B08_ATT_1_Hydrocarbon_Measurement_SOW_Final.pdf

PDF 297 KB Posted

Attached to
Hydrocarbon Measurement Services for Orphaned Well Federal contract opportunity
Solicitation number
140L0622Q0045
Issued by
Department of the Interior Bureau of Land Management National Office

View the file

Other files for this federal contract opportunity

Other files attached to Hydrocarbon Measurement Services for Orphaned Well, newest first.
File Type Posted
B09_ATT_5_BLMUT_FY2022_Orphan_Wells_FLIR_Gas_Leak_Detection_0001.pptx PPTX presentation
B09_Sol_Q_A_140L0622Q0045_0001.pdf PDF
B09_Combined_Synopsis_Solicitation_Methane_RFQ_Am_0001_0001.pdf PDF
B09_ATT_1_Hydrocarbon_Measurement_SOW_Am_0001_0001.pdf PDF
Sol_140L0622Q0045_Amd_0001.pdf PDF
Sol_140L0622Q0045.pdf PDF
B08_ATT_4_UT_ORPHAN_WELL_LOCATIONS.pdf PDF
B08_ATT_2_Federal_Orphaned_Wells_Methane_Measurement_Guidelines.pdf PDF
B08_ATT_3_Methane_Measurement_Data_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

| 1

United States Department of the Interior Bureau of Land Management

Hydrocarbon Measurement Statement of Work

Location: Canyon Country District, Moab Field Office

Address: U.S. Department of the Interior

Bureau of Land Management

Utah State Office

440 West 200 South, Suite 500

Salt Lake City, Utah 84101

June 2022

| 2

I . SUMMARY OF WORK:

Eleven wells in Grand County, previously operated by Northstar Gas Company Inc, have been placed into an orphan status with no iden�fiable responsible party. The BLM will be contrac�ng for the plugging and abandonment (P&A) of these orphaned wells under a separate contract, which will be funded by appropria�ons from the Infrastructure Investment and Jobs Act (IIJA)/Bipar�san Infrastructure Law (BIL).

All wells funded under the BIL are required to test for hydrocarbon emissions before and a�er plugging and abandonment ac�vi�es.

The purpose of this Statement of Work is to iden�fy possible hydrocarbon leaks and obtain emissions rates for those leaks on the eight wells below and provide quantitative estimates of those leaks that meet Federal Program data quality objectives and can be aggregated to meet reporting requirements of the BIL Title VI, Section 40601(f)(2)(B) for methane emissions reduced by plugging and support the calculation of nation‐wide inventory measures and emissions factors Section 40601(f)(2)(A).

Table 1 – Well Informa�on:

Lease

Number US Well Number

Well Name Status State County Spud Date

Completion Date

UTU13031 4301930704 Calvinco 31‐12 GSI UT GRAND 11/12/1980 1/15/1981

UTU41371 4301930522 Federal 4‐12 GSI UT GRAND 8/26/1980 10/7/1980

UTU10152 4301930771 Brown USA 35‐3 GSI UT GRAND 3/18/1981 5/1/1981

UTU31468 4301930520 Wilson 33‐15 GSI UT GRAND 8/5/1980 9/26/1980

UTU31468 4301930703 Wilson 33‐2 GSI UT GRAND 9/23/1980 5/6/1981

UTU38838A 4301930521 Federal 3‐8 GSI UT GRAND 8/5/1979 9/15/1979

UTU41372 4301930544 Federal 5‐13 GSI UT GRAND 11/5/1981 5/24/1982

UTU10152 4301930538 Federal 35‐10 GSI UT GRAND 10/27/1979 12/11/1979

Contractor shall perform work in accordance with the atached Federal Orphaned Wells Methane Measurement Guidelines (Atachment 1). The Contractor shall develop an appropriate approach and method of execu�on, including proposed equipment, quan�fica�on procedures, and quality control plans for measuring hydrocarbon emissions rates before plugging and abandonment ac�vi�es. This approach must be submited to the Government and approved prior to deploying the field campaign.

Hydrogen Sulfide Gas (H2S) is not known to be present in these wells. Should H2S be detected in concentra�ons over 100 ppm in the gas stream, opera�ons will be shut down un�l a plan to safely proceed is developed and implemented.

I I . BACKGROUND:

These eight wells were drilled and completed by Belnorth Petroleum Corp between 1960 and 1981. The wells changed hands mul�ple �mes through the 1980s and 1990s before being taken over by Northstar Gas Company Inc in 1994. The wells con�nued producing un�l March 2013 when the first well was shut

in. All eleven wells were shut in by January 2016. Northstar Gas Company has been unreachable for several years and the wells have been classified as orphaned. The BLM has both surface and mineral

| 3 responsibili�es for all involved wells. Because the involved lessees/operators failed to properly plug and abandon the wells, the BLM is now responsible for proper plugging of the wells. In order to comply with the BIL, Hydrocarbon leaks must be iden�fied and quan�fied prior to and post plugging and abandonment of the wells.

1. WELL LOCATION:

The orphaned wells, shown in Figure 1 below, are located in Grand County, Utah approximately 60 miles west of Grand Junc�on, Colorado. The orphaned wells can be found at the la�tudes and longitudes listed in Table 2 below. A loca�on map and direc�ons to each site are atached.

Table 2 - Loca�on of Wells:

US Well Number Well Name Status State County TWP RGE SEC QTR LATITUDE LONGITUDE

4301930704 Calvinco 31‐12 GSI UT GRAND 16S 25E 31 NWSW 39.370388 ‐109.206780

4301930522 Federal 4‐12 GSI UT GRAND 17S 24E 4 NWSW 39.354935 ‐109.270840

4301930771 Brown USA 35‐

3 GSI UT GRAND 16S 24E 35 NENW 39.377224 ‐109.237150

4301930520 Wilson 33‐15 GSI UT GRAND 16S 24E 33 SWSE 39.368176 ‐109.272484

4301930703 Wilson 33‐2 GSI UT GRAND 16S 24E 33 NWNE 39.377663 ‐109.269300

4301930521 Federal 3‐8 GSI UT GRAND 17S 24E 3 SENE 39.360980 ‐109.242165

4301930544 Federal 5‐13 GSI UT GRAND 17S 24E 5 SWSW 39.352642 ‐109.290665

4301930538 Federal 35‐10 GSI UT GRAND 16S 24E 35 NWSE 39.371487 ‐109.235405

I I I . HYDROCARBON MEASUREMENT PROTOCOL:

The contractor shall iden�fy and test for mul�ple types of hydrocarbon leaks from orphaned wells, as appropriate for each wellsite. The contractor shall verify no hydrocarbon leaks exist at:

1. The open wellbore;

2. The open wellbore and soils around the wellbore due to subsurface fractures in the wellbore;

3. Valves, connections, cracks at the well head or other infrastructure associated with the well;

4. The soil instead of the well head; or

5. Any existing facilities at or on the wellsite.

DETECTION EQUIPMENT AND PROCEDURES

1. The BLM has completed the ‘non detect/detect’ portion for the identified wells (Attachment X).

All wells requiring quantitative hydrocarbon rate measurements are included in Table 1.

2. Sensitive binary instrumentation should have a detection limit of 1 gram/hour or lower. Some high sensitivity binary instrumentation includes:

a. Gas Rover

b. Sniffer

| 4

c. Trace Gas Analyzer (TGA)

d. Ring Down Laser Absorption Spectrometer (RDLAS)

FIELD DOCUMENTATION REQUIREMENTS

Using the provided Hydrocarbon Measurement Datasheet (Attachment 2), record the following information for each well:

• Date and time of the measurement(s).

• Well name and number and API number.

• Location, including latitude and longitude (decimal degrees, 5‐7 decimal places) of the wellhead.

• The well class (not detected, detected, or detected + may be high).

• The type of measurement equipment and methodology utilized.

• Weather conditions, including wind speed and wind direction and temperature. Measurements should not be made under high wind, extreme temperature conditions or during precipitation events.

If the well has been classified as ‘detected’ then also record:

• The calculated emissions rate (grams per hour) over a 60‐minute period of hydrocarbons observed.

• The place(s) where the well was leaking.

• Whether a gas smell was detected.

• Whether gas venting was audible.

• Whether gas venting was observed or felt as movement of the air or movement of nearby vegetation.

• Whether gas venting could be observed on nearby surface waters, e.g., as bubbling.

• Whether ambient hydrocarbon concentrations were recorded > 1000 ppm anywhere on the well pad.

The contractor shall also provide a field report folder with:

• Photos;

• Narrative description of the measurement methods used and supporting information;

• Documentation of each method’s performance demonstrated with equipment used in the field;

• Documentation of the most recent calibrations and maintenance of equipment; and

• Documentation of training and experience of measurement specialists.

IV. DELIVERABLES:

The total Period of Performance of this task order shall be 120 calendar days from contract award. The contractor shall provide the following deliverables:

1. Project Schedule – After award, the Government will provide the contractor with the expected schedule for the associated plugging and abandonment contract. The contractor shall develop a

| 5 project schedule detailing the sequence and timing of onsite measurement activities for Government approval.

Timeframe: Within 15 calendar days of contract award

2. Methodology and Approach –The Contractor shall develop an appropriate approach and method of execution, including proposed equipment and quantification procedures, for measuring hydrocarbon emissions rates before plugging and abandonment activities.

Timeframe: Within 30 calendar days of contract award

3. Pre‐Plugging Hydrocarbon Measurement Datasheet – The contractor shall complete the provided datasheet for all wells after the completion of measurement activities.

Timeframe: Within 45 calendar days after completion of pre‐plugging field campaign

4. Field Report Folder – The contractor shall submit a final field report folder for each wellsite.

Timeframe: Within 60 calendar days after completion of post‐plugging field campaign

V. ATTACHMENT LISTING:

1. Attachment 1 – Federal Orphaned Wells Methane Measurement Guidelines, Dated April 2022, 28 pages including references required for contractor review

2. Attachment 2 – Hydrocarbon Measurement Datasheet, Dated June 2022, 1 page

3. Attachment 3 – Well Locations and Directions, Dated May 2022, 24 pages

| 6

APPENDIX A: BLM OFFICE CONTACTS

Contrac�ng Officers Representa�ve Angus, Ryan

(435) 781‐4486 rangus@blm.gov

Contrac�ng Officer Johnson, Paula

(720) 417‐3005 pjohnson@blm.gov mailto:rangus@blm.gov mailto:pjohnson@blm.gov

I. SUMMARY of Work:
Table 1 – Well Information:
II. BACKGROUND:
1. Well Location:
Table 2 - Location of Wells:
III. Hydrocarbon Measurement protocol:
IV. DELIVERABLES:
V. Attachment listing:
Appendix A: BLM Office Contacts