B08_Atch_2_-_Equipment_List.pdf
PDF 10 MB Posted
- Attached to
- MANZ-FIRE SYSTEM INSPECTIONS-BASE YR Federal contract opportunity
- Solicitation number
- 140P8126Q0038
About this file
This is a California Code of Regulations (CCR) Title 19 fire protection system inspection, testing, and maintenance report for the Manzanar property located at 5001 Highway 395 in Independence. The facility contains five risers serving various buildings including the VC Auditorium, VC Pump House, 1945 Manzanar Barrack, 1942 Manzanar Barrack, and Block 14 Mess Hall, with riser diameters ranging from 2 inches to 4 inches.
The report documents comprehensive quarterly and annual inspection, testing, and maintenance activities for dry pipe fire sprinkler systems. Quarterly inspections cover 16 items including control valves, waterflow alarm devices, gauges, air pressure, water supply pressure, heat tape, spare sprinklers, fire department connections, and pressure reducing valves. Annual inspections include 16 additional items such as buildings freeze protection, sprinklers, pipe and fittings, hangers, seismic braces, and small hose connections, plus specialized testing such as field service tests, recalled sprinklers, waterflow alarm devices, main drain tests, and priming water level tests. The electric fire pump annual report includes pump specifications (Peerless 10 MAF with US Motors AU DP driver), flow tests at various nozzle configurations, and comprehensive maintenance and testing requirements with 33 inspection items and 10 maintenance items covering pump operation, piping, electrical systems, and control mechanisms. The private fire service main report documents quarterly and annual inspections of control valves, hose houses, pressure reducing valves, backflow preventers, supervisory devices, monitor nozzles, hydrants, mainline strainers, and piping. All inspections and tests completed on 07/09/24 were documented as passing with no deficiencies noted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Atch_3_-_SCA_Wage_Determination_-_Inyo_County__CA_5_13_26.pdf | ||
| B08_Atch_1_-_Statement_of_Work.pdf | ||
| Sol_140P8126Q0038.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .