This document is a Statement of Work (SOW) for container and disposal services at the Sandy Hook Unit of Gateway National Recreation Area for fiscal years 2025-2028. The base bid and two option years require a contractor to provide eighteen 30-cubic-yard containers for maintenance operations, with a disposal fee covering 100 tons of mixed construction waste, and three 6-yard single-stream recycling dumpsters for beach centers. The recycling dumpsters must be collected twice weekly (preferably Mondays and Fridays) before 8:00 AM, with all deliveries and pickups occurring between 7 AM and 2 PM on weekdays, excluding federal holidays.

The contract periods are structured as follows: Base Bid from August 1, 2025 to April 30, 2026, with beach center recycling from August 1 to September 15, 2025; Option Year 1 from May 1, 2026 to April 30, 2027, with beach center recycling from May 15 to September 14, 2026; and Option Year 2 from May 1, 2027 to April 30, 2028, with beach center recycling from May 20 to September 20, 2027. The contractor must comply with all federal, state, and local requirements for container transportation and disposal, and container locations will be specified on the day of delivery. The solicitation number is 140P4525Q0032 and is issued by the Department of the Interior National Park Service Northeast Region.

View the file

Other files for this federal contract opportunity

Other files attached to GATE-SAHO FY25 CONTAINERS & DISPOSAL, newest first.
File Type Posted
Sol_140P4525Q0032_Amd_0004.pdf PDF
B09_More_Questions_and_Answers_0004.docx DOCX document
Sol_140P4525Q0032_Amd_0003.pdf PDF
Sol_140P4525Q0032_Amd_0002.pdf PDF
Sol_140P4525Q0032_Amd_0001.pdf PDF
B08_References_Worksheet.doc DOC document
B03_2015-4195.pdf PDF
Sol_140P4525Q0032.pdf PDF
B08_2025_Bid_Schedule-SAHO_Containers_FY25-27.docx DOCX document
B08_REV_Separately_Priced_In_Accordance_with_FAR_Clause_52.pdf PDF
B08_Technical_Questionnaire.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Containers and Disposal Request for FY2025 (Base Bid), Option Years 1, and 2 Gateway National Recreation Area - Sandy Hook Unit

BASE BID (August 1, 2025 – April 30, 2026):

Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:

· The contractor shall provide eighteen (18)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Disposal Fee for Containers of Maintenance Operations:

· The contractor shall provide 100.0 tons to account for the tonnage of the containers of the Maintenance Operations. The containers will be used for mixed construction waste.

Single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit:

· The contractor shall provide three (3) 6-yard single-stream recycling dumpsters at Sandy Hook.

· All recycling dumpsters shall be for Single-Stream Recycling.

· All dumpsters shall be properly marked/labeled and in good working order.

· Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.

· The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

· Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.

· Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:

· The period of performance is from August 1, 2025 through September 15, 2025. All dumpsters shall be delivered by August 1, 2025, and removed on September 15, 2025.

· Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.

The contractor shall provide the transportation and disposal for all containers provided.

Schedule for Work:

The period of performance of this SOW is from August 1, 2025 – April 30, 2026. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m. during the work week of Monday thru Friday excluding Federal Holidays.

For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from August 1, 2025, through September 15, 2025. All dumpsters shall be delivered by August 1, 2025, and removed on September 15, 2025.

SCOPE OF WORK (Continued)

Gateway National Recreation Area - Sandy Hook Unit

Option Year 1 (May 1, 2026 – April 30, 2027):

Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:

· The contractor shall provide eighteen (18)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Disposal Fee for Containers of Maintenance Operations:

· The contractor shall provide 100.0 tons to account for the tonnage of the containers of the Maintenance Operations. The containers will be used for mixed construction waste.

Single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit:

· The contractor shall provide three (3) 6-yard single-stream recycling dumpsters at Sandy Hook.

· All recycling dumpsters shall be for Single-Stream Recycling.

· All dumpsters shall be properly marked/labeled and in good working order.

· Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.

· The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

· Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.

· Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:

· The period of performance is from May 15 through September 14, 2026. All dumpsters shall be delivered by May 15, 2026, and removed on September 14, 2026.

· Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.

The contractor shall provide the transportation and disposal for all containers provided.

Schedule for Work:

The period of performance of this SOW is from May 1, 2026 – April 30, 2027. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m. during the work week of Monday thru Friday excluding Federal Holidays.

For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from May 15 through September 14, 2026. All dumpsters shall be delivered by May 15, 2026, and removed on September 14, 2026.

SCOPE OF WORK (Continued)

Gateway National Recreation Area - Sandy Hook Unit

Option Year 2 (May 1, 2027 – April 30, 2028):

Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:

· The contractor shall provide eighteen (18)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Disposal Fee for Containers of Maintenance Operations:

· The contractor shall provide 100.0 tons to account for the tonnage of the containers of the Maintenance Operations. The containers will be used for mixed construction waste.

Single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit:

· The contractor shall provide three (3) 6-yard single-stream recycling dumpsters at Sandy Hook.

· All recycling dumpsters shall be for Single-Stream Recycling.

· All dumpsters shall be properly marked/labeled and in good working order.

· Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.

· The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.

· Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.

· Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.

Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:

· The period of performance is from May 20 through September 20, 2027. All dumpsters shall be delivered by May 20, 2027, and removed on September 20, 2027.

· Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.

The contractor shall provide the transportation and disposal for all containers provided.

Schedule for Work:

The period of performance of this SOW is from May 1, 2027 – April 30, 2028. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m. during the work week of Monday thru Friday excluding Federal Holidays.

For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from May 20 through September 20, 2027. All dumpsters shall be delivered by May 20, 2027, and removed on September 20, 2027.