B08_2025_Bid_Schedule-SAHO_Containers_FY25-27.docx
DOCX document 26 KB Posted
- Attached to
- GATE-SAHO FY25 CONTAINERS & DISPOSAL Federal contract opportunity
- Solicitation number
- 140P4525Q0032
About this file
This document is a Contract Bid Schedule for container and disposal services at the Sandy Hook Unit of Gateway National Recreation Area. The solicitation (140P4525Q0032) covers a base year (FY2025) and two optional subsequent years (FY2026 and FY2027), with specific line items for container services and disposal. The bid requires contractors to provide:
- Base Bid (FY2025): 18 x 30-cubic-yard containers for Maintenance Operations, disposal fees for 100 tons of mixed construction waste, and 3 x 6-yard single-stream recycling containers with twice-weekly collection. 2. Option Years (FY2026 and FY2027): Identical service requirements with the same quantities and collection specifications. The bid schedule allows contractors to price each line item, with a total grand total calculation for the entire three-year period. The opportunity is issued by the Department of the Interior National Park Service Northeast Region, located at Fort Hancock, New Jersey, with services to be performed from May 1 of each specified year through April 30 of the subsequent year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_More_Questions_and_Answers_0004.docx | DOCX document | |
| Sol_140P4525Q0032_Amd_0004.pdf | ||
| Sol_140P4525Q0032_Amd_0003.pdf | ||
| Sol_140P4525Q0032_Amd_0002.pdf | ||
| Sol_140P4525Q0032_Amd_0001.pdf | ||
| Sol_140P4525Q0032.pdf | ||
| B08_References_Worksheet.doc | DOC document | |
| B03_2015-4195.pdf | ||
| B08_REV_Separately_Priced_In_Accordance_with_FAR_Clause_52.pdf | ||
| A04_2025_SOW-SAHO_Containers_FY25-27.docx | DOCX document | |
| B08_Technical_Questionnaire.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT BID SCHEDULE
Containers and Disposal Request for FY2025 (Base Bid), Option Year 1, and Option Year 2 Gateway National Recreation Area - Sandy Hook Unit Submit bid for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items for the bid item descriptions.
BASE BID ITEM NO 10:
Provide eighteen (18) -30 CY containers for Maintenance Operations at Sandy Hook Unit from May 1, 2025 through April 30, 2026 at various locations at Sandy Hook. This cost will include the delivery, usage, and pick-up of the container.
BASE BID ITEM NO 10: UNIT SUM $ _ _/Container x 18 EA =$ _ _TOTAL
BASE BID ITEM NO 20:
Disposal fees Cost per ton for 100.0 tons to account for the tonnage of the containers of the Maintenance Operations of mixed construction waste from May 1, 2025 through April 30, 2026.
BASE BID ITEM NO 20: UNIT SUM $ _ _/Ton x 100.0 tons =$ _ _TOTAL
BASE BID ITEM NO 30:
Provide 3 - 6-yard Single Stream Recycling Containers with 2x per week collection, Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters:
BASE BID ITEM NO 30: UNIT SUM $_ _/Container/month x 3 units X 4 month = $ TOTAL
TOTAL BASE BID (FFP line Items 10 through 30) = $_______ __________
Provide 18 -30 CY containers for Maintenance Operations at Sandy Hook Unit from May 1, 2026 through April 30, 2027 at various locations at Sandy Hook. This cost will include the delivery, usage, and pick-up of the container.
BID ITEM NO 40: UNIT SUM $ __ __/Container x 18 EA =$ ___ _TOTAL
OPTION YEAR 1- BID ITEM NO 50:
Disposal fees Cost per ton for 100.0 tons to account for the tonnage of the containers of the Maintenance Operations of mixed construction waste from May 1, 2026 through April 30, 2027.
BID ITEM NO 50: UNIT SUM $ _ __/Ton x 100.0 tons =$ __ _TOTAL
OPTION YEAR 1- BID ITEM NO 60:
Provide 3 - 6-yard Single Stream Recycling Containers with 2x per week collection, Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters:
BID ITEM NO 60: UNIT SUM $____ _/ Container/month x 3 units X 4 month = $ TOTAL
TOTAL OPTION YEAR 1 (FFP line Items 40 through 60) = $_______
OPTION YEAR 2- BID ITEM NO 70:
Provide 18 -30 CY containers for Maintenance Operations at Sandy Hook Unit from May 1, 2027 through April 30, 2028 at various locations at Sandy Hook. This cost will include the delivery, usage, and pick-up of the container.
BID ITEM NO 70: UNIT SUM $ __ __/Container x 18 EA =$ ___ _TOTAL
OPTION YEAR 2- BID ITEM NO 80:
Disposal fees Cost per ton for 100.0 tons to account for the tonnage of the containers of the Maintenance Operations of mixed construction waste from May 1, 2027 through April 30, 2028
BID ITEM NO 80: UNIT SUM $ _ _/Ton x 100.0 tons =$ __ _TOTAL
OPTION YEAR 2- BID ITEM NO 90:
Provide 3 - 6-yard Single Stream Recycling Containers with 2x per week collection, Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters:
BID ITEM NO 90: UNIT SUM $_ _/ Container/month x 3 units X 4 month = $ TOTAL
TOTAL OPTION YEAR 2 (FFP line Items 70 through 90) = $_______
GRAND TOTAL: (LINE ITEMS 10 through 90) = $__________________
END OF SCHEDULE
File details come from the government source that posted it. Updated .