This is a Scope of Work for annual inspection and testing of fire protection, detection, and notification systems at Manzanar National Historic Site in Inyo County, California.

The contract is for a one-year base period with up to four option years, with work to be performed from approximately July 2026 through July 2027 and subsequent option years if exercised. Annual reports must be reviewed and approved by the Contracting Officer's Representative (COR) no later than July 1st each year. The contractor must inspect and test five dry sprinkler systems, one electric-powered fire pump, three hydrants with flow testing, and six backflow preventers in compliance with applicable NFPA codes and standards. All systems are located within 1,000 yards of the visitor center building at 5001 US-395, Independence, California 93526. Work shall be performed during regular park hours (9:00 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays), with the contractor providing 72 hours advance notice for work in occupied facilities. The contractor must be accompanied by park employees when accessing occupied housing units.

The contractor must be qualified in fire protection inspection and testing with three years of continuous experience in California, hold appropriate state licensure throughout the contract term, and provide all manpower, equipment, tools, and supplies. Deliverables include NPS Annual Inspection Forms (PDF format), NFPA Testing Forms (PDF format), and a comprehensive deficiency list in MS Excel format. Draft reports are due within seven days of inspection completion, with seven days for government review, and final reports due within seven days of receiving comments. The contractor must identify deficiencies by severity level (minor, essential, or critical) with applicable code citations and immediately notify the CO of critical deficiencies. The contractor is responsible for legal disposal of solid waste and proper disposal of antifreeze and other fluids used during system testing in accordance with park gray water disposal protocols.

View the file

Other files for this federal contract opportunity

Other files attached to MANZ-FIRE SYSTEM INSPECTIONS-BASE YR, newest first.
File Type Posted
B08_Atch_3_-_SCA_Wage_Determination_-_Inyo_County__CA_5_13_26.pdf PDF
Sol_140P8126Q0038.pdf PDF
B08_Atch_2_-_Equipment_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

INSPECTION & TESTING

FIRE PROTECTION, DETECTION AND NOTIFICATION SYSTEMS

MANZANAR NATIONAL HISTORIC SITE

PART 1 – GENERAL INFORMATION

A one-year contract with up to 4 option years: Contractor shall provide pricing for base year and for subsequent option years to provide inspection and testing of the following systems and equipment.

1.0 Description of Work:

Inspect all identified systems per applicable NFPA Code to ensure code compliance and system functionality, and to identify any deficiencies.

The provided National Park Service (NPS) asset specific forms shall be completed for each system inspection, in addition to any NFPA required forms. All completed forms shall be provided post inspection to the Contracting Officer’s Representative in PDF format (see section 3.2).

Manzanar National Historic Site (NHS): Perform annual fire inspection for Manzanar NHS, to include the following:

• Five (5) dry sprinkler systems

• One (1) fire pump (electric powered)

• Three (3) hydrants with flow

• Six (6) backflow preventers

The system is equipped with a test header.

1.1 Location: This project is located in Manzanar NHS, Inyo County, California. All systems are inside or within 1,000 yards of the visitor center building, 5001 US-395, Independence, CA 93526.

1.2 Performance Period: This work shall be provided from approximately July 2026, through July 2027, and the same timelines apply for subsequent option years, if exercised. Annual reports must be reviewed and approved by COR no later than July 1st each year.

1.3 Regular Working Hours: Regular working hours at the park are from 9:00 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays. All work shall be scheduled during regular working hours.

1.4 Notification: The Contractor shall notify the Contracting Officer’s Representative at least 72 hours in advance for all work in occupied facilities.

1.5 Work Restrictions: The contractor shall be accompanied by a park employee at all times when performing the work of the contract in occupied park housing units. A park representative will be on-site and available for contractor support (primarily unlocking doors) for non-occupied housing units and public use buildings.

1.6 Qualifications & Experience: The Contractor(s) shall be qualified in the inspection, testing, and repair related to their field of expertise, in full compliance with current NFPA standard’s (i.e. Fire Suppression / Fire Detection & Notification). The Contractor shall have continuously performed inspection and testing in their field of expertise within California for the past three (3) years. The contractor shall hold the appropriate licensure throughout the length of the entire contract.

1.7 Supplies & Services: The Contractor shall provide all manpower, equipment, tools and supplies to perform the requested services, complete and in conformity with the contract. The Contractor shall proceed to furnish the services of this contract promptly upon notification by the Contracting Officer (CO).

1.8 Waste Disposal: The Contractor shall legally dispose of all solid waste materials offsite. If applicable, the Contractor shall make provisions for the proper collection, transportation, and off-site disposal of antifreeze solutions and other fluid additives used for flushing during system testing. Disposal of these fluids into the ground, drains, waterways, or park wastewater systems will not be permitted. The Contractor shall dispose of water used for flushing during system testing in a manner that is consistent with the park protocol for disposal of gray water.

PART 2 – REFERENCE CODES AND STANDARDS (Revision)

The following is a list of NFPA codes and standards that may apply to this scope of work. The Contractor shall use the latest version of the NFPA codes and standards listed below for the inspection, testing, and repair of specified fire protection systems.

• NFPA 11 (Standard for Low-, Medium-, and High-Expansion Foam Systems).

• NFPA 12 (Standard on Carbon Dioxide Extinguishing Systems).

• NFPA 12A (Standard on Halon 1301 Fire Extinguishing Systems).

• NFPA 13 (Standard for the Installation of Sprinkler Systems).

• NFPA 13D (Standard for the Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes).

• NFPA 13R (Standard for the Installation of Sprinkler Systems in Residential Occupancies up to and

Including Four Stories in Height).

• NFPA 14 (Standard for the Installation of Standpipes and Hose Systems).

• NFPA 15 (Standard for Water Spray Fixed Systems for Fire Protection).

• NFPA 16 (Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray Systems).

• NFPA 17 (Standard for Dry Chemical Extinguishing Systems).

• NFPA 17A (Standard for Wet Chemical Extinguishing Systems).

• NFPA 20 (Standard for the Installation of Stationary Pumps for Fire Protection).

• NFPA 22 (Standard for Water Tanks for Private Fire Protection).

• NFPA 24 (Standard for the Installation of Private Service Mains and Their Appurtenances).

• NFPA 25 (Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection

Systems).

• NFPA 70 (National Electric Code).

• NFPA 72 (National Fire Alarm Code).

• NFPA 80 (Standard for Fire Doors and Other Opening Protective’s).

• NFPA 90A (Standard for the Installation of Air-Conditioning and Ventilation Systems).

• NFPA 96 – (Standard for ventilation Control and Fire Protection of Commercial Cooking

Operations).

• NFPA 101 (Life Safety Code).

• NFPA 110 (Standard for Emergency and Standby Power Systems).

• NFPA 291 (Recommended Practice for Fire Flow Testing and Marking of Hydrants).

• NFPA 750 (Standard on Water Mist Fire Protection Systems).

• NFPA 2001 (Standard on Clean Agent Fire Extinguishing Systems).

• NFPA 2010 (Standard for Fixed Aerosol Fire Extinguishing Systems).

• International Building Code (latest edition).

• International Mechanical Code (latest edition).

• International Plumbing Code (latest edition).

• International Fire Code (latest edition).

Although NFPA standards require inspections more than once a year, the contractor is only responsible for performing the inspections once a year.

PART 3 – SCOPE OF SERVICES

3.1 INSPECTION & TESTING OF FIRE PROTECTION SYSTEMS

After verifying the accuracy of the systems inventory, the Contractor(s) shall perform the inspection and testing of the fire protection systems identified. This work shall be completed only by qualified personnel as outlined in Section 1.6 This work shall be based on the minimum annual requirements as outlined in applicable NFPA codes and standards. Immediately following the inspection and testing, the Contractor shall complete and submit the NPS inspection forms (which cover the minimum requirements of the NFPA forms) and any pertinent NFPA testing forms for each system. NPS inspection forms (PDF format) will be furnished to the Contractor after contract award.

3.2 IDENTIFY SYSTEM DEFICIENCIES

The Contractor shall identify the deficiencies for each system. Each deficiency shall include the applicable code / standard citation(s) that warrant the repair. Each deficiency shall be identified as “minor”, “essential”, or “critical” (posing an imminent hazard or threat to employees, visitors, or the resource). Repairs deemed to be “critical” shall immediately be brought to the attention of the Contracting Officer (CO).

PART 4 – DELIVERABLES

The Contractor shall complete and submit the following deliverables in a timely fashion to the COR:

• NPS Annual Inspection Forms for each fire protection system (Refer to Section 3.1). Format: PDF files. Draft inspection reports shall be submitted for review and comment to COR within 7 days of the completion of inspection at each specific site. The Government has 7 days to return questions or comments before the final report is due. Final inspection reports estimates shall be submitted within 7 days of receipt of comments from NPS.

• NFPA Testing Forms for each fire protection system tested (Refer to Section 3.1). Format: PDF files.

• Comprehensive list of deficiencies (Refer to Section 3.2). Format: MS Excel Document.

It is the responsibility of the contractor to ensure all required reports and cost estimates are finalized and accepted by COR by the end of performance period each year.

PART 5 – GOVERNMENT-FURNISHED INFORMATION

5.1 MATERIALS - The NPS will furnish the following materials in support of this contract.

• Construction or as-built drawings of the assets / facilities, if available.

• Photos of the assets / facilities and/or fire protection systems, upon request.

• NPS annual inspection forms.

5.2 SERVICES – The NPS will provide the following services in support of this contract.

• Provide a single point of contact for all contract administration.

• Provide additional background information, if necessary.

• Facilitate the logistics of the initial site visit to the park.

• Review vendor product submittals and provide comments in a timely manner.

PART 6 –ROLES AND RESPONSIBILITIES

A. Contractor Project Manager - The Contractor Project Manager shall be designated prior to the start of work. The Contractor Project Manager, or a designated representative in his/her absence, shall be available Monday through Friday, excluding Government holidays, to discuss the work with the Contracting Officer or the COR.

B. Sprinkler/Backflow Testing/Inspection Personnel – Personnel meeting the requirements of NFPA 72 Paragraph 10.5.3 and applicable California codes and approved by the NPS Authority Having Jurisdiction.

C. Contracting Officer’s Representative (COR) – Direct POC for Contractor. Shall review all deliverables and assist with site logistics.

File details come from the government source that posted it. Updated .