B03_Attachment_2_-_DOL_Wage_Rate_Determination.pdf

PDF 2 MB Posted

Attached to
BISO REPLACE EAST RIM SHOP ROOF
Solicitation number
140P5325R0021
Issued by

About this file

This document is a Davis-Bacon General Wage Determination for building construction projects in Scott and Warren Counties, Tennessee, dated 01/03/2025. The wage determination specifies prevailing wage rates for various construction job classifications, including Power Equipment Operators (Crane at $36.25/hour), Power Equipment Operators (Backhoe/Trackhoe/Excavator/Bulldozer at $33.23/hour), Sheet Metal Workers at $34.37/hour, and other trades such as Carpenters, Electricians, Laborers, and Plumbers.

The document provides detailed information about wage rates under Executive Orders 14026 and 13658, which establish minimum wage requirements for federal contractors. It explains how wage rates are determined, including union rates, survey rates, and state-adopted rates. The document also outlines the appeals process for wage determinations, with specific instructions for submitting requests to the Branch of Wage Surveys at the U.S. Department of Labor. The wage rates are applicable to building construction projects (excluding single-family homes) and will be adjusted annually.

View the file

Other files

File Type Posted
A04_ATTACHMENT_1_-_SOW.pdf PDF
Sol_140P5325R0021.pdf PDF
B04_ATTACHMENT_3_-_PAST_PERFORMANCE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .