B08_140P5123Q0034_Attch_0003_Bid_Schedule_MALU_Pavement_Preserve_EBC_and_Fire_Station.pdf

PDF 267 KB Posted

Attached to
Repair Road
Solicitation number
140P5123Q0034
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/19/2023

Description Quantity Unit Unit Price Extended Price

Required Work ‐ Ebenezer Parking Area Section A, Route 0906

Mobilization 1 LPSM

Remove and Replace 2 inches asphalt pavement 775 SQYD

Wheel Stops 21 EACH

Restripe Parking Spaces (21 spaces) 650 LNFT

Temporary Traffic Control 1 LUMP

TOTAL (REQUIRED WORK)

Elective 1 Work ‐ Ebenezer Parking Area Section B, Route 0906

Remove and Replace 2 inches asphalt pavement 1150 SQYD

Wheel Stops 22 EACH

Restripe Parking Spaces (22 spaces) 620 LNFT

Install Accessible Parking Symbols 2 EACH

TOTAL (ELECTIVE 1 WORK)

Elective 2 Work ‐ Fire Station No. 6 Parking Area, Route 0905

Remove and Replace 2 inches asphalt pavement 275 SQYD

Restripe Parking Spaces (4 spaces) 110 LNFT

Temporary Traffic Control 1 LUMP

TOTAL (ELECTIVE 2 WORK)

Remove and Replace 2 inches asphalt pavement 920 SQYD

Restripe Parking Spaces (22 spaces) 600 LNFT

Install Accessible Parking Symbols 2 EACH

Temporary Traffic Control 1 LUMP

TOTAL (ELECTIVE 3 WORK)

Ebenezer Parking Area Section A 6 EACH

TOTAL (ELECTIVE 4 WORK)

TOTAL (REQUIRED WORK)

TOTAL (w/ Elective 1 WORK)

TOTAL (w/ Elective 1‐2 WORK)

TOTAL (w/ Elective 1‐3 WORK)

TOTAL (w/ Elective 1‐4 WORK)

Elective 4 Work ‐ Bollard Replacement

This is a lump sum contract. Individual items of work will not be measured for payment.

PRICE SCHEDULE

PARKING AREA REPAIR AND REHABILITATION

Martin Luther King, Jr. National Historical Site

Fulton County, Georgia

Elective 3 ‐ Maintenance Shop Parking A, Route 0903AZ

File details come from the government source that posted it. Updated .