This document is a Statement of Work (SOW) for a federal contract opportunity to replace the outdoor microwave infrastructure for the Golden Gate National Recreation Area (GGNRA). The GGNRA has a requirement to replace the outdoor infrastructure on a shared AVIAT based microwave radio data link connecting multiple Motorola radio voice sites.
The SOW outlines the requirements to propose a compatible solution to replace existing microwave outdoor infrastructure including antennas, waveguides, and all associated support hardware as well as select indoor infrastructure. Key details include design considerations, equipment to be replaced, pressurization equipment, DC power equipment, installation and integration services, testing requirements, and site access and security provisions. The contract opportunity is solicitation number 140P8624Q0063 issued by the Department of the Interior National Park Service Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8624Q0063_Amd_0003.pdf | ||
| Sol_140P8624Q0063_Amd_0002.pdf | ||
| 140P8624Q0063_Questions_and_Answers_8_28_24_0002.pdf | ||
| Sol_140P8624Q0063_Amd_0001.pdf | ||
| B08_Att_2_Price_Schedule_Microwave_Infrastructure.xlsx | XLSX spreadsheet | |
| B03_Att_4_DOL_Wage_Rate_Determination.pdf | ||
| Sol_140P8624Q0063.pdf | ||
| B08_Att_3_Exp_and_PP_Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOLDEN GATE NATIONAL RECREATION AREA
MICROWAVE RADIO OUTDOOR INFRASTRUCTURE
PROCUREMENT REQUIREMENTS
Prepared : 11/27/23 PSW
BACKGROUND
Golden Gate National Recreation Area (GGNRA or Customer) has a requirement to replace its portion of outdoor infrastructure on a shared AVIAT based microwave radio data link connecting multiple Motorola radio voice sites and supporting thousands of users including public safety first responders.
This microwave network is primarily owned, managed, and serviced by Lawrence Livermore National Security (LLNS) for a shared Motorola Trunked Radio Network. LLNS is also the frequency licensee for the existing microwave radios.
As of July 2021 the microwave radio network consists of AVIAT IRU600 / INUe Eclipse node radios and support infrastructure. The original outdoor infrastructure installed in 2011 to support analog AVIAT(Harris) Constellation radios was not replaced during this project. This acquisition will replace all the outdoor infrastructure and select indoor infrastructure associated with GGNRA’s microwave sites.
The replacement solution should include an installation plan and schedule that allows only one side of the looped bi-directional link to be down at any given time to ensure the radio site network it supports remains operational whenever feasible.
Any problems or errors noted in these performance or technical requirements document should be brought to the immediate attention of the GGNRA Contracting Officer and/or Contracting Officer Rep.
REQUIREMENTS
Propose a compatible solution to replace existing microwave outdoor infrastructure including antennas, waveguides, and all associated support hardware as well as select indoor infrastructure.
DESIGN CONSIDERATIONS
The GGNRA system will interface with LLNS system at the Berkeley and 271 sites. Two M/W links between building 271 and Berkley are shared between both units. The LLNS portion of those links shall not be considered for this acquisition except to note that LLNS is the network manager and hosts the microwave network monitoring and provisioning software.
Each hop should be proposed using space or frequency diversity antenna configurations as indicated with reliability of 99.999%> while maintaining compatibility with all the indoor infrastructure and configurations.
*Please see accompanying Equipment List for details below.
Indoor Radio Units Provided -Each site has been provisioned with two indoor AVIAT IRU600 / INUe Eclipse radios and all supporting hardware and accessories.
-The system is loop protected at each site and is designed using two indoor units facing each path direction.
-At the Berkley and 271 sites the indoor units interface with the indoor units provided on LLNS design to pass TDM traffic and do loop protection using the common shared links.
Wall Passthrough, Building Entry Panels, Penetrations, Waveguide Trays and Ice-Bridges Use Existing where feasible. Propose replacement only where necessary.
EQUIPMENT REPLACEMENT
Outdoor Equipment GGNRA would like to replace the pre-existing antennas, support brackets, hangers, pipe mounts, accessories and waveguides at each site up to and including the pressure window connections to the indoor unit’s waveguide interfaces. Please refer to the equipment list below for specific installed equipment in the current configuration.
* At the B271(Black Mt path) and LBNL(Presidio Hill path) sites, only the path facing Black Mt and Presidio Hill respectively will have the equipment replaced.
If any additional cable management systems or hardware are identified in a site visit prior to award as being suspect due to damage or erosion or other debilitating condition, it will be identified and shared with the Customer so that the requirements may be potentially modified to include replacement hardware or equipment.
* Please note that at the B271 site, the owner will do ALL installation services.
Indoor Equipment GGNRA would like to replace the pre-existing dehydrators and manifolds at each indicated site, the DC Power Supplies/Regulators at each site and any hardware or accessories to link to the existing installed indoor infrastructure.
The sites where dehydrators, manifolds and -48V DC power supplies/regulators will be replaced are ONLY the Mt Tamalpais, Montara Mt, Black Mt and Presidio Hill sites. Do not quote for the B271 or LBNL sites.
Provide a detailed line-item equipment and services list to replace the listed broad categories shown below in the equipment list.
*The Equipment List shall be reviewed by the proposing party for completeness and to ensure it meets the requirements of a ‘complete and operationally viable’ microwave network. Substitutions, additions and deletions where needed shall be reflected in the proposal documentation.
EQUIPMENT & SERVICES SUMMARY NOTES
Antenna System (7Ghz) Performance at least as good as installed Waveguide and Accessories From the proposed antennas to and including the existing pressure windows and mounting hardware as required.
Pressurization Equipment & Installation Network and/or browser-based management. Proven reliability and long running life. Manual shut off valves on the manifold side of the supply lines Do Not quote for LBNL and B271 sites. In addition, quote 1 complete dehydrator and manifold system as a field replaceable spare. Wall mountable solutions please.
DC Power Equipment/Charger To power necessary interior equipment propose redundant power supply solutions where possible.
Network based management and monitoring. Proven reliability and long running life. Do Not quote for LBNL and B271 Sites. If power supply is modular, quote 1 spare field replaceable module of each type for each site. If it is not modular quote 1 complete replacement power supply/regulator unit. Rack mountable solutions please.
Design/Engineering Services Original installation/Integration documentation available
Integration/Installation Services LLNS is network owner/manager.
Grounding and Earthquake Installation Services R56 Standards enforced
Go-Live/Quality Control Services Provide Quality Assurance and Testing Plans
Post-Installation/Closeout Services Documentation/Warranty/Post Completion Services
Pressurization Equipment & Installation The individual pressurization lines from the manifold will have a manual shutoff valve that can be used to stop airflow to each of the associated waveguides (this will be an addition to any software or electronic shut off features available to the replacement units). These valves will be installed as close to the manifold side of the line as possible and still be readily usable by field personnel.
The dehydrator and manifold will be able to be controlled and monitored through a dedicated interface available remotely or locally through the network or local port. If possible the dehydrators must be capable of Network Management Protocol (SNMP) and have a complete set Management Information Base (MIB) files to add to the MIB database that will work with Aviats Provision software.
Currently all sites have the pressurization equipment WALL MOUNTED. Please expect the replacement equipment to be similarly installed and quote and plan accordingly.
Quote one complete ‘spare’ dehydrator/manifold unit.
Power Supplies/Chargers To power necessary equipment (ie. microwave radios, AVIAT IRU600’s), propose -48vdc redundant power supply solutions where possible. Network based management and monitoring preferred with SNMP and MIB support. Proven reliability and long running life. Similar in scope and ability as the currently installed Sageon power supply solution, but with better remote network access.
*Do Not quote for LBNL and B271 Sites.
If power supply is modular, quote one spare field replaceable module of each type for each site. If it is not modular quote 1 complete replacement power supply/regulator unit. Rack mountable solutions please.
Any batteries will have accompanying Safety Data Sheets(SDS). Two(2) copies will be provided, one(1) for the site and one(1) for records archive.
Grounding and Earthquake Stabilization Standards The NPS has adopted the Motorola R56 Standards and Guidelines for Communication Sites at all our telecommunications sites and facilities. Compliance with these standards is expected and should be included in the proposal and any quality control process. Awardee will provide necessary materials and services to ensure all applicable earthquake supports and grounding of outdoor equipment and hardware in accordance with the R56 Standards.
Inventory and Equipment Control Customer will be provided with a detailed factory ‘pre-shipment’ inventory of all materials and equipment for the project. Customer will be provided copies of shipping invoices.
All materials and equipment will be inventoried post-shipment by awardee prior to installation. Post-shipment inventories will be provided to the Customer. The Customer will be provided time, opportunity and access to conduct their own inventory process prior to any installation actions and after if deemed necessary.
Equipment Decommission
Tower Do Not Quote
Antenna system Quote
Transmission and Grounding lines Quote
Pipe mount Quote
-48v DC Power Supply and Charger Quote
UPS/Battery Do Not Quote
Transport decommissioned equipment to Customer Designated Location From Remote Sites Quote
Disposal of decommissioned equipment Quote as option
*The Proposer shall non-destructively (where feasible) uninstall/de-install any of the infrastructure or supporting accessories indicated for replacement and transport them to a Customer designated location from each of the remote sites. This site will likely be located either on the Presidio of San Francisco or Fort Mason of San Francisco.
GGNRA/LLNS PROVIDED MATERIAL SUPPORT
- Network Management System Software(NMS) through LLNS Existing Provision management software will be monitoring LLNS and GGNRA’s system.
- Pre-existing Microwave Radios (AVIAT IRU600 Eclipse).
- Frequency Authorizations through LLNS
- Site and Facility Access (provided conditions are met)
- Provide details of GGNRA’s principle team members by function during the project kickoff meeting.
- Provide details of GGNRA’s single point of contact for the Proposer during the project kickoff meeting.
- Provide security clearances and/or escorts as required for field survey and installation activities.
GGNRA’s CURRENT MICROWAVE INFRASTRUCTURE and SUPPORT EQUIPMENT LIST *Provided for design consideration / Equipment highlighted in YELLOW is infrastructure being replaced by this acquisition action.
Equipment listed can be found at each site except where noted.
ITEM EQUIPMENT LIST AVIAT(MOTOROLA) PART # QTY
Eclipse IRU600 Radio Platform, Operating Band: 7.125-8.500 GHz band , NTIA Band Compliant, 1+1/Space Diversity Configuration with Protected Ethernet, FIPS140-2 Security Suite, WG to top of rack, Licensed for up to 300 Mbps capacity, 24 Month Warranty *Contact LLNS Frequency Manager for Frequency Allocations
DSIRU6008G1000
Eclipse IRU600 Radio Platform, Operating Band: 7.125-8.500 GHz band , NTIA Band Compliant, 1+1/Space Diversity Configuration with Protected Ethernet, DS1 and Loop Switch Interface Cards, Alarm Card, FIPS140-2 Security Suite, WG to top of rack, Licensed for up to 300 Mbps capacity *Contact LLNS Frequency Manager for Frequency Allocations
DSIRU6008G1001
Eclipse IRU600 Radio Platform, Operating Band: 7.125-8.500 GHz band , NTIA Band Compliant, 2+0/Frequency Diversity (FD) Configuration with Protected Ethernet, FIPS140-2 Security Suite, WG to top of rack, Licensed for up to 300 Mbps capacity.
*Contact LLNS Frequency Manager for Frequency Allocations
DSIRU6008G1002
Eclipse IRU600 EHP Radio Platform, Operating Band: 7.125-8.500 GHz band , NTIA Band Compliant, 1+1/Space Diversity Configuration with Protected Ethernet and DS1 Interface Cards, FIPS140-2 Security Suite, WG to top of rack, Licensed for up to 300 Mbps capacity *Contact LLNS Frequency Manager for Frequency Allocations
DSIRU6008G1003
5 RFU, MP, IRU600 IF TR, 7-8 GHz, 7100-8500 MHz DSERMA09401 2
ECLIPSE, INTELLIGENT NODE UNIT 2RU, INC
IDCE, FAN, NCCV2, HIGH OUTPUT
DSEXX000204
7 NODE PROTECTION CARD, HIGH OUTPUT DSEXS002 1
8 RAC 70, QPSK-4096QAM, NO XPIC, ACM DSEXR700001 1
DAC 155OM, 1XSTM1/OC3 MUXED TO 63E1/84DS1, SM OPTICAL, S-1.1, SR, 15KM OR
LESS
DSEXD156001
10 DAC GE3 GIGABIT ETHERNET SWITCH CARD DSEXD181002 1
XCVR ELECTRICAL SFP, GE3 ONLY, W/LOS 3V3
COM (ABCU-5700RZ)
DS083845434001
12 NETWORK CONVERGENCE MODULE (NCM) DSEXD400002 1
13 ECLIPSE, DAC 16XE1/DS1 V2, PROTECTABLE DSEXD161002 1
14 AUX, ALARM I/O CARD DSEXA001 1
FIPS REPLACMENT LABELS 007-600331-001 AND
007-600334-001 KIT
DS179530153005
16 RFU, EHP, IRU600v4 IF TR, 8 GHz, 7725-8500 MHz DSEREA08401 1
JACKFIELD
JACKFIELD CHASSIS, EMPTY, MULTIFUNCTION CHASSIS FOR NORTH AMERICA AND
EUROPE, DSX-1/DSX-3/FIBER/RJ45 CAT 5E & CAT 6 , 16
MODULE CAPACITY, 19", 3 RU, 5"D, -48 VDC (DFX-9E0002)
DSCOMDFX9E0002
JACKFIELD PLUG-IN MODULE, DSX-1 MODULE, 4 CIRCUITS WITH JACKS, FRONT
CROSSCONNECT, REAR WIREWRAP, DUAL MONITOR, -48VDC, LED (DFX-9T1000)
DSCOMDFX9T1000
RACK & ACCESSORIES
RACK ASSY CRATED, 7' CHATSWORTH ALUMINUM, 1 BREAKER PNL W/10 BLANK COVERS
AND NO BREAKERS
DS1795301070113
Installation Kit, Aluminum Rack, Concrete Floor
(AV179-530119-001WA)
DS179530119001
21 STANDARD DC AND GND KIT (AV179-530118-001WA) DS179530118001 6
22 COMMON BREAKERS & BLANKING PLUGS PER RACK PER DRAWING DSCOMMONBREAKERSRACK 6
23 SIPQ-CABLES DSSIPQCABLES 6
CTR 8740 MPLS ROUTER
CTR 8740 with Std Sync option, Fan Assembly, Blank cover plates, Install kit, DC power, incl SD card, Software and Base License
DSCTE740001
CIRCUIT BREAKER 20 AMP SNAPAK (030017750I)
for CTR 1 each
DSPWR000053TRM
GIG ETH SFP, ELEC RJ45 1000BASE-T, CTR ONLY(with RX_LOS) (LX1801CNL-AAN) DS083845537001
27 CTR 8740 Software License - one per chassis
28 CTR 8700 Series R3 MPLS Software License DSCZL67350 11
29 CTR 8700 ENABLE 4 SFP 10/100/1000 PORTS DSCZF67090 11
30 CTR 8700 SECURE MANAGEMENT NODAL LICENSE (ONE LICENSE PER CHASSIS) DSCZF67060 11
CTR 8700 SECURE AUTHENTICATION CLIENT, CENTRALIZED USR ACCT WITH TACACS+
(ONE LICENSE PER CHASSIS)
DSCZF67050
32 CTR 8700 Stacking pair DSLS01 5
33 CTR 8700 HIGH AVAIBILITY LICENSE DSLS02 11
34 CTR 8500 SEGEMENT ROUTING DSLS03 11
CUTOVER MATERIALS
35 CUSTOM WAVEGUIDE KIT COMPLEXITY 3 DSWGKIT3000 2
36 Double E Bend 089-080443-023 4 37 Double E Bend (needed for SD configurations) 089-080443-024 4 Rack, Accessories, & Installation Materials
38 Cooper B-Line 7 Foot, 19 Inch Welded Equipment Rack, Zone 4 Compliant, Gray SK-8794-19-084-YZN 5
39 Cooper B-Line 5ft 2x9/16in steel tubing SB-2005-05-YZ 10
40 Cooper B-Line Angle wall support kit (for attaching to wall) SB-210-KYZ 5
41 Cooper B-Line Wall angle framing kit (for attaching to rack) SB-2212-CYZ 5
42 Fuse Panel, -48VDC 102-107059-001 4
43 28-pos DSX jackfield 010-0656-0100 4
44 50 Pin Wire Wrap Adapter, Male 098-107617-001 16
45 50 Pin Wire Wrap Adapter, Female 098-107617-002 16
46 Interlac OW speaker panel A19-68146-00 4
47 7’0” Self-Supporting Aluminum, Clear 090-746055-503 2
Provision Software
67 ADDITIONAL PROVISION NODE LICENSES, 50 614-250055-001 1
68 ProVision Generic Device Support – single server 614-260215-001 1
69 Provision, GDS package, C&D SAGENET POWER SUPPLY CONTROLLER 614-700040-001 1
70 Provision GDS Package, Extreme Networks Summit X250e TBD 1
71 ProVision Customized Software Development, ETI Dehydrator 614-550200-001 1
72 Extreme Networks Summit X250e switch (Network Management) X250e-24tDC 6
Manufacturing Services 0
73 Motorola R56 Integration Services 1
ANTENNA & WAVEGUIDE SYSTEM
7 GHz Antennas 7125 - 7750 MHz
74 Andrew 4ft STD ant single pol 7.125-8.5 GHz CPR112G with Radome PL4-71W-PXA/E 6
75 Andrew 6ft STD ant single pol 7.125-8.5 GHz CPR112G with Radome PL6-71W-PXA/F 6
76 Andrew 8ft STD ant single pol 7.125-8.5 GHz CPR112G with Radome PL8-71W-PXA 5
77 Andrew 10ft STD ant single pol 7.125-8.5 GHz CPR112G, no Radome PL10-71W-P7A 1
78 Radome for Andrew 10' standard antenna R10G 1
79 Adjustable Tapered Pipe Mount, 4-1/2 OD x 63 (114.3mm OD x 1.6m) PM-412T-63 15
80 Universal Saddle Mount Kit, st or taper leg up to 8" OD SM-U2080 15
81 Side Strut for 4' & 6' Antenna for Andrew antennas VSTRUT-P3KIT 12
82 Side Strut for 8' through 12' Antenna for Andrew antennas 520570-3 6
83 Tower Face Mount, 4.5" OD X 14' Pipe,w/14" Stand-off, w/ (2ea) 2.38"x 63" Strut Support TF-ML4S2-14 3
7 GHz Waveguide & Accessories
84 7 GHz Waveguide. EW77 3,310
85 Connector, Non-Tunable. 177SE 36
86 Hanger Kit for EW77. Kit of 10. 42396A-11 93
87 Grounding Kit w/ Factory Attached Two Hole Lug for EW77. 241088-3 78
88 Hoisting Grip for EW77. 19256B 22
89 Waveguide Entry-Boot. WGB4-77 18
90 36" Flex-twist, CPR112G Flanges, Low VSWR. F112CCS3 18
91 Pressure Window, CPR112G. 55001-112 18
Waveguide Common Accessories
92 Hardware Kit, 3/8" x 1" Bolts, Lock Washer & Nuts. Kit of 10. 31769-1 93
93 Angle Adapter Kit, Stainless Steel 31768A 93
94 Threaded rod support, Stainless Steel 31771-4 11
95 Feed Through Plate for 4" Boots. Four holes. 204673-4 6
Pressurization Equipment
96 ADH NETCOM, AC Dehydrator 23437 5
97 8-pos manifold, 0-15 psi 23658 4
98 Individual high pressure gauge 18163 10
99 T-brass fitting, F-F-M 18163 10
100 Tubing 1/4in ID 3/8in OD 100ft Black 23105 5
101 Compression for 3/8"OD 1/8"NPT 16725 10
102 Elbow, 1/8 NPT to Compression 3/8 OD Tubing 16727 10
103 Hose Barb, 1/4in to 1/8in male, Straight-Brass 23428 15
DC POWER EQUIPMENT
Chargers
104 C&D SAGEON POWERSHELF SYSTEM 48VDC,120VAC INPUT, 4 RACK UNITS,18AMPS
REDUNDANT (includes two 100.7665.4818 rectifiers) H48120V4U18AR 1
105 C&D SAGEON POWERSHELF SYSTEM 48VDC,120VAC INPUT, 4 RACK UNITS,25AMPS
REDUNDANT (includes two 100.7670.4825 rectifiers) H48120V4U25AR 4
106 Ethernet TCP/IP interface to C&D Sageon Charger system TCPIP/SNMP 5
107 uSageon 48/18 (120VAC) - Double Fused Rectifiers 100.7665.4818 1
108 uSageon 48/25 (120VAC) - Double Fused Rectifiers 100.7670.4825 1
Battery Plants
109 C&D Dynasty VRLA BATTERY, 48VDC, 30 AHRS, KIT INCLUDES: (4) TEL12-30 & (1) 19 inch TRAY. Black Mt Site ONLY H48TEL12-30-19 1
SERVICES
Responsibilities The Proposer/Awardee shall appoint a representative to be the primary point of contact for the exercise of this contract and the accompanying requirements to act in the roll of Project Manager for the duration of the project. The Project Manager will work with GGNRA and LLNS to facilitate effective resource management, escalations, approval processes, scheduling, communication, and reporting with engineers and other designated vendors as needed. The Project Manager is responsible for maintaining control of the project and assuring compliance with the project and Customer specifications and requirements as adopted within the contract not only for themselves but any subcontractors under their hire.
Although face-to-face communication and on-site meetings with the Customer and LLNS representatives are essential elements of the service, any activities that do not require face-to-face contact can and should be handled remotely or virtually to reduce cost and time.
Project Schedule Any project schedules shall be in a printable electronic format and will identify project deliverables, key milestones, resource assignments, and track project progress against each milestone. All parties will agree to collaboratively review and compare project milestones and deliverable dates prior to the execution of any services on the project. A copy of the project schedule will be available upon request in Adobe Acrobat .PDF, MSWord .doc, MSExcel .xlsx or other pre-agreed upon format.
Communications Plan The plan will involve representatives from the Proposer/Awardee and Customer and any other entities as mutually agreed between the parties for project kickoff meetings, periodic progress meetings, or problem escalations as needed. The plan can include the location and frequency of any such meetings, the format for formal communication and meeting minutes, agendas, attendee or distribution lists with contact details, methods of communication, and escalation and management level lists.
The Customer will make appropriate staff available for regular consultation and meetings with the Proposer/Awardee Project Manager and other team members as needed.
Site Access and Proposer Security Considerations GGNRA sites are controlled spaces and require escort for access and in some cases may require background investigations.
The Proposer/Awardee shall provide the Customer with a complete list of project personnel requiring access to any Customer controlled or managed site or facility associated with the work under contract.
Proposer/Awardee personnel includes subcontractors of the Awardee. This document will include as a minimum the following information.
Name: First, Middle, Last Driver’s License or State ID # Date of Birth Employer Company Name Employment Address of Record (daily work location) Employment Administrative Phone# (unit supervisor or dept head) Cellphone # (work or personal) and work Email address The personnel list shall be provided to the GGNRA Project Manager at least one full work week prior to any scheduled on-site access or work.
Personnel who are not on the Proposer/awardee provided list or that do not pass a background check may not be allowed access to some or all GGNRA sites.
*Mid-project personnel changes are acceptable, though each individual will require the same level of information and vetting as the original team members which may cause some delay in allowed access.
Pre-award, pre-proposal and post-award site visits can be arranged through the Customer C.O./C.O.R.
GGNRA reserves the right to schedule fixed dates for the initial site walk-throughs and reviews that all Proposers may attend at their discretion, though it is HIGHLY recommended that any interested Proposers attend to get a better understanding of the infrastructure as installed at each site.
Change Management Plan Each party will work closely with the other to manage any scope changes through the term of the project and understand their impact on the project performance from a cost, quality, and schedule perspective.
Any changes will be monitored by the Customer’s contracting office for legal compliance with the Federal Acquisition Regulations (FAR).
Quality Standards and Procedures Quality standards and procedures documents for any stage, phase or step of the project may be provided by the Customer that will be adopted into the contract. If no quality control documentation is provided by Customer prior to execution of these requirements, the standards and procedures will default to the Proposer’s/Awardee’s quality control best practices guide/s. In all cases it is expected that the quality control processes will lead to full performance of the requirements as stated in this document.
Billing and Invoicing In all cases billing and invoicing shall be completed through SAM.gov which will require an Awardee to be registered within that system. Where allowed, at the discretion of GGNRA and contracting officials assigned to this contract, billing and invoicing may have a scheduled bench-mark structure. The awardee desiring this invoicing structure will provide a suggested payment schedule. Failing a billing schedule, the Awardee shall be paid for all equipment and services during the final close out activities.
The Customer shall not pay for services or equipment not verified to have occurred in any case.
Closeout Activities During the project closeout, all quality control processes will be reviewed, project photos provided, any post project documents, such as as-built drawings and manuals will be provided to the Customer.
Post project services and warranties information may be provided Customer.
Project Requirements and contracted deliverables will be assessed for completion by Customer. Awardee may then complete final billing and invoicing.
Performance evaluations provided by the Customer shall be in accordance with guidance from the contracting office and the FAR.
Warranty and After Project Services Warranty plans for all provided equipment shall be no less than one year from the time of the project acceptance (2+ year warranty preferred). Warranty shall include a documented process and contact information for achieving the stated warranty services.
After project services information and pricing may be provided to the Customer at the discretion of the Proposer. GGNRA makes no commitments regarding follow up service agreements or services of any kind.
Training for proposed equipment replacements should not be proposed. Providing complete technical documentation is considered sufficient.
Network Engineering Please note that Lawrence Livermore National Security is the radio/microwave network managers and will need to be consulted during any network design or changes phases of this project.
Proposer will provide a formal submission detailing the final system design and equipment list and highlight changes needed to the preliminary design. Customer shall review the data and if necessary, discuss any concerns with the Proposer for possible action. If no concerns are noted, GGNRA will approve the final design in writing(email) before the design is frozen and equipment is placed on order.
Any site visits or inquiries to finalize the design should be completed during this phase.
Once the Customer approves the final network design there will be a Design Freeze. No further changes to the design without approval and acceptance from both parties in the form of a formal change order.
Proposer may then initiate manufacturing, procurement and fulfillment activities.
Microwave Path Design The Proposer’s representative who oversees transmission (“Transmission Engineer”) ensures the delivery of the best possible network solution by providing the technical direction for the over-the-path RF performance of Proposer system implementation that meets the reliability goals of the requirements.
All microwave paths designs are preliminary, pending final path surveys and frequency coordination. This includes:
• Antenna selections, antenna centerlines, and antenna mounts and location drawings
• Total transmission line lengths.
• Path calculations and profiles.
• The size, type, quantity and configuration of each component.
For the purposes of the Microwave Path Survey and Frequency Planning, LLNS is the frequency manager for the proposed system and transceivers and has obtained the frequency authorizations. LLNS Project Manager should be consulted for frequency assignments when data points are required.
The results of the path survey will be utilized by Proposer for preparation of final performance calculations.
Survey Procedures Proposer shall ensure path calculation sheets are generated for each hop, based upon the recommended centerline heights. Antenna sizes and the choice of propagation protection diversity are chosen to meet the required fade margin and the desired path propagation reliability of 99.999% or better.
Warranty of Path Engineering Services Proposer shall warrant that the installed radio communication path will conform to Customer’s multipath performance reliability objectives when Proposer has performed the path survey, recommended the path design, and implemented such recommendations for at least one (1) year from the date of acceptance of the project completion. This will include any physical mounting and line of site issues during the warranty period.
Documentation All Proposer project documents and records shall be maintained and current and copies, including drawings, illustrations, schedules, Inventories, user and service manuals or quality control records shall be provided to the Customer prior to project completion and sign-off period. All final documents must include any information ‘as-built’ and will include any changes, additions or deletions extant upon completion of installation and quality control actions.
Microwave Site Design The Proposer representative overseeing implementation (“Project Engineer”) will perform field site surveys to verify that telecommunications equipment can be installed, powered and commissioned effectively at each site, antennas, waveguide and accessories can be connected to radios (towers, shelters and buildings), and Customer traffic, alarms and dehydrator lines are fully engineered.
Microwave Site Survey The microwave site survey is intended to gather data and identify the gap(s) between the site’s present state and the site readiness for equipment installation, document any visible issue with the existing infrastructure and equipment that would pose a quality or safety issue during installation, gather environmental data and requirements for telecommunication equipment to function properly (including but not limited to HVAC, temperature, humidity, the general state of the facility as well as seismic evaluation and compliance if required), record flooring, ceiling, grounding, racking data and requirements to mount new equipment (including floor plans, relay rack profiles, aisle numbering plans, and ceiling hangers, ladders, and anchor materials required to meet quality and safety standards.
The survey is also intended to record AC, DC, grounding (as is and to be), and breaker assignments and ensure power and grounding standards are met, identify demarcation types and location between new and existing equipment as well as the type of termination and the details required to terminate to the Customer provided equipment, identify existing radio equipment (fixed and mobile) as well as their operating frequencies, record existing waveguide, dehydrator component and their associated cabling, identify all required or existing tower structures, mounting structures, antenna mounting types, waveguide ladder systems, entryway into telecom shelters, and energy sources.
The results of the Proposer’s survey will be published and released in a site survey report to Customer and Proposer and will be utilized by Proposer for preparation of final power calculations, waveguide requirements, field OEM requirements, installation specifications, field test plans, and traffic cutover plans.
In the event where Proposer will not be performing the site survey, Customer can provide available As- Built documents needed to Proposer to complete the site engineering and final system design.
Field Installation Management Awardee will manage the day-to-day activities of the field installation and installation team with support from Customer to quickly resolve issues and ensure the project remains on schedule as per the agreed project schedule.
Awardee is responsible for providing any health and safety mitigation equipment, PPD, transport, tools, materials and support during the installation process.
Installation, Integration and Testing The Proposer’s installation, integration, and testing services should include design-supported methodologies, product expertise, and field-proven processes to help ensure a quality installation and testing of critical system paths and hardware so that the network performs according to its design. The Awardee will designate a primary point of contact to answer any Customer questions, provide guidance, and address issues specific to this service.
• Please note that plastic tie wraps for cable management are considered unacceptable. Use of hook and loop fastening strips or something similar that does not pinch or damage cables is desired.
Scope Delivery of this service will utilize the design documentation developed as part of the planning and design phase. Field crews will utilize this (Installation Plan or Checklist) documentation to:
• Install indoor and outdoor microwave equipment, accessories, and components
• Perform system integration
• Perform system testing and quality control documentation
An inspection will be performed with the Awardee and Customer representatives after completing the physical installation. Workmanship deficiencies will be noted on a punch list for correction. This inspection is not intended to verify operation of the new system or suitability of components, but rather to inventory and document that all equipment and materials from the schedule of values are installed to acceptable workmanship quality standards. Site drawings will be reviewed and red-lined to reflect the installed condition.
Testing Test crews will begin work as soon as feasible after installation is complete. A Test Plan will be provided to the Customer. Testing, based on a standard set of Awardee test cases, will be performed on all provided equipment to confirm configuration, operation, and manufacturer’s specifications. Any test procedures or ‘Test Plans’ provided will be reviewed and possibly changed by the Customer prior to implementation and scheduling. Test data will be recorded on field test sheets, and/or electronically by technical field personnel who will also be responsible for documenting test results and any changes made to the design documentation. Copies in electronic format of all test and quality control documentation shall be provided to the Customer prior to final project acceptance.
The Awardee’s test crews will be trained on the infrastructure equipment and utilize appropriate test equipment to perform all tests. Test equipment will have valid calibration certifications, which can be verified prior to commencing any tests.
Commissioning tests will consist of a set of standard Awardee’s test cases and include turn-up and performance verification tests and circuit tests to verify end-to-end continuity and equipment operation as well as any other tests documented in the field acceptance test plan. The field acceptance test plan shall be approved and agreed to by the Awardee and Customer prior to test execution. Test results will be recorded on field test data sheets and/or electronically and submitted to the Customer.
The Field Acceptance Test Plan will be expected to include the following, but does not exclude other data points...
- Inclusion/exclusion of any specific test or quality control element listed here on the final Test Plan will be considered on a case-by-case basis. The Test Plan is an effort at quality control, proof of operation and baselining operational data for future preventative and corrective actions and whatever testing is required to achieve those goals will be considered.
1. Identify Site and Provide Verified Location Information
2. Document and Verify Antenna Sighting/Alignment, Centerline and Azimuth
3. Identify Link Path
4. Identify Associated Equipment Model/Serial #'s, Specific Signal Output Source/Equipment by site and link.
5. Identify Frequencies by Path
6. Verify and Document Path Distance/Length
7. Document Protection Type(Diversity/Redundancy), Spacing, Size, Antenna Type, and Tower Location.
8. Identify Transmission Line Manufacturer/s, Type and Length. Termination, Connector Manufacturer/s, Type, Model #
9. Identify Software/Firmware Load where appropriate
10. Identify System/Network Addressing where appropriate
11. Any other quality assurance and proof of operation testing inherent for the specific model, type, features or options of offered equipment.
System tests will be performed on a logical section/loop of the system. The system tests will be designed to demonstrate performance and functionality of system features as-well as end-to-end operation of individual circuits/services. System test results will establish benchmark system performance and operation prior to cut-over and acceptance. The test data sheets prepared during commissioning and system testing will become the base line document for maintenance and performance evaluation of the system over an extended period of time. Customer will review the commissioning and acceptance testing and results and red-lined drawings and provide approval of the data and authorization to proceed with cut-over activities. Testing data and results will be provided as soon as it is feasible after the actual testing has been completed and prior to final close out package so that in the case that the test results do not meet requirements they can be rescheduled.
Traffic Cut-over Traffic cut-over will be a joint effort and coordinated between Awardee’s Field Integrators and Customer and LLNS’s technical teams.
Williams, Paul S Redundant? #2 and #7
Project Health and Safety The health and safety of all individuals, whether in the field, plant or office, takes precedence over all other concerns. The goal is to prevent accidents and to reduce personal injury and occupational illness and comply with all safety and health standards. The Proposer/Awardee is expected to provide any equipment including personal safety devices for each member of its team as required to ensure safe working conditions.
The Awardee shall provide safety and first aid material and supplies to all construction and installation personnel or made available at each site for the duration of this project. All safety and first aid material will be stocked at acceptable levels and will have not exceeded the expiration dates where applicable.
OCCUPATIONAL HEALTH and SAFETY STANDARDS, DIRECTIVES and RECOMMENDATIONS FOR
TELECOMMUNICAIONS RELATED PROJECTS
GENERAL & CONSTRUCTION
• OSHA 29 CFR 1910
• OSHA 29 CFR 1926
• OSHA 3146 Fall Protection in Construction
TELECOMMUNICATIONS
• OSHA 29 CFR 1926, Subpart M
• OSHA Directive, CPL 02-01-036 [2002, March 26]
• ANSI A10 Construction and Demolition Operations Standards
• ANSI Z359 Fall Protection and Fall Restraint
• National Association of Tower Erectors (NATE) Tower Climber Fall Protection Training Standard
• OSHA 3877 Communications Tower Best Practices
SITE and PATH INFORMATION
Frequency authorizations and information provided by LLNS. Sites are developed. Towers provided. Site and existing infrastructure information verification is highly recommended prior to ordering equipment purchase and/or installation through a physical site survey.
There are six(6) sites total when considering equipment replacement. All of the site equipment replacement requirements can be extrapolated by referring to the Equipment List above.
Black Mountain : Requires power supply, rectifier, charger and battery replacement. Any batteries will have accompanying Safety Data Sheets(SDS). Two(2) copies will be provided, one(1) for the site and one(1) for records archive. This site also requires a pressurization system, waveguide and antenna replacement.
B271 : This site will require ONLY antenna and waveguide replacement on one(1) hop (B271-Black). All installation and work to be completed by LLNS staff.
Montara Mountain : Requires power supply, pressurization system, waveguide and antenna replacement.
Presidio Hill : Requires power supply, pressurization system, waveguide and antenna replacement.
Mount Tamalpais : Requires power supply, pressurization system, waveguide and antenna replacement.
LBNL : This site will require ONLY antenna and waveguide replacement on one(1) hop (LBNL-PHill)
Black Mountain to LLNS-bdg271 (35.03 miles) (K-1.33, %F1-100.00,60.00)
SITE BLACK LLNS-271
Elevation (ft) ASL 2804.92 597.11 Latitude 37 19 07.39N 37 41 18.80N Longitude 122 08 46.48W 122 42 33.50W True Azimuth (deg) 43.13 223.4 Vertical Angle (deg) -0.85 0.47
FREQUENCY
Freq (Mghz) / Diversity 8260 / - 7900 / - Tower Height (ft) 80’ ?
Waveguide Length (ft) / Diversity 135 / 100 235 / 200 Antenna Height (ft) / Diversity 70 / 40 150 / 120
PATH
Length (miles) 35.03 35.03
RADIO
Radio Model (AVIAT) IRU 600 7/8 IRU 600 7/8 Tx Power (dbm) 35 35 Modulation 512 512 Capacity 268 268 ACM / QPSK / 512 Yes Yes Capacity (52 QPSK-268 512) 52 QPSK-268 512 52 QPSK-268 512 Channel Size (Mghz) 40 40
Montara Mountain to Black Mountain (24.70 miles) (K-1.33, %F1-100.00,60.00)
SITE MONTARA MT BLACK
Elevation (ft) ASL 1805.28 2804.92 Latitude 37 33 41.00N 37 19 07.39N Longitude 122 28 36.00W 122 08 46.48W True Azimuth (deg) 132.55 312.75 Vertical Angle (deg) 0.3 -0.57 Tower Height (ft) 80’ 80’ Waveguide Length (ft) / Diversity 102 / 82 76 / 46 Antenna Height (ft) / Diversity 50 / 20 50 / 20
FREQUENCY
Freq (Mghz) 7270 7570 Diversity Freq (Mghz or Space Diversity SD) SD SD
PATH
Length (miles) 24.7 24.7
RADIO
Radio Model (AVIAT) IRU 600 7/8 IRU 600 7/8 Tx Power (dbm) 27.5 27.5 Modulation 512 512 Capacity 268 268 ACM / QPSK / 512 Yes Yes
Presidio Hill to Lawrence Berkeley National Laboratory (13.13 miles) (K-1.33, %F1-100.00,60.00)
SITE PRESIDIO HILL LBNL-BERKELEY
Elevation (ft) ASL 351.05 911.68 Latitude 37 47 38.00N 37 52 32.16N Longitude 122 27 48.00W 122 14 47.50W True Azimuth (deg) 64.52 244.65 Vertical Angle (deg) 0.35 -0.50 Tower Height (ft) 150’ ?
Waveguide Length (ft) 288 130 Antenna Height (ft) 147 100
FREQUENCY
Freq (Mghz) 7570 7270 Diversity Freq (Mghz or Space Diversity SD) SD SD
PATH
Length (miles) 13.13 13.13
RADIO
Radio Model (AVIAT) IRU 600 7/8 IRU 600 7/8 Tx Power (dbm) 27.5 27.5 Modulation 512 512 Capacity 268 268 ACM / QPSK / 512 Yes Yes
Mount Tamalpais to Montara (25.82 miles) (K-1.33, %F1-100.00,60.00)
SITE MT TAMPALPAIS MONTARA MT
Elevation (ft) ASL 2520.51 1805.28 Latitude 37 55 24.00N 37 33 41.00N Longitude 122 35 50.00W 122 28 36.00W True Azimuth (deg) 165.15 345.22 Vertical Angle (deg) -0.44 0.16 Tower Height (ft) 60’ 80’ Waveguide Length (ft) / Diversity 102 / 70 76 / 70 Antenna Height (ft) / Diversity 50 / 20 50 / 20
FREQUENCY
Freq (Mghz) 8380 8020 Diversity Freq (Mghz or Space Diversity SD) SD SD
PATH
Length (miles) 25.82 25.82
RADIO
Radio Model (AVIAT) IRU 600 7/8 IRU 600 7/8 Tx Power (dbm) 26.5 26.5 Modulation 512 512 Capacity 268 268 ACM / QPSK / 512 Yes Yes
Mount Tamalpais to Presidio Hill (11.55 miles) (K-1.33, %F1-100.00,60.00)
SITE PRESIDIO HILL MT TAMPALPAIS
Elevation (ft) ASL 351.05 2521.33 Latitude 37 47 38.00N 37 55 24.00N Longitude 122 27 48.00W 122 35 50.00W True Azimuth (deg) 320.69 140.6 Vertical Angle (deg) 1.90 -2.03 Tower Height (ft) 150’ 60’ Waveguide Length (ft) / Diversity 271 / - 77 / - Antenna Height (ft) / Diversity 130 / - 50 / -
FREQUENCY
Freq (Mghz) 8260 7900 Diversity Freq (Mghz or Space Diversity SD) 7375 7675
PATH
Length (miles) 11.55 11.55
RADIO
Radio Model (AVIAT) IRU 600 7/8 IRU 600 7/8 Tx Power (dbm) 26 26 Modulation 256 256 Capacity 254 254 ACM / QPSK / 512 Yes Yes
Equipment Decommission
File details come from the government source that posted it. Updated .