5/19/2023
Description Quantity Unit Unit Price Extended Price
Required Work ‐ Ebenezer Parking Area Section A, Route 0906
Mobilization 1 LPSM
Remove and Replace 2 inches asphalt pavement 775 SQYD
Wheel Stops 21 EACH
Restripe Parking Spaces (21 spaces) 650 LNFT
Temporary Traffic Control 1 LUMP
TOTAL (REQUIRED WORK)
Elective 1 Work ‐ Ebenezer Parking Area Section B, Route 0906
Remove and Replace 2 inches asphalt pavement 1150 SQYD
Wheel Stops 22 EACH
Restripe Parking Spaces (22 spaces) 620 LNFT
Install Accessible Parking Symbols 2 EACH
TOTAL (ELECTIVE 1 WORK)
Elective 2 Work ‐ Fire Station No. 6 Parking Area, Route 0905
Remove and Replace 2 inches asphalt pavement 275 SQYD
Restripe Parking Spaces (4 spaces) 110 LNFT
Temporary Traffic Control 1 LUMP
TOTAL (ELECTIVE 2 WORK)
Remove and Replace 2 inches asphalt pavement 920 SQYD
Restripe Parking Spaces (22 spaces) 600 LNFT
Install Accessible Parking Symbols 2 EACH
Temporary Traffic Control 1 LUMP
TOTAL (ELECTIVE 3 WORK)
Ebenezer Parking Area Section A 6 EACH
TOTAL (ELECTIVE 4 WORK)
TOTAL (REQUIRED WORK)
TOTAL (w/ Elective 1 WORK)
TOTAL (w/ Elective 1‐2 WORK)
TOTAL (w/ Elective 1‐3 WORK)
TOTAL (w/ Elective 1‐4 WORK)
Elective 4 Work ‐ Bollard Replacement
This is a lump sum contract. Individual items of work will not be measured for payment.
PRICE SCHEDULE
PARKING AREA REPAIR AND REHABILITATION
Martin Luther King, Jr. National Historical Site
Fulton County, Georgia
Elective 3 ‐ Maintenance Shop Parking A, Route 0903AZ