B08_Att_01_140P8423R0010_Specifications.pdf

PDF 863 KB Posted

Attached to
Shade Structures, Chaparral Day Use Area, NPS-PINN Federal contract opportunity
Solicitation number
140P8423R0010
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This project specification outlines requirements for providing and installing shade structures and stabilized decomposed granite pathways at Chaparral Day Use Area in Pinnacles National Park. The National Park Service seeks one contractor to supply and install one 14' x 32' steel shade structure, four 12' x 12' steel shade structures, and approximately 600 square feet of stabilized decomposed granite pad with 1,200 square feet of pathway connecting park amenities. The specifications provide material and installation requirements for the steel shade structures and decomposed granite surfacing. The contractor must adhere to all applicable codes and regulations, obtain necessary permits, and follow park rules and procedures during construction work.

View the file

Other files for this federal contract opportunity

Other files attached to Shade Structures, Chaparral Day Use Area, NPS-PINN, newest first.
File Type Posted
B08_Attachment_06_140P8423R0010_Site_Visit_Notes-Q-A_0001.pdf PDF
B08_Attachment_05_140P8423R0010_Site_Visit_Sign_In_Sheet_0001.pdf PDF
Sol_140P8423R0010_Amd_0001.pdf PDF
B08_Att_04_140P8423R0010_Proposal_Submission_Package.pdf PDF
B08_Att_02_140P8423R0010_Drawings.pdf PDF
Sol_140P8423R0010.pdf PDF
B08_Att_03_140P8423R0010_DBA_CA20230018_2023Jun30.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 1

PINNACLES NATIONAL PARK

SHADE STRUCTURES, CHAPARRAL DAY USE AREA

PMIS 285631

PROJECT SPECIFICATIONS

GENERAL REQUIREMENTS

By: Diane Ochi Tsuji Date: 4/2/2023

PART 1 – SUMMARY OF WORK (SECTION 01 11 00)

1.10 WORK COVERED BY CONTRACT DOCUMENTS

A. General: All work outlined below will be performed under a single contract.

B. Project Location: This project is located at Chaparral Picnic Area, at the end of State Highway 146 on the west side of Pinnacles National Park, approximately 8 miles east of Soledad, California. The delivery address is the west park maintenance facility at 2011 Chaparral Rd, Soledad, CA and the lat/long coordinates are 36.491757, -121.209242 NOTE: Pinnacles National Park is divided by a mountain range into east and west districts that are not connected by road. State Highway 146 does not continue through the park—it dead-ends on the east and west.

C. Project Background: The Chaparral Picnic Area is the main trailhead for the most popular west side trails, seeing approximately 36,200 visitors a year. Summer temperatures are often over 100 degrees and the natural landscape has limited tree cover. There are no shaded areas where visitors can rest or eat. The existing picnic tables are weathered, splintered and sagging from sun exposure.

The park intends to have 5 shade structures purchased and installed at Chaparral picnic area.

One larger shade structure will cover a new fully accessible group picnic site near the existing restroom. The site will be paved with stabilized decomposed granite and have space for 3-4 tables. A new decomposed granite path meeting ABA standards for Outdoor Recreation Access Routes (ORAR) is needed to connect the group picnic shelter to existing visitor amenities at the trailhead. The shade structures are specified with brown colored steel posts and roofing for durability, low maintenance, and compatibility with the surrounding landscape.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 2

Four small shade structures of similar design will be purchased and installed further north in Chaparral picnic area to cover single tables on the existing trail. Any needed accessibility improvements for trails to these picnic sites will be done in-house by park staff.

There is one scope option to provide and install a shade structure over existing benches and paving at the end of the accessible section of Prewett Point Trail, near West Pinnacles Visitor Center.

D. Definition of Contract Line Items:

1. Contract Line Item No. 1: This item shall consist of:

Provide and install (1) 14’ x 32’ steel shade structure and (4) 12’ x 12’ steel shade structures. See Drawings and Technical Specifications 10 73 46 for Prefabricated Steel Shelter. Measurement and payment shall be on a lump sum basis.

2. Contract Line Item No. 2: This item shall consist of:

Provide and install approximately 600 sf pad of stabilized decomposed granite for the large shade structure. Slopes on the pad may not exceed 2% running or cross slope.

Provide and install approximately 1200 sf of stabilized decomposed granite pathway connecting the new accessible picnic pad to the existing accessible parking space, portable toilet, drinking fountain, trail sign, trash/recycle containers, and concrete pad with viewing scopes. All new pathway paving shall meet federal ABA Accessibility Standards for Outdoor Recreation Access Routes (ORAR), including 5% maximum running slope on pathways and 2% maximum cross slopes. All edges of stabilized decomposed granite paving shall be contained by 4x6 redwood edging drilled and staked into the subgrade. Remove asphalt pad around drinking fountain and trash/recycle bins and reset them on new paving as needed. Note: the existing restroom is in the floodplain and its interior is not accessible, so the new decomposed granite pathway does not need to upgrade access to the building. See Drawings and Technical Specifications 32 15 43 for Stabilized Decomposed Granite Paving. Measurement and payment shall be on a lump sum basis.

3. Contract Line Item No. 3 (OPTION): This item shall consist of:

Provide and install (1) 8’ x 22’ steel shade structure at existing accessible bench area on the Prewett Point Trail. No new paving is included. See Drawings and Technical Specifications 10 73 46. Measurement and payment shall be on a lump sum basis.

DI. Work Phases: The work shall be conducted in one (1) phase.

1.2 REFERENCE DOCUMENTS / REPORTS

A. General: The following reference documents / reports are attached or available upon request to supplement the information in the specifications:

1. NPS Forms (RFI, CM-16, and QC Daily Report).

2. Site Map.

3. Park Regulations

4. Construction Plans

5. Technical Specifications

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 3

1.3 CODES, STANDARDS, & REGULATIONS

A. General: The Contractor shall complete all work in accordance with the latest versions of applicable codes, standards, and regulations. The following codes, standards and regulations are directly related to the project: Architectural Barriers Act Accessibility Standards, including Chapter 10, Outdoor Recreation Facilities.

Pinnacles Self Evaluation and Transition Plan (SETP), 2016

1.4 PERMITS

A. General: The Contractor shall obtain all applicable permits associated with the work and/or comply with all permit conditions furnished by the NPS. A general building permit is not required for work on NPS land; however, the Contractor must still comply with state and local building code provisions. The following permits must be obtained by the Contractor prior to the commencement of work: None anticipated.

1.5 GOVERNMENT-FURNISHED ITEMS

A. The Government may furnish products and materials for incorporation into the work. If the government furnishes products or materials for incorporation into the work:

1. The government will arrange and pay for delivery of government furnished items to the project site based on the contractor’s approved construction schedule.

2. After delivery, the government will inspect delivered items for damage. If items are damaged, defective, or missing, the government will arrange for replacement.

3. The contractor is responsible for receiving, unloading, and handling government furnished items at project site for use in the work.

4. The contractor is responsible for protecting government furnished items during storage, handling, and the work, including damage from exposure to the elements.

5. If government furnished items are damaged as a result of the contractor’s operations, the contractor shall repair or replace the items in-kind.

B. Government-Furnished Items: The government will furnish the following products or materials for use on this contract: None anticipated.

1.6 PUBLIC / STAFF USE OF THE SITE

A. General: The project site will be open to the public and staff during construction. The Contractor shall at all times conduct operations to ensure the least inconvenience to the public and staff. Temporary closures may be permitted upon specific written approval of the Contracting Officer.

1.7 CONTRACTOR USE OF SITE

A. General: Limit construction operations to the project area limits as outlined on the attached

Site Map.

B. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 4

C. Park Entry: Vehicles associated with the Contractor shall be waived the entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicle(s) and their license plates. Please note that the entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.

1. Provide the Contracting Officer with a listing of all contract personnel and their associated vehicles entering the park daily.

2. Provide the Contracting Officer with a listing of anticipated deliveries for each week.

D. Site Access: The contractor shall access the project site as outlined on the attached Site Map.

Do not drive vehicles off road or access non-project areas without permission from the Contracting Officer or their representative.

E. Working Hours: Regular work hours shall be limited to daylight hours from 7:00 a.m. until

5:00 p.m. Monday through Friday, excluding government holidays. Work outside regular hours requires advance approval from the Contracting Officer.

F. Staging and Storage: Confine the staging and storage of equipment and materials to the areas as shown on the Site Map or as established at the preconstruction meeting

G. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or Park Dispatch at the first available opportunity at: 541-592-2100 x.2275.

H. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation.

Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

PART 2 – WORK RESTRICTIONS (SECTION 01 11 40)

2.1 WORK RESTRICTIONS

A. General: The Contractor must comply with the following work restrictions:

B. Vehicles / Heavy Equipment:

1. Rules of the Road: All vehicles and heavy equipment will comply with posted traffic regulations, including speed limits and double-yellow center lane markings. Vehicles and heavy equipment shall take every safe opportunity to use paved roadside pullouts in order to allow faster moving traffic to pass. Failure to comply with traffic regulations will result in a citation being issued to the driver.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 5

2. Vehicle Parking: The contractor shall park vehicles and heavy equipment in designated areas as shown on the Site Map or as established at the preconstruction meeting.

Vehicles are not permitted within long-term or overnight parking along park roads or in associated overlooks / pullouts.

3. Driveways and Entrances: The contractor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles always.

4. Vehicle Exhaust: All vehicles will be properly maintained to ensure that the exhaust produced is within legal limits. The effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.

5. Spills: The Contractor shall be responsible for any cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. The Contractor must immediately notify Contracting Officer of spills.

6. Equipment maintenance and refueling shall take place in areas designated by the CO, and a minimum of 100 feet from waterways, drainages and wetlands.

7. Equipment shall be inspected before entering the park for hydraulic and oil leaks, and inspected weekly thereafter.

8. Concrete trucks shall be cleaned at locations designated by the CO, with holding facilities for water and residual concrete. Contractor shall remove wash down material and dispose in accordance with all laws and regulations at approved disposal sites outside the park boundary.

9. Drivers must watch for animals on or alongside roads and at the jobsite. Contact Park

Dispatch at 541-592-2100 immediately if an animal is hit or injured or will not move off the road.

10. DOT Compliance: All vehicles are to be compliant with all DOT requirements including but not limited to driver with appropriate license class, medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, mounted fire extinguisher, and valid DOT safety sticker.

11. Slow Vehicles: The Contractor is to notify the Contracting Officer of slow vehicles that may cause traffic delays or extended traffic lines. Vehicles that are slow are requested to enter the Park AFTER 2:00 p.m. and exit the park BEFORE sunset.

12. Oversized Vehicles: Oversized vehicles are defined as vehicles where the width of the vehicle or load exceeds one lane (i.e., beyond the center line of the paved road).

Oversized vehicles must not exceed the clearances along the Park road corridor.

Oversized vehicles will require an escort and drivers must avoid driving on the edges of the Park road. The Contractor is to notify the Contracting Officer of oversized vehicles, scheduled dates, and estimated arrival times at the park entrance; and the identity of who

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 6 is escorting the vehicle (e.g., police, contractor, etc.). Vehicles that are oversized are requested to enter the Park AFTER 2:00 p.m. and exit the Park BEFORE sunset.

13. Road & Weight Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on the Park road (36 CFR § 4.11).

No loads heavier than the current load rating for park roads and bridges will be permitted.

C. Resource Protection:

1. General: The Contractor shall protect park resources, including natural, cultural and physical resources, and make every effort to minimize the risk of damage from construction operations. Contractor shall comply with all applicable Federal, State, and local environmental laws and regulations pertaining to water, air, solid waste, chemical waste, sanitary waste, hazardous materials, sediment, light and noise pollution.

Contractor shall ensure that subcontractors comply with all requirements of this section.

2. Training: All Contractor and subcontractor construction staff are required to attend a park orientation session provided by park staff before commencing work. Orientation sessions will include information about park regulations, environmental protection, special status wildlife species, and historic and archeological resources. Notify the CO at least two weeks in advance before starting on-site work so an orientation session can be coordinated. Contractor to request additional orientation sessions 3 days in advance for all new construction staff.

3. Preservation of Natural Features: Contractor shall not remove, cut, deface, injure, or destroy natural features of the park including vegetation, topsoil, rock and landforms without prior approval by the CO.

4. Vegetation:

a. Do not attach ropes, wires, guy lines, cables, or chains to trees or vegetation.

b. No storage of equipment or materials shall be allowed within the dripline of trees not designated for removal. If grading, trenching or excavating within the dripline is necessary, obtain procedures from park staff for minimizing root damage to trees.

c. Tree pruning must be approved in advance by the Contracting Officer and supervised by a licensed arborist. Pruning tools must be sterilized before use to prevent spread of disease.

d. Restore damaged areas and replace damaged trees, vegetation, and grass with approved plants and seeds at no expense to the government.

5. Invasive Species: The introduction of non-native invasive species can threaten rare and endangered species or can create new populations of non-native species not traditionally found in the park.

a. The contractor is required to inform personnel, subcontractors, and vendors to thoroughly clean all vehicles (especially the tires), equipment, tools, supplies, and materials prior to packing / loading for transport into the park.

b. The park requires and will perform inspections to prevent transport of non-native species PRIOR to arriving at the park entrance. Contact the Equipment Inspector David John at 541-592-2100 x.2256 at least (3) three days in advance of park entry to arrange for inspection(s) at the loading dock or point of origin.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 7

6. Imported Earth Materials:

a. Contractor shall identify clean local sources of rock, sand, gravel, earth, and natural materials to avoid importing weeds, pathogens and contaminants into the park.

Imported materials shall be from sources approved by the CO and Resource Management staff prior to delivery.

b. Store approved imported materials in clean staging areas, with covers to protect from contamination by windblown weed seeds or other contaminants.

7. Wildlife Protection: The following threatened or endangered wildlife species occur in the park: California Condor, California Tiger Salamander, and California Red-Legged Frog.

If any of these species are observed within the project area, stop all work that might disturb or harm the animal, notify the CO immediately, and do not resume work until approved. Minimize disturbance to endangered wildlife from construction with the following measures:

a. At the preconstruction meeting and resources training, park resources staff will discuss seasonal and year-round requirements to check equipment and work sites for endangered frogs and salamanders, and housekeeping to discourage animals from sheltering on the work site.

b. Ensure the work area is cleaned up at the end of each work shift so that loose tools, debris, and materials are not left out in a manner that could present a hazard to endangered species.

c. Noise and vibrations of equipment shall be kept to a minimum when working in the vicinity of endangered species.

d. Hazmat spill prevention protocols shall be employed when using gas-powered equipment.

e. Use tarps to contain all paint chips and building debris from exterior surfaces that may fall to the ground.

f. Ensure loose nails and screws do not make it to the ground when working on exterior surfaces. Check the work site daily and remove trash, food wrappers, and waste including candy wrappers, bottle caps, and broken glass that could be ingested by condors and other wildlife.

g. Do not allow water to pool overnight on the construction site as it may attract endangered frogs or salamanders. Excavations more than 1’ deep must be covered or include an escape ramp to avoid trapping them.

8. Site Housekeeping and Cleanup:

a. All garbage must be disposed of in approved, animal-proof disposal bins with lids that are secured at the end of each workday. Construction debris may be stored in unlidded dumpsters. DO NOT MIX GARBAGE AND GREEN WASTE WITH

CONSTRUCTION DEBRIS.

b. At the end of construction, Contractor shall, unless otherwise instructed in writing by the CO, remove all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work.

Disturbed areas shall be graded, filled and final erosion control measures and/or revegetation installed per the construction drawings and technical specifications.

9. Cultural Resouces: Cultural resources are surface and subsurface archeological resources, historic structures and buildings, cultural landscapes, and Native American traditional

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 8 cultural resources. Sensitive cultural resources that are known or might be found on the job site will be discussed at the preconstruction meeting.

a. The Contractor’s Project Superintendent, or designee, will observe all ground-disturbing activities in archaeologically sensitive areas.

b. If the Contractor discovers archeological resources, the Contractor shall stop work or relocate to a non-sensitive area and contact the Contracting Officer immediately. In known culturally sensitive areas, the Park may assign an Archaeological Monitor to the jobsite who is authorized to stop work upon discovery of archaeological resources.

10. Soundscape / Noise: The contractor shall minimize noise levels at the project site to protect the soundscape of the park. Perform noise-producing work in less sensitive hours of the day or week or as directed by the contracting officer.

11. Hazardous Materials: Hazardous or flammable chemicals may not be stored on the job site unless identified in the Site-specific Safety and Health Plan and approved by the Contracting Officer and Fire Marshal.

PART 3 – PROJECT MANAGEMENT (SECTION 01 31 00)

3.1 SUBMITTALS

A. Division 01 Submittal Documents: The following documents shall be submitted a minimum of one week prior to the Preconstruction Meeting. If all of these documents have not been received one week prior to the scheduled Preconstruction Meeting date, the meeting will be cancelled and the Notice to Proceed (NTP) will not be issued. Work shall not commence until written Notice to Proceed (NTP) has been issued.

1. Letter designating the Project Superintendent.

2. Construction Schedule - Submit a baseline schedule with start date, end date, major work activities and durations, estimated pre-final inspection date, and other major milestones.

Provide updates to baseline schedule as needed / requested during construction.

3. Schedule of Values (SOV) – Submit a schedule of values with a breakdown of component work activities for which progress payments will be requested. The total costs for the component work activities shall equal the total contract price.

4. Site-specific Safety and Health Plan (SSHP) – Submit an accident prevention plan with the name of the supervisor responsible for executing the plan, a job hazard analysis for each major work activity, first aid procedures, and planning for potential emergency situations.

5. Under-An-Acre Pollution Prevention Plan (UPPP) - For projects with ground disturbance estimated to be less than 1-acre, complete and submit an UPPP to the NPS with best management practices (BMP’s) to prevent the discharges of pollutants.

6. A list of Subcontractors for this project.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 9

7. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

8. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

B. Division 02-49 Submittal Documents: The following documents shall be submitted to the

Contracting Officer prior to construction start. If these documents have not been received and approved by the NPS prior to construction start, the construction start date may be delayed.

1. Product Data – Submit product cut sheets / material data on all products to be used for approval. Indicate the size, model, or type of each recommended product and any selected options.

2. Samples – When requested, submit a physical sample of a product or an array of color choices for approval.

3. Shop Drawings – Submit shop drawings that embody all major elements of the work.

Shop drawings are typically required for prefabricated components or to illustrate the coordination work between trades. The shop drawing’s primary emphasis is on the particular product or installation. Submit shop drawings for the following work: Each different shade structure configuration, footing design, and installation details.

a. Drawings shall be developed in AutoCAD or similar drafting software.

b. Drawings shall include details, dimensions, notational information and other data to ensure the contractor has a complete understanding of the work.

c. Submit drawings and supporting calculations stamped by a registered professional engineer.

d. Drawings shall be submitted to the Contracting Officer in PDF format. Allow 2 weeks for the drawings to be reviewed by NPS staff. The Contractor shall incorporate review comments into the shop drawings and resubmit for final approval.

e. Update shop drawings if changes occur during or after installation, and submit to the Contracting Officer with closeout materials.

3.2 PRECONSTRUCTION AND PROGRESS MEETINGS

A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting either on site or via teleconference. The meeting agenda will include the following topics:

1. NPS Roles & Responsibilities

2. Key Contractor Personnel

3. Coordination with Subcontractors

4. Correspondence & Submittal Procedures

5. Submittals

a. Status of Division 01 Submittals

b. Schedule & SOV

c. Safety & Accident Prevention Plan

d. Storm Water Pollution Prevention Plan

e. Status of Division 02-49 Submittals

6. Park Rules & Regulations

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 10

7. Work Hours and Weekend, Holiday, and Night Work

8. Project Information

a. Park Access & Vehicle Reporting

b. Jobsite Access & Parking

c. Staging, Storage, and Laydown Area(s)

d. Temporary Facilities & Controls

e. Jobsite Restrictions

f. Resource Protection

g. Weather, Climate, Environmental Conditions

h. Reference Documents

i. Other Contracts / Ongoing Work

9. Labor Standards Provisions

10. Labor Interviews

11. Payroll Reports

12. Payments to the Contractor

13. Change Orders / Modifications

14. Progress Meetings

15. QC Daily Reports

16. Inspections

17. Acceptance and Rejection of Work

18. Closeout Procedures & Submittals

19. Contract Period of Performance

20. Notice to Proceed

B. Progress Meetings: The NPS may schedule periodic meetings to discuss the progress of the work with the Contractor, Subcontractor(s), and key NPS staff. The need for, frequency, schedule, attendance, and responsibilities at these meetings will be discussed at the preconstruction meeting.

3.3 REQUESTS FOR INFORMATION (RFIs), A. General: On discovery of the need for additional information or interpretation of the contract documents, the Contractor shall prepare and submit an RFI utilizing the form attached.

1. Contracting Officer will only respond to RFIs submitted by the prime contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. RFI Form: Include a detailed, legible description of the subject or item needing information or interpretation on the RFI Form with:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, if applicable.

5. Drawing number and detail references, if applicable.

6. Description of the issue or question.

7. Photographs or sketches, if applicable.

8. Contractor's suggested resolution. If the Contractor's suggested resolution impacts the contract time or the contract sum, Contractor shall state the impact in the RFI.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 11

C. Response to the RFI: The Contracting Officer will review each RFI, determine the action required, and respond accordingly.

PART 4 – SUBMITTAL PROCEDURES (SECTION 01 33 23)

4.1 SUBMITTAL PROCEDURES

A. CM-16 Transmittal Form: All submittals shall be transmitted using NPS CM-16 form attached to the end of this specification section. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Complete all applicable fields, sign the form, and attach all supporting documentation.

PART 5 – SAFETY REQUIREMENTS (SECTION 01 35 23)

5.1 SAFETY REQUIREMENTS

A. General: The Contractor must comply with the following safety requirements:

1. First Aid Equipment: Provide adequate first aid equipment for all contract employees for the hazards associated with the types of ongoing construction work at the site.

2. First Aid Training: Provide adequate training to all Contractor personnel to ensure prompt and efficient application of first aid.

3. Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees.

4. Hazardous Materials: Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. Store hazardous materials in accordance with manufacturer’s and OSHA recommendations. Maintain MSDS onsite for each chemical used on the jobsite.

Immediately report all spills of hazardous materials to the contracting officer.

5. Safety Meetings: At a minimum, conduct weekly if not daily "toolbox" safety meetings.

These meetings shall be conducted by the Onsite Job Superintendent or crew leader and be attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the week.

6. Emergency Contacts: Post telephone numbers and reporting instructions for ambulance, hospital, fire department, police, and park dispatch in conspicuous locations at the site.

7. Emergency Medical & Accident Reporting: In the event of an emergency / medical incident, the Contractor shall Dial 911 as needed. The Contractor shall also contact Park Dispatch at: 1-541-592-2100 for any medical emergency, traffic accident, or personal injury occurring within the Park. Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 12

PART 6 – QUALITY REQUIREMENTS (SECTION 01 40 00)

6.1 QUALITY REQUIREMENTS

A. General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance are in compliance with applicable specifications, drawings, codes and standards.

B. Quality Control (QC) Daily Reports: Submit quality control daily reports documenting the progress and quality of the work. The Contractor’s Quality Control Supervisor shall utilize the forms attached at the end of this Section. The submission frequency of the QC Daily Report to the Contracting Officer will be determined at the preconstruction meeting.

PART 7 – TEMPORARY FACILITIES & CONTROLS (SECTION 01 50 00)

7.1 TEMPORARY FACILITIES & CONTROLS

A. General: The contractor will be allowed to set up temporary facilities and controls as outlined. All temporary facilities and controls shall be removed from the site before final acceptance of the work.

B. Temporary Utilities: The following utilities / services are available for use at the project site:

1. Electrical Power Service: Electrical power service is available from facilities at or near the project site for use on the contract without charge. Provide all connections and extensions of services in a safe manner in compliance with NEC, NEMA, and UL standards and regulations.

2. Water Service: Potable water service is available from facilities at or near the project site for use on the contract without charge. Provide all connections and extensions of services with proper backflow prevention devices in compliance with AWWA standards and local regulations

3. Sanitary Facilities: Restrooms are available at or near the project site for use on the contract without charge. Please keep toilet clean so as not to add extra work for maintenance staff.

4. Telephone Cellular Service: The project site does have cellular service, but it is spotty.

C. Temporary Office: The construction of temporary office buildings or installation of trailers will not be allowed in the park. If the contractor requires office space, the park will attempt to accommodate the contractor with an existing space for administrative work.

D. Temporary Enclosures: For uncontrolled sites, the contractor shall construct an enclosure fence, barrier, or partition to prevent people and animals from entering the project site except by gates / doors.

E. Temporary Storage: The Contractor is responsible for ensuring that all materials are new and undamaged from weather, age, or neglect. If materials appear to be used, damaged, aged, or

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 13 neglected, the Contracting Officer may request the items be replaced with new items at no additional cost to the government. Anticipated timing for delivery of manufactured items and storage, if necessary, will be discussed at the preconstruction meeting.

F. Temporary Traffic Controls: The contractor shall erect and maintain barricades, danger signals, and warning signs in accordance with the most recent edition of the Manual on Uniform Traffic Control Devices (MUTCD). The contractor shall provide adequate traffic control, including flaggers on either side of any work performed in the road. Any workers on or near the road must wear highly visible, bright clothing meeting requirements for PPE.

PART 8 – EXECUTION (SECTION 01 73 40)

8.1 EXECUTION

A. Examination: Examine the project area and site facilities and verify compatibility between existing conditions and the scope of work.

B. Preparation: Take field measurements or conduct surveys to verify quantities and dimensions before procurement and fabrication or installation.

C. Digging: Exercise caution when digging with heavy equipment. At the preconstruction meeting, consult park staff to identify any utilities that could be impacted. If identified, tone and mark for utilities in advance of digging. If a buried utility or feature is discovered, exercise extreme caution or hand dig to prevent damage to the utility or feature. If the utility or feature is damaged, repair at no additional cost to the government.

D. Installation: Install all systems or components according to the specifications, manufacturer’s recommendations, permit conditions (where applicable), and local, State, and Federal codes, standards, and regulations. All systems or components shall be complete and operable.

E. Correction of the Work: Upon discovery of defects or damage of new work or to existing facilities damaged by new work, repair or replace damaged systems or components and restore substrates and finishes.

F. Progress Cleaning: Clean the project site and work area on a daily basis. Keep site free of waste and debris in proper containment. Properly dispose of all waste and debris offsite.

G. Final Cleaning & Waste Disposal: At the completion of the work, clean all surfaces and remove all waste materials, trash, tools, equipment, machinery, and surplus items from the project site and legally dispose of all waste items.

PART 9 – CLOSEOUT PROCEDURES (SECTION 01 77 00)

9.1 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

A. When the project, or a designated portion of the project, is substantially complete, the Contractor shall request a final inspection in writing. The work is substantially complete when all major work is complete, and all project functions are operable. Upon receipt of the written request, the Contracting Officer will proceed with a final inspection within ten (10)

PINN – PMIS 285631 GENERAL REQUIREMENTS Page 14 days of receipt of request or will advise the Contractor of items that prevent the project from being considered substantially complete.

B. If the work is determined to be substantially complete at the final inspection, the Contracting Officer will prepare a Letter of Substantial Completion with a Punch List of deficiencies to be corrected before final acceptance. The Contractor shall complete the work described in the Punch List within thirty (30) calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.

C. If the work is determined to be not substantially complete, the Contracting Officer will notify the Contractor in writing. The Contractor may request a new final inspection. All re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract..

E. After all deficiencies have been corrected, closeout tasks have been completed, and the project is complete, a Letter of Final Acceptance will be issued by the Contracting Officer.

9.2 CLOSEOUT SUBMITTALS

A. Operation & Maintenance (O&M) Manual: Submit three (3) hard copies (in D-ring binders) and (3) compact disks (CDs) with all operation and maintenance information including but not limited to a preventative maintenance schedule, operating instructions, product / material cut sheets, system diagrams, as-built drawings, progress photos, product warranties, and a one

(1) year Contractor-issued warranty on all workmanship starting from the date of final acceptance.

The Contractor shall submit the O&M Manual to the Contracting Officer in PDF format along with a CM-16 transmittal form for NPS review and acceptance.

9.3 DEMONSTRATION & TRAINING

A. Demonstration & Training: Provide onsite demonstration and training to NPS operators and staff on the proper and safe operation of all new systems and components.

END OF DIVISION 01 GENERAL REQUIREMENTS

PINN – 285631

CHAPARRAL SHADE STRS

10 73 46 - 1

PREFABRICATED SITE SHELTERS

SECTION 10 73 46 - PRE-FABRICATED SITE SHELTERS

PART 1 - GENERAL

1.1 SUMMARY

A. Design, fabrication, finishing, and delivery of pre-engineered, factory-fabricated site shelters.

B. Site work related to installation by Contractor, including:

1. Unloading and temporary storage, if any.

a. Soil testing, if necessary.

b. Site preparation.

c. Column foundations, rebar, anchor bolts, and anchor embedment.

d. Concrete embedment.

e. Erection.

f. Field touch up painting of factory finishes, if necessary.

2. Site access for delivery vehicles to be provided by park.

1.2 SYSTEM DESCRIPTION

A. Design shall meet or exceed applicable building code.

B. Pre-fabricated package shall include structural steel framing members, pre-cut roof panels, trim, and fasteners.

C. All bolts shall be hidden, concealed inside the steel tubes.

D. Field labor required to install the pre-fabricated parts. Onsite welding shall not be required or permitted.

1.3 REFERENCES

A. American Society of Testing Material (ASTM)

1. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated

2. ASTM A500 - Standard Specification for Cold-Formed Welded and Seamless Carbon Steel

Structural Tubing in Rounds and Shapes

3. ASTM A563 - Standard Specification for Carbons and Alloy Steel Nuts

4. ASTM A572 - Standard Specification for High-Strength Low-Alloy Columbium-Vanadium

Structural Steel

5. ASTM F1554 – Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield

Strength

10 73 46 - 2

B. American Institute of Steel Construction (AISC)

C. American Welding Society (AWS)

D. Steel Structures Painting Council (SSPC); SSPC-SP10 - Near-White Blast Cleaning

E. Leadership in Energy and Environmental Design (LEED)

F. OSHA Standards 29 CFR, Part 1926, Subpart R (Steel Erection), Standard Number 1926.755:

Compliance requires a minimum of four anchor bolts per column.

1.4 QUALITY ASSURANCE

A. Designer Qualifications: Design under direct supervision of a Professional Engineer experienced in design of this type of work and licensed in the State where the Project is located.

B. Manufacturer Qualifications: Company experienced in design and manufacture of shelters of the type specified, and having the following:

1. Minimum five years of experience in design and fabrication of pre-fabricated steel shelters.

2. Three references of similar shelters completed within the past year.

3. Fabricator membership in American Institute of Steel Construction (AISC), requiring quality control documentation and procedures. Provide current AISC shop certification upon request.

4. All welding to be performed to AWS standards by AWS certified welders. Provide welding certification upon request.

C. Perform the work in accordance with applicable federal, State, and local building and safety codes and regulations.

1.5 SUBMITTALS

A. Shop drawings, showing all details of construction, including foundation sizes, reinforcement, and locations.

1. Provide the licensed professional engineer’s state stamp or seal on the shop drawings.

2. Provide the licensed professional engineer’s state stamp or seal on the structural calculations.

B. Selection Samples: For each finish product specified, color charts representing manufacturer's full range of available colors.

C. Warranty

1. Provide minimum five year frame warranty against manufacturer defects.

2. Provide roofing manufacturer’s limited warranty.

1.6 DELIVERY, STORAGE, AND PROTECTION

A. Package factory-finished steel components in foam, cardboard, and stretch wrap to protect the finish during transit.

10 73 46 - 3

B. Shipped knocked down for minimal shipping charges.

C. Deliver products to project site in manufacturer's protective packaging.

D. Follow shelter manufacturer's recommendations and instructions, including those printed on the shop drawings. To minimize damage during unloading, use only padded forks or non-marring slings.

E. Store products in manufacturer's unopened packaging well off the ground and covered out of weather until ready for installation.

PART 2 - PRODUCTS

2.1 GENERAL

A. Size and dimensions

1. Shape: Square, Rectangular

2. Dimensions: see drawings. Dimensions indicate design intent and may be adjusted based on standard dimensions and features of available models.

3. Roof Style: see drawings for design intent

4. Roof Pitch:

5. Eave Height: minimum 7’-6”

6. Quantity: see drawings and General Requirements

2.2 STEEL STRUCTURAL COMPONENTS

A. Structural Framing: fabricated for field assembly using bolted connections with no welding required or permitted; cold-formed shapes prohibited.

1. Columns & Beams: ASTM A500 Grade C structural steel tube. The following shapes are prohibited: I-beams, wide-flange beams, C-channels, Z-shapes.

2. Plates: ASTM A572 Grade 50.

3. Compression Ring: steel plate, ASTM A572 Grade 50.

4. Fasteners

a. Bolts: ASTM A325 high strength bolts.

b. Nuts: ASTM A563 high strength nuts.

5. Column Anchors: ASTM F1554 Grade 36, provided by Contractorpark, attached to top of foundation, recessed below slab on grade.

6. Cap plates: factory bent and field installed with hidden fasteners on hip and ridge beams not normal to roof so that metal roof deck does not bear structurally on beam corner only

7. Finish: Powder Coat

a. Pre-blast inspection to catch and remove oil, grease, and other coatings impeding contaminants

b. Steel grit blasted to near white condition in accordance with SSPC-SP10, removing all oil residue, mil scale, weld spatter, and slag

c. Five stage phosphate wash (includes detergent, phosphate, rust protectant sealant)

10 73 46 - 4

d. Epoxy powder coat primer

e. Double topcoat TGIC polyester powder coat; color to be selected from manufacturer’s standard color chart by Owner.

f. Primer plus finish coats shall be 7-12 mils thick

g. All materials inspected to meet 100% coating, proper cure, film thickness, and impact resistance

h. Wet-coat alternatives shall not be acceptable.

B. Roof System: Structural metal roof panels with exposed fasteners.

1. Acceptable Panel Profiles:

a. 1-3/16” high ribs, 12" on center.

b. 1-1/2” high ribs, 7.2" on center.

2. Panel Gauge: minimum 24-gauge.

3. Panel Width: 3'-0".

4. Panel Length: Precut to the length from the eave to the ridge; angles factory precut.

5. Panel Orientation: Ribs shall run with the pitch of the roof for proper drainage.

6. Trim: Provide matching roof trim and fasteners.

7. Finish: Factory pre-finished with Kynar 500® paint system; color to be selected by

Contracting Officer’s Representative from standard color chart.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that site earthwork has been performed as required for satisfactory installation.

3.2 PREPARATION

A. Install footings and column anchors of size, design, and location as specified by shelter manufacturer on approved shop drawings.

3.3 INSTALLATION

A. Perform installation in accordance with applicable federal, State, and local building and safety codes.

B. Structural special inspections, if required, are to be arranged and paid for by the Contractor.

C. Install shelter in accordance with manufacturer's approved shop drawing and good construction practices.

D. Install paving in accordance with shelter manufacturer's shop drawings. See Drawings for general paving dimensions. Paving dimensions shown indicate design intent and may be adjusted to fit final size of structure.

10 73 46 - 5

3.4 CLEANING AND PROTECTION

A. Clean installed work to like-new condition.

B. Protect installed products until completion of project.

C. Touch-up, repair, or replace damaged finishes before Substantial Completion. Touch up paint provided by manufacturer.

END OF SECTION

PINN – 285631 33 11 23 - 1

CHAPARRAL SHADE STRS AGGREGATE BASE COURSE

SECTION 32 11 23 - AGGREGATE BASE COURSE

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work of this section consists of furnishing and placing aggregate base material and/or lean concrete base material, and filler if required, on the prepared subgrade. Recycled asphalt concrete and Portland cement concrete which meet CDT Standard Specification Section 26, Class 2 Aggregate Base, 3/4 inch maximum, may be used as aggregate base course under new pavements.

B. Also included in the work of this section is the furnishing and placing of mineral aggregate material on roadway shoulders as specified herein and as shown on the Plans.

1.2 RELATED WORK

A. Section 01 57 23 – Temporary Storm Water Pollution Prevention Plan

B. Section 01 35 50 – Natural, Cultural and Physical Resources Protection

C. Section 31 23 00 – Site Excavation and Grading

D. Section 32 12 16 - Bituminous Concrete Pavement

1.3 DEFINITIONS

A. Standard Specifications: Wherever reference is made to "Standard Specification", it shall be interpreted to mean the Standard Specifications issued by the State of California Business and Transportation Agency, Department of Transportation (CDT), and the following shall apply:

1. In the case of conflict between the Standard Specifications and these specifications, these specifications shall govern.

2. Where the term "Engineer" is used in the Standard Specifications, it shall be understood to mean the "Contracting Officer".

3. Where the term "Special Provisions" is used in the Standard Specifications, it shall be understood to mean these specifications.

4. Where the term "State" is used in the Standard Specifications, it shall be understood to mean "Government".

5. Any provisions for measurement and payment specified in the Standard Specification shall be disregarded and the provisions of these specifications shall govern.

6. Where the term "Asphalt Concrete" is used in the Standard Specifications, it shall be understood to mean "Asphalt Paving".

PINN – 285631 33 11 23 - 2

1.4 SUBMITTALS

A. As specified in Section 01 33 23 – Submittal Procedures.

B. If materials are obtained from a commercial source, submit certification from the supplier certifying that aggregate base course meets the requirements of this section.

C. Certified weight tickets for each load of aggregate delivered to the project site.

1.5 QUALITY ASSURANCE

A. Testing required to determine compliance with the requirements for the work of this section shall be performed by an independent testing laboratory appointed and paid for by the Contractor.

B. Frequency of compaction testing shall be every 5000 square feet. The Contractor shall not proceed with work over the area being tested until results have been verified by the Contracting Officer. Immediately upon completion of each compaction test, a copy of the results shall be given by the testing laboratory to the Contracting Officer.

1. ASTM D1557-12 shall be used to determine maximum density. AASHTO T191-02, or standard nuclear method, shall be used to determine in-place density.

C. If test results indicate an area does not meet specified requirements, the Contractor shall remove defective work and replace and retest at no additional expense to the Government.

PART 2 - PRODUCTS

2.1 COMMERCIAL AGGREGATE BASE COURSE

A. Class 2 Aggregate Base, 3/4-inch maximum; as per Section 26-1.02 A, CDT Standard Specifications.

2.2 AGGREGATE BASE COURSE FROM RECYCLED ASPHALT CONCRETE AND

PORTLAND CEMENT CONCRETE

A. Recycled aggregate base course material must meet CDT Standard Specification, Section 26, Class 2, 3/4 inch maximum aggregate base requirements. See Section 02 41 00: Demolition. This material shall not contain any metal rebar.

2.3 WATER

A. As specified in Section 31 23 16: Structural Excavation and Backfilling.

B. At the time aggregate base is spread, it shall have a moisture content sufficient to obtain the required compaction. Such moisture shall be uniformly distributed throughout the material.

PINN – 285631 33 11 23 - 3

PART 3 - EXECUTION

3.1 ROADWAY SHOULDER AGGREGATE

A. The requirements of part three of this Section shall apply to the placement of Roadway Shoulder aggregate with the exception that compaction will not be required.

1. Place to grades and depth as shown on the Plans.

2. Grade tolerance shall be ± 0.1 foot.

3.2 SUBGRADE PREPARATION

A. As specified in Section 31 23 00: Site Excavation and Grading.

B. The subgrade shall be re-compacted as detailed in paragraph 3.6.

3.3 SPREADING

A. The aggregate base course material shall be deposited and spread to the required compacted thickness by means that will maintain the uniformity of the mixture. The aggregate base course shall be free from pockets of coarse or fine material.

3.4 PLACING

A. If the required compacted depth of the aggregate base course exceeds 6 inches, place course in two or more layers of approximately equal thickness. The maximum compacted thickness of any one layer shall not exceed 6 inches.

3.5 MIXING

A. Mix the aggregate by any one of the three following methods.

1. Stationary Plant Method: Mix aggregate base course material and appropriate amount of water for compaction in an approved mixer. After mixing, transport aggregate to the job site while it contains the proper moisture content and place on the roadbed with an approved aggregate spreader. If necessary, before compaction, remove excess moisture by approved means.

2. Travel Plant Method: After the material for each layer has been placed through an aggregate spreader or windrow-sizing device, it shall be uniformly mixed by a…