This document is a Statement of Work for Equipment Repair Services for a Caterpillar 440F2 Backhoe at Lake Mead National Recreation Area. The National Park Service requires comprehensive repairs to address multiple hydraulic system issues, including replacing leaking hydraulic hoses, repairing cylinder leaks, replacing the product link system wiring harness, and replacing the cabin roof panel. The contractor must complete all repairs within 40 calendar days after contract award, with the repair shop located within 100 miles of the Lake Mead Maintenance Complex in Boulder City, Nevada. The scope includes providing all necessary labor, tools, and parts to restore the equipment to original manufacturer functionality, with strict instructions to contact the contracting officer if any additional issues are discovered during the repair process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Mead National Recreation Area
Boulder City, Nevada
Equipment Repair Services:
Caterpillar 440F2 Backhoe
DATED: 3/19/2025
Prepared By: Trent Martinez, Supervisory Facility Management Systems Specialist
NATIONAL PARK SERVICE
Lake Mead National Recreation Area
LAKE – Equipment Repair Services
EQUIPMENT REPAIR SERVICES – 440F2 BACKHOE
1. BACKGROUND
Lake Mead National Recreation Area (LAKE) is a U.S. National Recreation Area in Southeastern Nevada and Northwestern Arizona. Operated by the National Park Service, Lake Mead NRA follows the Colorado River corridor from the westernmost boundary of Grand Canyon National Park to just north of the cities of Laughlin, Nevada and Bullhead City, Arizona. A fleet of heavy equipment is utilized to maintain park operations across the recreation area.
This contract requires repairs services for the NPS owned fleet of heavy equipment operated by the maintenance staff to perform critical maintenance operations.
2. REQUIREMENTS
The Lake Mead Staff will transport the equipment to the contractor’s shop location. The shop must be located within 100 miles of the Lake Mead Maintenance complex. The contractor shall complete the repairs and contact the Contracting Officer’s Representative (COR) to set up a time for an onsite inspection. Once the work has been accepted by the COR, Lake Mead staff will transport the equipment back to the Park.
Address of Lake Mead Maintenance Complex:
101 Katzenbach Drive, Boulder City, NV 89002
Equipment: Caterpillar 440F2 Backhoe
Repairs Required: Contractor shall provide all labor, tools, and parts necessary to complete, test, and calibrate to assure original equipment manufacturer’s functionality of the following repairs:
a) Replace all the leaking hydraulic hoses, clamps, seal-o-rings, and lines at the bottom of the hydraulic tank next to the cab that are leaking.
b) Repair, test, check, and adjust the bucket linkage positioning sensor to manufacturer specifications.
c) Repair, straighten, and recondition to stop all hydraulic leaks on the left and right rear stabilizer cylinders.
d) Repair, straighten, and recondition to stop all hydraulic leaks on the rear boom cylinder.
e) Repair, straighten, and recondition to stop all hydraulic leaks on the stick cylinder.
f) Repair, straighten, and recondition to stop all hydraulic leaks on the multipurpose bucket cylinders with a level 1 reconditioning including replacement of internal seals and gaskets.
g) Replace product link system wiring harness and antenna.
LAKE – Equipment Repair Services
h) Replace cabin roof panel including the power outlet and wiring harness on front right hand top corner and roll over protection system.
i) Refill all hydraulic fluids and fluid reservoirs to manufacturers recommended levels and perform a fluid analysis.
j) Contractor shall test all hydraulic lines after installation to ensure no leaks exist.
Only the work covered in this document shall be completed unless otherwise authorized by the contracting officer. If additional issues are found, the contractor must stop work and contact the contracting officer for further guidance.
3. PERIOD OF PERFORMANCE:
All tasks and deliverables for this contract must be completed within 40 of days after award.
Days listed herein refer to calendar days.