B08_140P8426Q0062_Att02_SOW_(9-16-26).pdf
PDF 114 KB Posted
- Attached to
- Supply & Install Industrial Generator, NPS-LAVO
- Solicitation number
- 140P8426Q0062
About this file
This is a Statement of Work (SOW) for the National Park Service's Lassen Volcanic National Park requiring the supply and installation of a complete standby power generation system at the Manzanita Lake Maintenance Facility in Mineral, California.
The contractor must supply and install one (1) new industrial diesel standby generator with a minimum capacity of 12,000 watts (equivalent to or equal to a Kubota GL14000 LowboyPro Series) and one (1) new automatic transfer switch (ATS) compatible with the furnished generator. All work is turnkey, meaning the contractor assumes full responsibility for delivering a complete and fully operational system capable of automatic operation upon utility power failure. The project period runs from September 28, 2026, through January 29, 2027, with normal working hours Monday through Friday, 7:00 a.m. to 5:00 p.m., excluding federal holidays. Prior to equipment ordering, the contractor must conduct a site visit to verify existing electrical service conditions, dimensions, clearances, generator sizing requirements, ATS compatibility, required infrastructure modifications, and access routes. The contractor must also remove the existing generator and associated components, properly dispose of all materials in compliance with federal, state, and local regulations, and recycle materials whenever possible.
Installation work must comply with the National Electrical Code (NEC), National Fire Protection Association (NFPA) standards, manufacturer specifications, OSHA requirements, and applicable regulations. The contractor must obtain and pay for all permits and inspections unless otherwise directed by the Contracting Officer. Upon installation completion, the contractor must perform startup procedures, verify proper operation, conduct simulated utility power outage testing, perform a minimum two-hour operational test under facility load or approved load-bank conditions, and provide on-site operator training covering normal operation, emergency operation, routine maintenance, safety procedures, and warranty procedures. Prior to final acceptance, the contractor must submit manufacturer warranties, equipment and maintenance manuals, startup and commissioning reports, test reports, as-built drawings, and a recommended maintenance schedule. The contractor warrants all labor, installation workmanship, and materials for a minimum of one (1) year from final acceptance, with manufacturer warranties transferred to the Government. Final acceptance occurs only after installation is complete, all testing is successful, required documentation is submitted, training is completed, and the system is fully operational and accepted by the Contracting Officer's Representative. The Park Contact/Contracting Officer's Representative is Chief of Maintenance Joe Pettegrew at (530) 200-3065 or joe_pettegrew@nps.gov. Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform System (IPP) at https://www.ipp.gov/ within 30 days of work completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generator Supply & Install, Lassen Volcanic National Park Page 1 of 5
Lassen Volcanic National Park Statement of Work (SOW)
Generator Supply & Install: Supply & Install Standby Generator and Automatic Transfer Switch at Manzanita Lake Maintenance Facility
1. PROJECT DESCRIPTION
The National Park Service (NPS), Lassen Volcanic National Park (LAVO), has a requirement for a qualified contractor to provide all labor, supervision, materials, equipment, tools, transportation, permits, testing, startup, commissioning, and incidentals necessary to furnish and install one (1) complete standby power generation system and automatic transfer switch (ATS) to replace the existing standby generator system serving the Manzanita Lake (ML) Maintenance Facility.
This project shall be completed as a turnkey installation. The Contractor shall be fully responsible for providing a complete and operational standby power system capable of automatic operation upon utility power failure.
2. PLACE OF PERFORMANCE
Manzanita Lake Maintenance Facility Lassen Volcanic National Park 38050 Highway 36 East Mineral, California 96063
Normal working hours are Monday through Friday, 7:00 a.m. to 5:00 p.m., excluding federal holidays.
3. PERIOD OF PERFORMANCE
September 28, 2026, through January 29, 2027
4. SPECIFICATIONS
The Contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to perform the following:
A. Site Verification Prior to ordering equipment, the Contractor shall conduct a site visit to:
• Verify existing electrical service conditions.
• Verify dimensions and clearances.
• Confirm generator sizing requirements.
Generator Supply & Install, Lassen Volcanic National Park Page 2 of 5
• Verify ATS compatibility and installation requirements.
• Identify any required modifications to existing electrical infrastructure.
• Verify access routes and staging requirements.
The Contractor shall be responsible for field verification of all existing conditions.
Submission of an offer constitutes acknowledgment that the Contractor has either visited the site or otherwise satisfied itself as to site conditions. Failure to verify existing conditions shall not be grounds for additional compensation after award.
B. Equipment Furnishing Provide and install:
• One (1) new Industrial Diesel Standby Generator, 12,000 Watt minimum, equivalent or "equal" to a Kubota GL14000 LowboyPro Series
• One (1) new Automatic Transfer Switch (ATS) compatible with the furnished generator.
• All associated wiring, conduit, disconnects, overcurrent protection devices, grounding equipment, mounting hardware, controls, and accessories required for a complete operational system.
All equipment shall be new, unused, and covered by the manufacturer’s standard warranty.
To be considered for award, quotes of "equal" products, including "equal" products of the brand name manufacturer, must meet the salient physical, functional, or performance characteristics specified.
"Equal" products shall meet or exceed all published specifications, performance characteristics, and reliability standards of the specified Kubota generator.
C. Removal of Existing Equipment The Contractor shall:
• Disconnect existing generator and ATS equipment.
• Remove existing generator, transfer switch, wiring, and associated components as necessary.
• Properly dispose of removed equipment and materials in accordance with all federal, state, and local regulations.
• Recycle materials whenever possible.
All demolition debris shall be removed from the site.
Generator Supply & Install, Lassen Volcanic National Park Page 3 of 5
D. Installation The Contractor shall provide complete installation of the standby power system including:
• Placement and mounting of the generator.
• Installation of ATS.
• Electrical connections between utility service, ATS, generator, and facility distribution system.
• Fuel system connections and modifications as required.
• Grounding and bonding in accordance with current National Electrical Code (NEC) requirements.
• Conduit, conductors, fittings, and accessories required for a complete installation.
• Structural or mounting modifications required to accommodate the new equipment.
• Concrete pad repair, modification, or replacement if required to support the new generator.
All work shall comply with:
• National Electrical Code (NEC)
• National Fire Protection Association (NFPA) standards
• Manufacturer installation requirements
• OSHA requirements
• Applicable federal, state, and local regulations
E. Permits and Inspections The Contractor shall obtain and pay for all permits, inspections, certifications, and approvals required for completion of the work unless otherwise directed by the Contracting Officer.
The Contractor shall coordinate all inspections and provide copies of approvals to the Government.
F. Startup, Testing, and Commissioning Upon completion of installation, the Contractor shall:
• Perform manufacturer-recommended startup procedures.
• Verify proper operation of the generator and ATS.
• Conduct simulated utility power outage testing.
• Demonstrate automatic transfer and retransfer functions.
Generator Supply & Install, Lassen Volcanic National Park Page 4 of 5
• Verify voltage, frequency, and load performance.
• Perform a minimum two-hour operational test under facility load or approved load-bank conditions.
The Contractor shall correct any deficiencies identified during testing at no additional cost to the Government.
G. Training
The Contractor shall provide on-site operator training for designated National Park Service personnel.
Training shall include:
• Normal operation
• Emergency operation
• Routine maintenance requirements
• Safety procedures
• Warranty procedures
H. Closeout Documents
Prior to final acceptance, the Contractor shall provide:
• Manufacturer warranties.
• Equipment manuals.
• Maintenance manuals.
• Startup and commissioning reports.
• Test reports.
• As-built drawings reflecting final installation.
• Recommended maintenance schedule.
5. WARRANTY
• The Contractor shall warrant all labor, installation workmanship, and materials for a minimum period of one (1) year from the date of final acceptance.
• Manufacturer warranties shall be transferred to the Government upon project completion.
• Any defects occurring during the warranty period shall be corrected by the Contractor at no additional cost to the Government.
Generator Supply & Install, Lassen Volcanic National Park Page 5 of 5
6. SAFETY REQUIREMENTS
• The Contractor shall be responsible for site safety and shall comply with all OSHA requirements and National Park Service safety regulations.
• The Contractor shall maintain a clean work site and protect Government property from damage during all phases of the work.
• Any damage caused by the Contractor shall be repaired at no cost to the
Government.
7. CONTRACTOR RESPONSIBILITY
The Contractor shall furnish all labor, supervision, materials, equipment, transportation, tools, permits, testing equipment, and incidentals necessary to provide a complete, fully operational standby generator system.
No additional compensation shall be provided for work reasonably required to achieve a complete and functional installation whether or not every individual component is specifically identified within this Statement of Work.
8. DELIVERY & FINAL ACCEPTANCE
The Contractor shall coordinate all site visits, deliveries, outages, and installation activities with the Contracting Officer’s Representative at least seven (7) calendar days in advance.
Final acceptance will occur only after:
• Installation is complete.
• All testing has been successfully completed.
• Required documentation has been submitted.
• Training has been completed.
• The generator and ATS are fully operational and accepted by the Contracting
Officer’s Representative (COR).
9. PARK CONTACT / CONTRACTING OFFICERS REPRESENTATIVE:
Chief of Maintenance: Joe Pettegrew, Ph: Work Cell: (530) 200-3065, joe_pettegrew@nps.gov
10. PAYMENT:
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP) at https://www.ipp.gov/. The Contractor shall submit all invoices through www.ipp.gov within 30 days of work completion. Failure of the contractor to upload an attached copy of the invoice and any requested documentation through IPP.gov will result in invoice being rejected.
mailto:joe_pettegrew@nps.gov