date: | ||
| PMIS: 306945 | |||
| Reviewed By: | |||
| Date: | |||
| 5/24/22 | |||
| PRICE SCHEDULE | |||
| Line Item # | Description | Total | |
| 001 | Bldg 64 - Roof Repair/replace | $0.00 | |
| 002 | Electric Shop Roof Repair/replace | $0.00 | |
| 003 | Metal Detector Roof Repair/replace | $0.00 | |
| 004 | Dock Restroom Roof Repair/Replace | $0.00 |
Total Direct Construction Costs $0.00
| General Requirements at XX% | $0.00 |
| Overhead at XX% | $0.00 |
| Profit at XX% | $0.00 |
| Bonds at X% | $0.00 |
| Total Project Cost | $0.00 |
NOTE:
Bldg 64
| Project: Building 64 Roof Repairs | Bid By: | ||||
| Park: GOGA | Date: | ||||
| PMIS: 306945 | |||||
| Reviewed By: | |||||
| Date: | |||||
| 5/24/22 | |||||
| PRICE SCHEDULE | |||||
| Line Item # | Description | Quantity | Unit | Cost/Unit | Total |
| 1 | Roof - Seal pinholes and install new fasteners at roof panels, ridge, valley, hip roof and chimney flashing sections. | 1 | LS | $0.00 | $0.00 |
| 2 | Roof - Replace missing ridge cap sections. | 1 | LS | $0.00 | $0.00 |
TOTAL Direct Construction Costs $0.00
Notes:
Electric Shop
| Project: Electric Shop Roof Replacement | Bid By: | ||||
| Park: GOGA | Date: | ||||
| PMIS: 306945 | |||||
| Reviewed By: | |||||
| Date: | |||||
| 5/24/22 | |||||
| PRICE SCHEDULE | |||||
| Line Item # | Description | Quantity | Unit | Cost/Unit | Total |
| 1 | Demo/dispose transite roof, shingles and skip sheathing | 1 | LS | $0.00 | $0.00 |
| 2 | Demo IH monitoring/disposal services | 1 | LS | $0.00 | $0.00 |
| 3 | Install seismic blocking | 1 | LS | $0.00 | $0.00 |
| 4 | Borate treat all new wood installations and existing exposed rafter and roof plate assemblies | 1 | LS | $0.00 | $0.00 |
| 5 | Install new plywood sheathing panels | 1 | LS | $0.00 | $0.00 |
| 6 | Provide and install moisture barrier, flashings and corrugated fiber cement roof panel system | 1 | LS | $0.00 | $0.00 |
TOTAL Direct Construction Costs $0
Notes:
Metal Detector
| Project: Metal Detector Building Roof Replacement | Bid By: | ||||
| Park: GOGA | Date: | ||||
| PMIS:306945 | |||||
| Reviewed By: | |||||
| Date: | |||||
| 5/24/22 | |||||
| PRICE SCHEDULE | |||||
| Line Item # | Description | Quantity | Unit | Cost/Unit | Total |
| 1 | Demo and dispose of old rolled roofing | 1 | LS | $0.00 | $0 |
| 2 | Replace existing rolled roofing with similar (“Flintastic”), using torch down process or cold mastic adhesive | 1 | LS | $0.00 | $0 |
| 3 | Replace galvanized drip edge and paint to match | 1 | LS | $0.00 | $0 |
TOTAL Direct Construction Costs $0
Notes:
Dock Restroom
| Project: Dock Restroom Roof Repairs | Bid By: | ||||
| Park: GOGA | Date: | ||||
| PMIS: 306945 | |||||
| Reviewed By: | |||||
| Date: | |||||
| 5/24/22 | |||||
| PRICE SCHEDULE | |||||
| Line Item # | Description | Quantity | Unit | Cost/Unit | Total |
| 1 | Clean out of all debris at all confined rakes | 1 | LS | $0.00 | $0.00 |
| 2 | Remove existing tile around an existing penetration, remove underlayment and replace dry rot. Install new underlayment and replace the existing concrete tile. | 1 | LS | $0.00 | $0.00 |
| 3 | Clean debris on four (4) existing skylights | 1 | LS | $0.00 | $0.00 |
| 4 | Perform a two (2) hour water test via light pressure washing to the entire roof surface to ensure roof top is water tight | 1 | LS | $0.00 | $0.00 |
| 5 | Boom Lift rental - 1 month, including barged mob/demob | 1 | LS | $0.00 | $0.00 |
| $0.00 | |||||
| TOTAL Direct Construction Costs | $0.00 |
Notes:
File details come from the government source that posted it. Updated .