B08_-_Atch_2_-_GRBA_BC_Drawings.pdf
PDF 28 MB Posted
- Attached to
- 8420B0018-BRISTLECOME & SUMMIT WORK Federal contract opportunity
- Solicitation number
- 140P8124B0001
About this file
This document is a set of drawings titled "GRBA BC Drawings" related to Solicitation Number 140P8124B0001 for the "8420B0018-BRISTLECOME & SUMMIT WORK" federal contract opportunity. The solicitation is issued by the Department of the Interior National Park Service Pacific West Region to UPGRADE the BRISTLECONE PARKING AREA. The drawings provide details on the construction and design specifications for this parking area upgrade project. No other high-level details about the solicitation requirements, response dates, award information, or pricing terms are provided in this specific document. This appears to be an appendix or attachment containing only the technical drawings, rather than the full solicitation package.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8124B0001_Amd_0001.pdf | ||
| Sol_140P8124B0001.pdf | ||
| B08_-_Atch_4_-_Wage_Determination_NV20240021.pdf | ||
| B08_-_Atch_7_-_Price_Schedule.docx | DOCX document | |
| B08_-_Atch_1_-_GRBA311170_FinalSpecs.pdf | ||
| B08_-_Atch_6_-_Construction_Contraction_Administration.pdf | ||
| B08_-_Atch_3_-_GRBA_311170_BC_ProjectForms-EXTERNAL.pdf | ||
| B08_-_Atch_5_-_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/3 1/2
2 1 5:4
1 E
AN
DE
RS
ON
R
P
:\D
EN
VE
R\
NP
S
GR
BA
LO
W
ER
LE
HM
AN
_B
RI
ST
LE
CO
NE
-1
\9_
FI
NA
L_
CD
\C
AD
\B C\
LA
\L0
-1 _G
RB
A_
BC
_IN
DE
X.
DW
G
XR
EF
S:
BA
SE
S\
XL
-T
IT
LE
IN
FO
-B
C.
DW
G;
S
WV
WV
IM
AG
ES
\Im ag es \A cc es sib ilit y\3
.3.
gif
|30 4.3
.2.
gif
|30 7.3
.gi f|4
.5.
1.g if|4
.5.
2.g if|5
.2.
gif |50
2.3 .gi f|5
.5.
gif
|P :\D en ve r\N
PS
G
ET
T
LR
T-
8\7
_C D\
CA
D\
IM
AG
ES
\A cc es sib ilit y\3
.3.
gif
|30 5.5
.gi f|t-sh ap ed
.JP
G| 7/1
1/2 2 0
7:2 2 E
AN
DE
RS
ON
R
P :\D
EN
VE
R\
NP
S
GR
BA
LO
W
ER
LE
HM
AN
_B
RI
ST
LE
CO
NE
-1
\8_
DR
AF
T_
FI
NA
L_
CD
\C
AD
\B C\
LA
\G
2- 0-
GR
BA
-B C-
SI
TE
AC
CE
SS
IB
ILI
TY
.D W
G
XR
EF
S:
BA
SE
S\
XL
-T
IT
LE
IN
FO
-B C.
8/3 1/2
2 1 5:4
4 E
AN
DE
RS
ON
R
P
:\D
EN
VE
R\
NP
S
GR
BA
LO
W
ER
LE
HM
AN
_B
RI
ST
LE
CO
NE
-1
\9_
FI
NA
L_
CD
\C
AD
\B C\
LA
\G
3- 0-
GR
BA
-B C-
ST
AG
IN
G.
DW
G
XR
EF
S:
BA
SE
S\
XL
-T
IT
LE
IN
FO
-B
C.
DW
G;
BA
SE
S\
XL
-B C-
ST
AG
IN
G.
” " " PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
Exp: 12/31/23
09/15/2022
PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
WV
WV
WV
” " " PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
” " " PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
SS
W V
W V
W V
YARD HYDRANT
RE:DETAILS
1" CURB STOP
END HORIZONTAL
BEND
START HORIZONTAL
BEND
END HORIZONTAL
BEND
START HORIZONTAL
BEND
END HORIZONTAL
BEND
START HORIZONTAL
BEND
END HORIZONTAL
BENDSTART HORIZONTAL
BEND
END HORIZONTAL
BEND
START HORIZONTAL BEND
END HORIZONTAL BEND
START HORIZONTAL
BEND
WATER SERVICE CONNECTION
1" C
U R
B
ST
O P
C O
N N
EC
T
TO
E
XI
ST
IN
G
V
AL
VE
EN
D
H O
R
IZ
O N
TA
L
BE
N
D
ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
EN
D
H O
R
IZ
O N
TA
L
BE
N
D
ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
EN
D
H O
R
IZ
O N
TA
L
BE
N
D
ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
EN
D
H O
R
IZ
O N
TA
L
BE
N
D ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
EN
D
H O
R
IZ
O N
TA
L
BE
N
D
YA
R
D H
YD
R
AN
T
EN
D
H O
R
IZ
O N
TA
L
BE
N
D
ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
ST
AR
T H
O R
IZ
O
N
TA
L
BE
N D
PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
WV
18" FES W/CUT OFF WALL
STORM INLET EXTENSION
C O
N N
EC
T
TO
EX
IS
TI
N G
S
TO
R M
O U
TL
ET
" F
ES
PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
W V
W V
18" FES W/CUT OFF WALL
18" FES W/CUT OFF WALL
CULVERT 1
PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
WV
WV
WV
” " " PRO
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
WV
WV
WV
WV
WV
FES
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
STRUCTURAL GENERAL NOTES
DESIGN LOADS:
1. AUTHORITY HAVING JURISDICTION: UNITED STATES GOVERNMENT
2. DESIGN LOADS BASED ON: 2021 INTERNATIONAL BUILDING CODE, ASCE 7-16, AND REFERENCED DOCUMENTS
3. RISK CATEGORY: II STANDARD
4. ROOF LOADS
A. ROOF DEAD LOAD 10 PSF
B. GROUND SNOW LOAD, Pg 191 PSF (PER WHITE PINE COUNTY, NV BUILDING DEPARTMENT) C. FLAT-ROOF SNOW LOAD, Pf 160 PSF D. SNOW EXPOSURE FACTOR, Ce 0.9 E. SNOW IMPORTANCE FACTOR, Is 1.0 F. THERMAL FACTOR, Ct 1.0
5. FLOOR LIVE LOADS:
6. WIND:
A. BASIC DESIGN WIND SPEED, VULT, (3-SEC GUST) 115 MPH
B. ALLOWABLE STRESS DESIGN WIND SPEED, VASD, (3-SEC GUST) 89 MPH
7. SEISMIC:
A. SPECTRAL RESPONSE ACCELERATION PARAMETERS
1. SHORT PERIOD
a. SS 0.226 g
b. SDS 0.271 g
2. ONE SECOND
a. S1 0.073 g
b. SD1 0.123 g
B. SOILS SITE CLASS C
C. SEISMIC IMPORTANCE FACTOR 1.0
D. SEISMIC DESIGN CATEGORY B
FOUNDATION DESIGN:
1. REFER TO GEOTECHNICAL EVALUATION NO 299-348 BY YEH AND ASSOCIATES INC, DATED APRIL 14, 2022.
2. GEOTECHNICAL ENGINEER OR SPECIAL INSPECTOR (EMPLOYED BY THE CONTRACTOR) SHALL VERIFY SOIL CONDITIONS AND TYPES
DURING EXCAVATION AND PRIOR TO PLACEMENT OF FORMWORK OR CONCRETE.
3. MINIMUM FROST DEPTH SHALL BE 3'-0" BELOW EXTERIOR GRADE.
FOOTINGS:
1. DESIGN OF FOOTINGS IS BASED ON
A. MAXIMUM ALLOWABLE BEARING PRESSURE 3,000 PSF
2. BEAR ON 8" MINIMUM DEPTH OF PROPERLY COMPACTED ENGINEERED FILL, EXTERIOR FOOTINGS SHALL BEAR BELOW 36" FROST DEPTH.
EARTH RETAINING STRUCTURES:
1. EARTH EQUIVALENT FLUID LATERAL PRESSURE:
A. WALLS RESTRAINED AT TOP (AT REST) 65 PCF
B. CANTILEVERED WALLS (ACTIVE) 36 PCF
2. COEFFICIENT OF SLIDING FRICTION 0.45
REINFORCED CONCRETE:
1. DESIGN IS BASED ON ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE."
2. CONCRETE WORK SHALL CONFORM TO ACI 301 "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE."
3. STRUCTURAL CONCRETE SHALL HAVE THE FOLLOWING PROPERTIES:
4. CONCRETE MIX TABLE NOTES:
A. SLUMP VALUES INDICATED ARE SUGGESTED BASED ON USE AND TYPICAL PLACEMENT METHODS. CONTRACTOR MAY ADJUST
SLUMP AS NECESSARY FOR FIELD CONDITIONS AND INSTALLATION METHOD USED PROVIDED REMAINING REQUIREMENTS ARE MET.
B. AIR CONTENT:
a. N/P: AIR ENTRAINING ADMIXTURES NOT PERMITTED, ENTRAPPED AIR ONLY
b. N/A: NOT APPLICABLE, NO STRUCTURAL AIR CONTENT REQUIREMENTS
5. DETAILING, FABRICATION, AND PLACEMENT OF REINFORCING STEEL SHALL BE IN ACCORDANCE WITH ACI 315 "DETAILS AND DETAILING OF
CONCRETE REINFORCEMENT."
6. REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT #3 OR #4 TIES OR BARS OPTED TO BE FIELD-BENT SHALL BE GRADE 40.
7. UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS, LAP BARS PER THE CONCRETE LAP SPLICE SCHEDULE.
8. AT CORNERS AND INTERSECTIONS, MAKE HORIZONTAL BARS CONTINUOUS OR PROVIDE MATCHING CORNER BARS FOR EACH LAYER OF
REINFORCEMENT.
9. TRIM OPENINGS IN WALLS AND SLABS WITH (2)-#5 FOR EACH LAYER OF REINFORCEMENT, FULLY DEVELOPED BY EXTENSION OR HOOK.
10. FORM INTERMITTENT SHEAR KEYS AT ALL CONSTRUCTION JOINTS AND AS SHOWN ON THE STRUCTURAL DRAWINGS.
11. EXCEPT AS NOTED ON THE DRAWINGS, CONCRETE PROTECTION FOR REINFORCEMENT IN CAST-IN-PLACE CONCRETE SHALL BE AS
FOLLOWS:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
1. EXPOSED TO EARTH OR WEATHER:
a. #6 THROUGH #18 BARS 2"
b. #5 BAR, W31 OR D31 WIRE, AND SMALLER 1-1/2"
B. NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
1. SLABS, WALLS, JOISTS: #11 BARS AND SMALLER 3/4"
2. BEAMS AND COLUMNS:
a. PRIMARY REINFORCEMENT 1-1/2"
b. STIRRUPS, TIES, SPIRALS 1-1/2"
12. ANCHOR BOLTS AND RODS FOR BEAM AND COLUMN-BEARING PLATES SHALL BE PLACED WITH SETTING TEMPLATES.
POST-INSTALLED ANCHORS
1. ALL CAST IN PLACE ANCHORS DESIGNED IN ACCORDANCE WITH ACI 318.
2. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL
OBTAIN APPROVAL FROM THE CONTRACTING OFFICER PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR
MISPLACED CAST-IN-PLACE ANCHORS.
3. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH EXISTING REBAR. EXISTING REINFORCING BARS
SHALL NOT BE CUT UNLESS APPROVED BY THE CONTRACTING OFFICER.
4. ALL ANCHORS MUST BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTALLATION INFORMATION (MPII) IN CONJUNCTION WITH EDGE DISTANCE, SPACING, AND EMBEDMENT DEPTH AS INDICATED ON THE DRAWINGS. HOLES SHALL BE DRILLED AND
CLEANED IN ACCORDANCE WITH THE MPII.
5. SUBSTITUTION REQUESTS, FOR PRODUCTS OTHER THAN THOSE SPECIFIED, SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CONTRACTING OFFICER ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER;
REGISTRATION MUST BE IN THE STATE IN WHICH THE PROJECT IS LOCATED. THE CALCULATIONS SHALL DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
6. THE CONTRACTOR SHALL ARRANGE FOR A MANUFACTURER'S FIELD REPRESENTATIVE TO PROVIDE INSTALLATION TRAINING FOR ALL PRODUCTS TO BE USED, PRIOR TO THE ANCHOR INSTALLATION. A RECORD OF TRAINING SHALL BE KEPT ON SITE AND MADE AVAILABLE TO
THE CONTRACTING OFFICER/ SPECIAL INSPECTOR AS REQUESTED.
7. ADHESIVE ANCHORS INSTALLED IN HORIZONTAL TO VERTICALLY OVERHEAD ORIENTATION THAT SUPPORT SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ANCHOR INSTALLER (AAI) AS CERTIFIED THROUGH ACI/CRSI (ACI 318 17.8.2.2). PROOF OF CURRENT CERTIFICATION SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO COMMENCEMENT OF INSTALLATION.
8. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21 DAYS (ACI 318 17.1.2)
9. ALL POST INSTALLED ANCHORS SHALL BE INSTALLED IN DRY HOLES THAT HAVE BEEN DRILLED, CLEANED, AND PREPARED IN STRICT
ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTALLATION INFORMATION AND THE RESPECTIVE ICC-ES EVALUATION REPORTS.
10. PROVIDE SPECIAL INSPECTION (EMPLOYED BY THE CONTRACTOR) FOR ALL MECHANICAL AND ADHESIVE ANCHORS PER THE APPLICABLE
BUILDING CODE AND PER THE CURRENT ICC-ES REPORT (IBC TABLE 1705.3 NOTE B).
11. ALL PRODUCTS SHALL CONFORM TO THE "BUY AMERICA ACT".
CORROSION CONTROL:
1. ALL STEEL MEMBERS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVANIZED PER ASTM A123 UNLESS SPECIFICALLY NOTED
AS "SELF-WEATHERING".
2. FASTENERS AND HARDWARE EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVANIZED PER ASTM A153 OR ASTM B695 CLASS 50
UNLESS SPECIFICALLY NOTED AS "SELF-WEATHERING". STAINLESS STEEL FASTENERS AND HARDWARE MAY ALSO BE USED IN
LIEU OF HOT DIPPED GALVANIZED.
3. ALL FIELD CUT OR DAMAGED SURFACES AND FIELD WELDED AREAS AT GALVANIZED CONSTRUCTION SHALL BE REPAIRED WITH (2)
COATS OF A 95% ZINC RICH PAINT PER ASTM A780 (ZRC PREFERRED).
4. WHERE NOTED AS ' * ', BID OPTION 6: STEEL MEMBERS AND ALL CONNECTING PLATES AND BOLTS SHALL BE "SELF-WEATHERING":
A. WIDE FLANGE BEAMS SHALL BE ASTM ASTM A588, 50 KSI YIELD.
B. PLATES SHALL BE ASTM A588, 50 KSI YIELD.
C. HSS RECTANGULAR SHAPES SHALL BE ASTM A847, 50 KSI YIELD.
D. BOLTS SHALL BE GRADE A325 TYPE 3.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF9/
/2
2:
:3
P
M C
:\U se rs \C
LB
\D oc um en ts
\2
B
C -C en tr al S
_c hr is tin eb rit to n.
rv t
S0.1
TSS
RECREATION AREA + TRAILHEAD
GREAT BASIN NATIONAL PARK, NV
177607
311170
LB/DJM
LAC
09.19.2022 32 43
BID OPTION A, CLIN #2
UPPER BC PARKING
GENERAL NOTES
UPGRADE AND IMPROVE THE BRISTLECONE
OCCUPANCY OR USE UNIFORMLY DISTRIBUTED (PSF)
BOARDWALK 100
INTENDED USE
EXPOSURE
CLASS
f'c, PSI
DAYS
MAX
W/CM
RATIO
MAXIMUM
AGGREGATE
SLUMP,
INCHES
(±1")
AIR CONTENT
PERCENT
(±1.5%)
CEMENT
TYPE ADMIXTURES / COMMENTS
FOOTINGS & STEM WALLS F3-S0-W0-C2 5000 .4 3/4" STONE 4 6% I/II 15% MIN, 25% MAX FLY ASH, MAX WATER-SOLUBLE
CHLORIDE ION CONTENT
0.15 % BY WEIGHT OF
CEMENT
CONCRETE POST INSTALLED ANCHORS
ANCHOR TYPE DEWALT HILTI SIMPSON
EXPANSION POWER-STUD+ SD2 (ICC ESR-2502) KWIK BOLT TZ (ICC ESR-1917) STRONG-BOLT 2 (ICC ESR-3037)
CONCRETE SCREW SCREW-BOLT+ (ICC ESR 3889) KWIK HUS-EZ (ICC ESR-3027) TITEN HD (ICC ESR 2713)
ADHESIVE AC200+ (ICC ESR-4027) HIT-HY 200 (ICC ESR-3187) AT-XP (UES ER-263)
MASONRY POST INSTALLED ANCHORS
ANCHOR TYPE DEWALT HILTI SIMPSON
EXPANSION POWER-STUD+ SD1 (ICC ESR-2966) KWIK BOLT 3 (ICC ESR-1385) WEDGE-ALL (ICC ESR-1396)
SCREW SCREW-BOLT+ (ICC ESR-4042) HUS-EZ (ICC ESR-3056) TITEN HD (ICC ESR-1056)
ADHESIVE AC100+ GOLD (ICC ESR-3200) HIT HY-270 (ICC ESR-4143 / 4144) AT-XP (UES ER-281)
STRUCTURAL DRAWING LIST
S0.1 BID OPTION A, CLIN #2 UPPER BC PARKING GENERAL NOTES
S0.2 BID OPTION A, CLIN #2 UPPER BC PARKING GENERAL NOTES
S0.3 BID OPTION A, CLIN #2 UPPER BC PARKING STR ABREV & SYMBOLS
S2.1 BID OPTION A, CLIN #2 UPPER BC PARKING RETAINING WALL
BID OPTION
SHOP DRAWINGS:
1. THE CONSTRUCTION DRAWINGS ARE COPYRIGHTED AND SHALL NOT BE COPIED FOR USE AS ERECTION PLANS OR SHOP DETAILS. USE
OF THE GOVERNMENT'S ELECTRONIC FILES AS THE BASIS FOR SHOP DRAWINGS REQUIRES PRIOR APPROVAL BY THE CONTRACTING OFFICER, A SIGNED RELEASE OF LIABILITY BY THE GENERAL CONTRACTOR AND/OR HIS SUBCONTRACTORS, AND DELETION OF THE
TITLEBLOCK FROM ALL SHEETS TO BE USED.
2. THE GENERAL CONTRACTOR SHALL SUBMIT IN WRITING ANY REQUESTS TO MODIFY THE CONSTRUCTION DRAWINGS OR PROJECT
SPECIFICATIONS.
3. ALL SHOP AND ERECTION DRAWINGS SHALL BE CHECKED AND STAMPED (AFTER HAVING BEEN CHECKED) BY THE GENERAL CONTRACTOR PRIOR TO SUBMISSION FOR THE CONTRACTING OFFICER'S REVIEW; SHOP DRAWING SUBMITTALS NOT CHECKED BY THE GENERAL CONTRACTOR PRIOR TO SUBMISSION TO THE CONTRACTING OFFICER WILL BE RETURNED WITHOUT REVIEW.
4. FURNISH ELECTRONIC VERSION (PDF) OF SHOP AND ERECTION DRAWINGS TO THE CONTRACTING OFFICER FOR REVIEW PRIOR TO
FABRICATION FOR:
A. CONCRETE MIX DESIGNS
B. CONCRETE REINFORCING STEEL
5. SUBMIT IN A TIMELY MANNER TO PERMIT 10 WORKING DAYS FOR REVIEW BY THE CONTRACTING OFFICER.
6. SHOP DRAWINGS SUBMITTED FOR REVIEW DO NOT CONSTITUTE "REQUEST FOR CHANGE IN WRITING" UNLESS SPECIFIC SUGGESTED
CHANGES ARE CLEARLY MARKED. IN ANY EVENT, CHANGES MADE BY MEANS OF THE SHOP DRAWING SUBMITTAL PROCESS BECOME
THE RESPONSIBILITY OF THE ONE INITIATING THE CHANGE.
STRUCTURAL ERECTION AND BRACING REQUIREMENTS:
1. THE CONSTRUCTION DRAWINGS ILLUSTRATE AND DESCRIBE THE COMPLETED STRUCTURE WITH ELEMENTS IN THEIR FINAL POSITIONS, PROPERLY SUPPORTED, CONNECTED, AND/OR BRACED.
2. THE CONSTRUCTION DRAWINGS ILLUSTRATE TYPICAL AND REPRESENTATIVE DETAILS TO ASSIST THE GENERAL CONTRACTOR. DETAILS
SHOWN APPLY AT ALL SIMILAR CONDITIONS UNLESS OTHERWISE INDICATED. ALTHOUGH DUE DILIGENCE HAS BEEN APPLIED TO MAKE THE DRAWINGS AS COMPLETE AS POSSIBLE, NOT EVERY DETAIL IS ILLUSTRATED AND NOT EVERY EXCEPTIONAL CONDITION IS
ADDRESSED.
3. ALL PROPRIETARY CONNECTIONS AND ELEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS'
RECOMMENDATIONS.
4. ALL WORK SHALL BE ACCOMPLISHED IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE APPLICABLE CODES AND LOCAL
ORDINANCES.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL WORK, INCLUDING LAYOUT AND DIMENSION VERIFICATION, MATERIALS COORDINATION, SHOP DRAWING REVIEW, AND THE WORK OF SUBCONTRACTORS. ANY DISCREPANCIES OR OMISSIONS DISCOVERED IN THE COURSE OF THE WORK SHALL BE IMMEDIATELY REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
6. CONTINUATION OF WORK WITHOUT NOTIFICATION OF DISCREPANCIES RELIEVES THE CONTRACTING OFFICER FROM ALL
CONSEQUENCES.
7. UNLESS OTHERWISE SPECIFICALLY INDICATED, THE CONSTRUCTION DRAWINGS DO NOT DESCRIBE METHODS OF CONSTRUCTION.
8. THE GENERAL CONTRACTOR, IN THE PROPER SEQUENCE, SHALL PERFORM OR SUPERVISE ALL WORK NECESSARY TO ACHIEVE THE FINAL
COMPLETED STRUCTURE, AND TO PROTECT THE STRUCTURE, WORKMEN, AND OTHERS DURING CONSTRUCTION. SUCH WORK SHALL INCLUDE, BUT NOT BE LIMITED TO TEMPORARY BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR EXCAVATION, FORMWORK, SCAFFOLDING, SAFETY DEVICES AND PROGRAMS OF ALL KINDS, SUPPORT AND BRACING FOR CRANES AND OTHER
ERECTION EQUIPMENT.
9. DO NOT BACKFILL AGAINST RETAINING WALLS UNTIL SUPPORTING SLABS AND FLOOR FRAMING ARE IN PLACE AND SECURELY ANCHORED, UNLESS ADEQUATE TEMPORARY BRACING IS PROVIDED.
10. TEMPORARY BRACING SHALL REMAIN IN PLACE UNTIL ALL FLOORS, WALLS, ROOFS AND ANY OTHER SUPPORTING ELEMENTS ARE IN
PLACE.
11. THE CONTRACTING OFFICER BEARS NO RESPONSIBILITY FOR THE ABOVE ITEMS, AND OBSERVATION VISITS TO THE SITE DO NOT IN ANY
WAY INCLUDE INSPECTIONS OF THESE ITEMS.
PRECAUTIONARY NOTES ON STRUCTURAL BEHAVIOR:
1. INTERIOR ARCHITECTURAL FINISH DETAILING MUST ACCOMMODATE THE RELATIVE DIFFERENTIAL MOVEMENTS OF SUPPORTING
STRUCTURAL ELEMENTS.
2. WHERE THE ROOF FRAMING ELEMENT SPANS ARE LONG, APPLIED LOADING WILL NATURALLY CAUSE SUBSTANTIAL DEFLECTION.
INTERIOR ELEMENTS HUNG FROM THE ROOF STRUCTURE WILL DEFLECT WITH THE ROOF.
3. THE FLOOR IS A FLOATING CONCRETE SLAB-ON-GRADE AND MAY EXPERIENCE MOVEMENTS INDEPENDENT OF THE STRUCTURAL
FOUNDATIONS. INTERIOR ELEMENTS SUPPORTED ON THE SLAB-ON-GRADE FLOOR WILL MOVE WITH THE FLOOR. INTERIOR ELEMENTS SUPPORTED ON FOUNDATIONS AND COLUMNS WILL NOT EXPERIENCE SIMILAR OR MEASURABLE MOVEMENTS.
4. EXTERIOR/PERIMETER WALL ASSEMBLIES HUNG FROM THE EDGE OF THE BUILDING STRUCTURE WILL BE DIRECTLY AFFECTED (TO SOME
DEGREE) BY CHANGES IN EXTERNAL TEMPERATURE AND FLOOR DEFLECTION.
5. EXTERIOR/PERIMETER AND INTERIOR ARCHITECTURAL FINISH DETAILS SHOULD ALLOW FOR RELATIVE MOVEMENTS BETWEEN
ELEMENTS WITH DIFFERENT SUPPORT CONDITIONS.
SPECIAL INSPECTIONS:
1. FOR THE DETAILED LIST OF REQUIRED INSPECTIONS, REFER TO THE "STATEMENT OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS"
REFERENCED IN SECTION 01 40 00 QUALITY REQUIREMENTS OF THE SPECIFICATIONS. THE FOLLOWING SPECIAL INSPECTIONS AND TESTING LIST IS SHOWN HERE FOR REFERENCE ONLY AND SHALL BE PERFORMED BY A QUALIFIED SPECIAL INSPECTOR, EMPLOYED BY
THE CONTRACTOR, IN ACCORDANCE WITH CHAPTER 17 OF THE IBC:
A. SECTION 1704 SPECIAL INSPECTIONS, CONTRACTOR RESPONSIBILITY, AND STRUCTURAL OBSERVATIONS AND THE
FOLLOWING SUB-SECTIONS:
1. 1704.2 SPECIAL INSPECTIONS AND TESTS
2. 1704.3 STATEMENT OF SPECIAL INSPECTIONS
B. SECTION 1705 REQUIRED VERIFICATION AND INSPECTION AND THE FOLLOWING SUB-SECTIONS:
1. 1705.3 CONCRETE CONSTRUCTION
2. 1705.6 SOILS
2. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE CONTRACTING OFFICER, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION. THE APPROVED INSPECTOR MUST BE INDEPENDENT FROM THE CONTRACTOR RESPONSIBLE FOR THE WORK BEING
INSPECTED.
3. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR SHALL BE TO INSPECT AND/OR TEST THE WORK OUTLINED ABOVE AND WITHIN THE STATEMENT OF SPECIAL INSPECTIONS IN ACCORDANCE WITH CHAPTER 17 OF THE IBC FOR CONFORMANCE WITH THE
APPROVED CONSTRUCTION DOCUMENTS.
4. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER FOR CORRECTION.
5. PER SECTION 1704.2.4 THE SPECIAL INSPECTOR SHALL FURNISH REGULAR REPORTS TO THE CONTRACTING OFFICER. PROGRESS
REPORTS FOR CONTINUOUS INSPECTION SHALL BE FURNISHED WEEKLY. INDIVIDUAL REPORTS OF PERIODIC INSPECTIONS SHALL BE FURNISHED WITHIN ONE WEEK OF INSPECTION DATES. THE REPORTS SHALL NOTE UNCORRECTED DEFICIENCIES, CORRECTION OF PREVIOUSLY REPORTED DEFICIENCIES, AND CHANGES TO THE APPROVED CONSTRUCTION DOCUMENTS AUTHORIZED BY THE
CONTRACTING OFFICER.
6. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT WITHIN 10 DAYS OF THE FINAL SPECIAL INSPECTION STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE, IN CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE IBC. WORK NOT IN
COMPLIANCE SHALL BE NOTED IN THE REPORT.
7. THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE CONTRACTING OFFICER PRIOR TO THE COMMENCEMENT OF WORK ON A MAIN WIND- OR SEISMIC-FORCE-RESISTING SYSTEM PER SECTION 1704.4. THE STATEMENT SHALL ACKNOWLEDGE THE AWARENESS OF THE SPECIAL LISTED REQUIREMENTS OF DESIGNATED SEISMIC SYSTEM OR A WIND- OR SEISMIC-
RESISTING COMPONENT IN THE STATEMENT OF SPECIAL INSPECTIONS PER SECTION 1705.
8. EXCEPT AS NOTED, THE SPECIAL INSPECTIONS OUTLINED ABOVE ARE IN ADDITION TO, AND BEYOND THE SCOPE OF, PERIODIC
STRUCTURAL OBSERVATIONS AS DEFINED IN SECTION 1704.5.
STRUCTURAL WOOD FRAMING:
1. IN-GRADE BASE VALUES HAVE BEEN USED FOR DESIGN.
2. DIMENSIONAL LUMBER FRAMING DECKING SHALL BE S4S DOUGLAS FIR-LARCH NO. 1 OR BETTER UNO.
3. SOLID TIMBER BEAMS AND POSTS SHALL BE DOUGLAS FIR-LARCH NO. 1 OR BETTER UNO.
4. ALL LUMBER SHALL BE 19% MAXIMUM MOISTURE CONTENT AT THE TIME OF INSTALLATION.
5. ALL WOOD EXPOSED TO WEATHER OR IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED DOUGLAS FIR-LARCH.
PRESERVATIVE-TREATED WOOD SHALL BE TREATED IN ACCORDANCE WITH AWPA STANDARDS U1 AND M4. TREATMENTS SHALL HAVE NO
AMMONIA ADDED AND SHALL HAVE THE FOLLOWING USE CATEGORY:
A. UC3B AT EXTERIOR WITH NO GROUND CONTACT
B. UC4B AT EXTERIOR WITH GROUND CONTACT
6. FASTENERS FOR USE WITH TREATED WOOD SHALL BE CORROSION RESISTANT IN ACCORDANCE WITH SECTION 2304.10.5 OF THE IBC.
7. ALL CONNECTORS USED WITH PRESSURE-TREATED MATERIAL SHALL BE STAINLESS STEEL ASTM 304 OR 316, OR HAVE A SIMPSON Z-MAX
(G185) OR HDG COATING. STANDARD COATING (G90) IS ACCEPTABLE AT INTERIOR CONDITIONS WITH NON PRESSURE-TREATED LUMBER
ONLY. CONNECTORS ARE TO BE IN ACCORDANCE WITH ASTM A653 OR ASTM 123.
8. ALL IRON AND STEEL PRODUCTS ATTACHED TO TREATED LUMBER SHALL BE HOT-DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A123
OR SHALL BE TYPE 304 OR 316 STAINLESS STEEL.
9. ALL BOLTS SHALL BE RE-TIGHTENED PRIOR TO CLOSING IN OF WALLS, FLOORS, AND ROOFS.
10. ALL BOLTS BEARING ON WOOD SHALL HAVE STANDARD CUT WASHERS UNDER HEAD AND/OR NUT, UNO.
11. METAL FRAMING ANCHORS SHOWN OR REQUIRED, SHALL BE SIMPSON STRONG-TIE OR EQUAL CODE APPROVED CONNECTORS AND
INSTALLED WITH ALL HOLES FILLED (ROUND AND TRIANGULAR) WITH THE MAXIMUM SIZE NAIL RECOMMENDED BY THE MANUFACTURER TO
DEVELOP THE MAXIMUM RATED CAPACITY.
12. CONNECTOR BOLTS AND LAG SCREWS SHALL CONFORM TO ASTM A307, GRADE A AND ANSI/ASME B18.2.1.
13. NAILS AND SPIKES SHALL CONFORM TO ASTM F1667.
14. WOOD SCREWS SHALL CONFORM TO ANSI/ASME B18.6.1.
15. LEAD HOLES FOR LAG SCREWS SHALL BE 40%-70% OF THE SHANK DIAMETER AT THE THREADED SECTION AND EQUAL TO THE SHANK
DIAMETER AT THE UNTHREADED SECTION.
16. ALL JOISTS AND BEAMS (EXCLUDING I-JOISTS) SHALL BE SEAT-CUT FOR FULL UNIFORM BEARING AT SUPPORTS, SEATS, CAPS, ETC.
17. EXCEPT AS NOTED OTHERWISE, MINIMUM NAILING SHALL BE PROVIDED AS SPECIFIED IN TABLE 2304.10.1 "FASTENING SCHEDULE" OF THE
IBC.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF9/
/2
2:
:3
P
M C
:\U se rs \C
LB
\D oc um en ts
\2
B
C -C en tr al S
_c hr is tin eb rit to n.
rv t
S0.2
TSS
RECREATION AREA + TRAILHEAD
GREAT BASIN NATIONAL PARK, NV
177607
311170
LB/DJM
LAC
09.19.2022 33 43
BID OPTION A, CLIN #2
UPPER BC PARKING
GENERAL NOTES
UPGRADE AND IMPROVE THE BRISTLECONE
X
DIRECTION OF DECK SPAN
REVISION
SHORING
CIP CONCRETE
EXISTING CONCRETE
EARTH
SYMBOLS KEY
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF9/
/2
2:
:3
P
M C
:\U se rs \C
LB
\D oc um en ts
\2
B
C -C en tr al S
_c hr is tin eb rit to n.
rv t
S0.3
TSS
RECREATION AREA + TRAILHEAD
GREAT BASIN NATIONAL PARK, NV
177607
311170
LB/DJM
LAC
09.19.2022 34 43
BID OPTION A, CLIN #2
UPPER BC PARKING
STR ABREV & SYMBOLS
UPGRADE AND IMPROVE THE BRISTLECONE
STRUCT STRUCTURE, -AL
SUPT SUPPORT
SY SQUARE YARD
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TOUNGE AND GROOVE
TB TOP OF BEAM
TC TOP OF CONCRETE
TCA TORQUE-CONTROLLED ANCHOR
TD TOP OF DECK
THD THREAD
THK THICK, -NESS
TJ TOP OF JOIST
TL TOTAL LOAD
TPG TOPPING
TRANS TRANSVERSE
TW TOP OF WALL
TYP TYPICAL
ULT ULTIMATE
UNO UNLESS OTHERWISE NOTED
VERT VERTICAL
VIF VERIFY IN FIELD
WP WORK POINT
WT WEIGHT
WTS WELDED THREADED STUD
WWF WELDED WIRE FABRIC
XS EXTRA STRONG
XSECT CROSS SECTION
XXS DOUBLE EXTRA STRONG
PC PRECAST
PCF POUNDS PER CUBIC FOOT
PE PRE-ENGINEERED
PEN PENETRATION
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUND PER LINEAR FOOT
PNL PANEL
PP PANEL POINT
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT POST TENSIONED, PRESSURE TREATED
PTN PARTITION
PWD PLYWOOD
QTY QUANTITY
R RADIUS
RE REFERENCE, REFER TO
RECT RECTANGLE
REINF REINFORCE, -ED, -ING
REQ REQUIRED
REQMT REQUIREMENT
RET RETAINING
RM ROOM
RMO ROUGH MASONRY OPENING
RO ROUGH OPENING
SC SLIP-CRITICAL
SCH SCHEDULE
SDST SELF-DRILLING/SELF-TAPPING
SECT SECTION
SF SQUARE FEET, SUB-FLOOR
SFRS SEISMIC FORCE-RESISTING SYSTEM
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SLH SHORT LEG HORIZONTAL
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SP SPACES, SPACED
SPEC SPECIFICATIONS
SQ SQUARE
SSR SHEAR STUD RAIL
ST SNUG-TIGHT
STD STANDARD
STIFF STIFFENER
STL STEEL
HAS HEADED ANCHOR STUD
HDG HOT-DIP GALVANIZED
HDR HEADER
HORIZ HORIZONTAL
HP HIGH POINT
HT HEIGHT
ID INSIDE DIAMETER
IF INSIDE FACE
INT INTERIOR, INTERMEDIATE
IT INVERTED TEE
JB JOIST BEARING
JST JOIST
JT JOINT
K KIPP (1,000 LBS)
LGS LIGHT GAGE STEEL
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW POINT
LSL LAMINATED STRAND LUMBER
LT LIGHT
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MASY MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE, -ER, -ED
MIN MINIMUM
ML MICROLLAM (TRUS-JOIST BRAND LVL)
MO MASONRY OPENING
MTL METAL
N-S NORTH TO SOUTH
NF NEAR FACE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OCJ OSHA COLUMN JOIST
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PAF POWDER ACTUATED FASTENER
DEV DEVELOP
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DP DRILLED PIER
DT DOUBLE TEE
DWG DRAWING
DWL DOWEL
E-E END TO END
E-W EAST TO WEST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
EMBED EMBEDMENT
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE
EST ESTIMATE
EXC EXCAVATE
EXP EXPANSION
EXT EXTERIOR
F-F FACE TO FACE
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISHED FLOOR, FAR FACE
FIG FIGURE
FL FLUSH
FLG FLANGE
FLR FLOOR
FO FACE OF
FP FULL PENETRATION
FS FOOTING STEP, FAR SIDE
FTG FOOTING
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLUED LAMINATED, GLULAM
GND GROUND
GR GRADE
GT GIRDER TRUSS
GYP BD GYPSUM BOARD
(E) EXISTING
(N) NEW
(R) REMOVE
@ ON CENTER SPACING
AB ANCHOR ROD (BOLT)
ADDL ADDITIONAL
ADJ ADJUSTABLE
AESS ARCH EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AMT AMOUNT
ANCH ANCHOR, ANCHORAGE
APPROX APPROXIMATE
ARCH ARCHITECT, -URAL
ATR ALL THREAD ROD
AVG AVERAGE
BC BOTTOM OF CONCRETE
BL BRICK LEDGE
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BW BOTTOM OF WALL
CB COUNTERBORE
CF CUBIC FOOT
CFS COLD FORMED STEEL
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT, CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER, -MENT
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMON
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS, CONTINUE
COORD COORDINATE, COORDINATION
CS COUNTERSINK
CTR CENTER
CY CUBIC YARD
DAB DEFORMED ANCHOR BAR
DET DETAIL
BOTH FACES
#5 @ 18" HORIZ, #5 @ 12" VERT,
HOOK VERT BARS & EXTEND TO
TOE & HEEL
EXT PAVING,
SEE CIVIL
STONE FACING,
ANCHOR W/ ADJUSTIBLE
STONE PINTLES @ 16"
MAX, EA WAY. SEE
LANDSCAPE DWGS
"M
IN
R
E T
H T
H
V
A R
IE
S
M A
X
SCARIFY UPPER 8" BELOW
FOOTING
DRAIN PIPE & WEEPS @ 10' O.C.,
SEE LANDSCAPE
SEE LANDSCAPE
DWGS FOR EXTENT
OF WALL
1'-0" 1'-4" SEE PLAN
SEE PLAN
5'-0" OR 4'-4"
1'-0 WIDE COLUMN OF
GRANULAR BACKFILL PER
GEOTECH, DOWN TO WEEPS
4" 8" 4"
1'-4"
2"CLR
#5 @ 12" EACH WAY,
BOTTOM AND IN TOP
OF HEEL
#5 x 4'-0 @ 12"
BID OPTION A,
CLIN #2,
RETAINING WALL
15'-1"
2'-8"
1'-4"
1'-0"2
1'-0"
1'-4"
2'-0"
T Y
P
STEP
FOOTING
PROJECTION
NOTE: SEE L6.1 & L7.1FOR
DIMENSIONED STEPS IN TOP
OF WALL. HOLD CONCRETE
FACE BACK 4" FROM STONE
STEP
(E) MORTAR BED JOINT
DO NOT DAMAGE MASONRY UNITS.
DAMAGED MASONRY UNITS MUST BE
REPLACED AT NO COST TO THE
OWNER
(E) MORTAR
JOINTS
"HALF-MOONS" CREATED BY GRINDER ARE
UNACCEPTABLE AND MUST BE REMOVED
VIA MANUAL CHIPPING OR OTHER MEANS
TO ACHIEVE A UNIFORM 3/4" MIN DEPTH
NOTE: MOCKUP IS REQUIRED.
DETAILS ALSO APPLY TO
SKYWARD FACING HEAD JOINTS
TYPICAL JOINT REPAIR
TYPICAL MASONRY UNIT
3/4"MIN
REMOVE MORTAR AT ALL DESIGNATED MORTAR
JOINTS TO A DEPTH OF 3/4" MINIMUM, OR UNTIL
SOUND MORTAR LOCATED. DO NOT GRIND
THROUGH ANY STEEL EMBEDMENTS, IF
ENCOUNTERED
BACK OF JOINT SHALL BE SQUARE
TUCKPOINT GROUND-OUT JOINT W/ (3) 1/4" LIFTS OF
MORTAR. WAIT UNTIL PREVIOUS MORTAR IS THUMB-
PRINT HARD BEFORE TUCKPOINTING NEXT LAYER.
PRE-HYDRATE TUCKPOINTING MORTAR AND JOINT AS
DEFINED IN THE PROJECT SPECIFICATIONS
1/4"EACH
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF9/
/2
9:
:3
A
M C
:\U se rs \C
LB
\D oc um en ts
\2
B
C -C en tr al S
_c hr is tin eb rit to n.
rv t
S2.1
TSS
RECREATION AREA + TRAILHEAD
GREAT BASIN NATIONAL PARK, NV
177607
311170
LB/DJM
LAC
09.19.2022 35 43
BID OPTION A, CLIN #2
UPPER BC PARKING
RETAINING WALL
UPGRADE AND IMPROVE THE BRISTLECONE
SCALE BS2.1
FOUNDATION AT STONE RETAINING WALL2
BID OPTION
SCALE AS2.1
STONE RETAINING WALL LAYOUT1
NO SCALES2.1
EXISTING STONE RETAINING WALL, MORTAR JOINT, AND REPOINTING REPAIR3
1. SEE LANDSCAPE DRAWINGS FOR EXTENT OF EXISTING RETAINING WALL NORTH AND SOUTH OF THE EXISTING VAULT TOILET.
2. ASSUME 10% OF THE JOINT LENGTH IN THE STONE ON BOTH FACES AND THE TOP REQUIRES JOINT REPAIR.
3. GC SHALL TAKE MORTAR TESTS AND MATCH MORTAR MIX AND COLOR. PROVIDE ADMIXTURE FOR JOINT FLEXIBILITY
CONSISTENT WITH CURRENT PARK PRACTICES AND WITH APPROVAL OF CONTRACTING OFFICER.
REFERENCE S0.1, S0.2 AND S0.3 AND
SPECIFICATIONS FOR ADDITIONAL
INFORMATION
• DIMS FOR REFERENCE ONLY. SEE LANDSCAPE DRAWINGS
FOR DIMS, SLOPES, & ELEVATIONS
BASE BID
1 10 2 3
SCALE OF FEET
3/4" = 1'-0"SCALE B
8 0 8 16
SCALE OF FEET
1/8" = 1'-0"SCALE A
TYPICAL SIGNAGE ANCHORAGE:
PROVIDE 3/8" STAINLESS STEEL THREADED RODS
W/ 2" MIN EMBEDMENT INTO BACKUP MATERIAL
BEYOND STONE FACING (ASSUME 8" LONG
ANCHORS FOR PRICING). EMBED ANCHOR IN
SCREEN TUBE AND SIMPSON SET XP EPOXY (OR
EQUIVALENT)
SLAB AT ENTRANCE TO (E) VAULT TOILET:
DOWEL EXTERIOR SLAB INTO (E) VAULT SLAB W/ #
4x3'-0 @ 12" O.C. W/ 4" EMBEDMENT INTO EPOXY
ADHESIVE. EXTERIOR FLATWORK ADJACENT TO
TOILET SHALL BE PLACED ON 12" GRANULAR NON-
EXPANSIVE FILL
tr
9/1 /22
:13
E
AN
DE
RS
ON
R
P
:\D
EN
VE
R\
NP
S
GR
BA
LO
W
ER
LE
HM
AN
_B
RI
ST
LE
CO
NE
-1
\9_
FI
NA
L_
CD
\C
AD
\B C\
LA
\L7
-0 _G
RB
A_
BC
_D
ET
AI
LS
.D
W G
XR
EF
S:
BA
SE
S\
XL
-T
IT
LE
IN
FO
-B
C.
DW
G;
IM
AG
ES
IM
AG
ES
\LI
NK
ED
IM
AG
ES
\A
UB
A3
9.J
PG
9/1 /22
:13
E
AN
DE
RS
ON
R
P
:\D
EN
VE
R\
NP
S
GR
BA
LO
W
ER
LE
HM
AN
_B
RI
ST
LE
CO
NE
-1
\9_
FI
NA
L_
CD
\C
AD
\B C\
LA
\L7
-0 _G
RB
A_
BC
_D
ET
AI
LS
.D
W G
XR
EF
S:
BA
SE
S\
XL
-T
IT
LE
IN
FO
-B
C.
DW
G;
IM
AG
ES
IM
AG
ES
\LI
NK
ED
IM
AG
ES
\A
UB
A3
9.J
PG
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
S IO
NAL ENGINEER- STATE OF NEVADA
No . 030315
SCOTT
PALING
CIVIL
| GRBA-BC CD Set |
| Sheets and Views |
| 1 L0-0_GRBA_BC-COVER - L0-0 |
| 2 L0-1_GRBA_BC_INDEX - L0-1 |
| 3 G1-0-GRBA_BC-CLIN - G1-0 |
| PLOT |
| 4 G2-0-GRBA-BC-SiteAccessibility - G2.0 |
| 5 G3-0-GRBA-BC-Staging - G3.0 |
| 10 L1-0_GRBA_BC_ExCon - L1-0-Bristlecone |
| PLOT |
| 11 L1-0_GRBA_BC_ExCon - L1-1-Bristlecone Site Photos |
| PLOT |
| 12 D3-0-GRBA_BC_Demo - D3-0-BC-BASE |
| PLOT |
| 14 L2-0-GRBA_BC_SiteAccessiblity - L2-0-BC-BASE |
| PLOT |
| 15 L4-0-GRBA_BC_Layout - L4-0-BC-BASE |
| PLOT |
| 16 L5-0-GRBA_BC_CoordinatePoints - L5-0-BC-BASE |
| PLOT |
| 17 L6-0-GRBA_BC_Grading - L6-0-BC-BASE |
| PLOT |
| 27 D3-0-GRBA_BC_Demo - D3-1-BC-BID |
| PLOT |
| 28 L4-0-GRBA_BC_Layout - L4-1-BC-BID |
| PLOT |
| 29 L5-0-GRBA_BC_CoordinatePoints - L5-1-BC-BID |
| PLOT |
| 30 L6-0-GRBA_BC_Grading - L6-1-BC-BID |
| PLOT |
| 36 L1-0_GRBA_SP_ExCon - L1-0-Summit Peak |
| PLOT |
| 37 D3-0-GRBA_SP_Demo - D3-0-SUMMIT |
| PLOT |
| 38 L4-0-GRBA_SP_Layout-Grading - L4-0-SUMMIT |
| PLOT |
| 39 L5-0-GRBA_SP_CoordinatePoints - L5-0-SUMMIT |
| PLOT |
| 40 L7-0_GRBA_BC_Details - L7.0 |
| 41 L7-0_GRBA_BC_Details - L7.1 |
| GRBA - BC_Final CDs |
| Sheets and Views |
| C0.0 LEGEND AND ABBREVIATIONS |
| C0.1 NOTES |
| C0.2 NOTES |
| C1.0 SURVEY CONTROL SHEET |
| D3.1 UTILITY DEMOLITION |
| C3.0 PAVING PLAN |
| C3.1 PAVING PLAN |
| C5.0 STORM INLET EXTENSION |
| C5.1 CULVERT PLAN AND PROFILE |
| C6.0 EROSION CONTROL PLAN |
| C6.2 EROSION CONTROL DETAILS |
| C7.0 UTILITY DETAILS |
| C7.1 UTILITY DETAILS |
| C7.2 SITE DETAILS |
| C7.3 SITE DETAILS |
| GRBA_BC_311170_FinalCDDrawings_20220919_JVA STAMPED |
| GRBA_BC_311170_FinalCDDrawings_20220919_JVA STAMPED |
| Sheets |
| S0.1 - BID OPTION A, CLIN #2 UPPER BC PARKING GENERAL NOTES |
| S0.2 - BID OPTION A, CLIN #2 UPPER BC PARKING GENERAL NOTES |
| S0.3 - BID OPTION A, CLIN #2 UPPER BC PARKING STR ABREV & SYMBOLS |
| GRBA_BC_311170_FinalCDDrawingsS2.1_20220919_JVA STAMPED |
| Sheets |
| S2.1 - BID OPTION A, CLIN #2 UPPER BC PARKING RETAINING WALL |