This document is a Statement of Work (SOW) for replacing the roof of the East Rim Facilities Shop at Big South Fork National River and Recreation Area in Oneida, Tennessee. The project involves completely removing and replacing the deteriorated metal roofing system, including 2" standing seam metal panels (24" wide, 24-gauge), new insulation, stack boots, flashing, and rake edge. The contractor will have 75 calendar days to complete the work from the notice to proceed, with the project located at 4721 Leatherwood Road. The roofing replacement is critical for continued park operations, as the existing roof panels from 1988 have failed after years of patchwork repairs and caused damage to interior finishes and equipment. The project is identified by PMIS Number 312919A and is part of the National Park Service's Interior Region 2, South Atlantic Gulf North Major Acquisition Buying Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Big South Fork National River and Recreation Area

Oneida, Tennessee

Statement of Work “Replace East Rim Facilities Shop Roof and

Components”

March 28, 2025

NATIONAL PARK SERVICE

INTERIOR REGION 2, SOUTH ATLANTIC GULF

NORTH MAJOR ACQUISITION BUYING OFFICE

SOW Format

1. BACKGROUND:

2. PROJECT IDENTIFIERS:

3. PLACE OF PERFORMANCE:

4. PERIOD OF PERFORMANCE:

5. SCOPE:

6. TASK:

7. GENERAL WORK REQUIREMENTS:

8. MANAGEMENT:

9. SAFETY AND ENVIRONMENTAL COMPLIANCE:

10. INSURANCE:

11. CONTRACTOR USE OF SITE:

12. MOTOR VEHICLE AND TRAFFIC REGULATIONS:

13. EMPLOYEES BADGES/PARKING:

14. NON-PAYMENT FOR ADDITIONAL WORK:

15. CONFLICT OF INTEREST:

16. INSPECTION:

17. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION:

18. SECURITY:

19. TRAVEL:

20. FOOD STORAGE GUIDELINES:

21. PROJECT PERSONNEL:

1. BACKGROUND:

Big South Fork National River and Recreation Area (hereinafter referred to as “BISO”) is located along the eastern portion of the border separating Kentucky and Tennessee.

Encompassing and protecting approximately 125,000 acres, the park was established by Congress on March 7, 1974. The park’s primary mission is to “provide management for the National Area so that natural and cultural resources are preserved and protected for the use and enjoyment of present and future generations”. The Big South Fork of the Cumberland River and its tributaries are preserved in a free-flowing condition, providing a broad range of recreational opportunities which benefit the economically challenged region.

This project will utilize contract labor to remove and replace the deteriorated metal roofing system on the East Rim Facilities Shop, a critical operational hub for Facility Management at BISO. The structure serves as a base for office staff, computer systems, vehicle bays, and the carpenter’s shop. The original roof panels, installed in 1988, have failed after years of patchwork repairs. Replacement will include in-kind 2" standing seam metal panels (24" wide, 24-gauge or better), new insulation, stack boots, flashing, and rake edge. Saturated insulation and failing roofing components have resulted in damage to interior finishes and equipment, making this a high-priority asset investment for continued park operations.

2. PROJECT IDENTIFIERS:

PMIS NUMBER: 312919A

PROJECT TITLE: “East Rim Facilities Shop Roof and Components”

3. PLACE OF PERFORMANCE:

Work will take place the East Rim Facilities Complex located at 4721 Leatherwood Road, Oneida, Tennessee 37841

4. PERIOD OF PERFORMANCE:

The contractor shall have no more than 75 calendar days to complete all required taskings once the offeror receives the notice to proceed, with the only exceptions being unforeseen events beyond the contractor's control and/or delays that are caused by the National Park Service.

5. SCOPE:

The National Park Service will contract a qualified roofing contractor to remove and replace the complete roofing system of the East Rim Facilities Shop located at Big South Fork National River and Recreation Area (BISO). This facility serves as a central hub for Facility Management operations across BISO, Obed Wild and Scenic River (OBRI), and the Oak Ridge site of Manhattan Project National Historical Park.

Work shall include the full removal of existing 2.5" standing seam roof panels, saturated insulation, flashing, stack boots, rake edge, and any other associated roofing components. The contractor shall furnish and install new 2.5" standing seam metal roofing panels (24" wide, 24-gauge minimum), new insulation, and all necessary trim, flashing, and weatherproofing components required to deliver a complete and functional roofing system.

All roof panels shall be replaced in-kind to match the structural design of the existing steel-framed building. The new roofing system must be properly sealed and flashed to eliminate all active leaks and prevent future water infiltration. The contractor shall ensure that work is completed with minimal disruption to occupied workspaces within the facility. All materials, supplies, labor, services, and equipment necessary to fully execute this project shall be provided by the contractor at no additional cost to the government.

6. TASK:

• Removal and Demolition o The contractor shall remove all existing 2" standing seam metal roofing panels from the entire roof surface of the East Rim Facilities Shop.

o The contractor shall remove and dispose of all existing insulation material located beneath the roofing system, regardless of condition.

o The contractor shall remove all existing flashing, rake edge, stack boots, fasteners, trim, moisture barrier, and any other associated roofing components necessary for full roof system replacement.

o The contractor shall remove and properly dispose of all demolition materials, including but not limited to roofing panels, insulation, underlayment, fasteners, and flashing. All debris shall be transported offsite to an appropriate disposal facility.

o The contractor shall implement fall protection, debris containment, and pedestrian protection throughout demolition.

o The contractor shall notify the COR immediately upon discovery of any structural damage or compromised framing.

o The National Park Service will be responsible for any required structural repairs using BISO maintenance staff.

• Roof System Installation o The contractor shall furnish and install a synthetic roofing underlayment or equivalent moisture barrier over the entire roof deck in accordance with manufacturer specifications and applicable building codes.

o The contractor shall furnish and install new 2" standing seam metal roof panels, 24" wide, with a minimum thickness of 24 gauge.

o The contractor shall ensure that all panels are installed in-kind and properly aligned to match the original architectural layout.

o The contractor shall install all required flashing, rake edge, trim, boots, closures, and ridge caps in accordance with manufacturer specifications.

o The contractor shall furnish and install new insulation across the entire roof area, equivalent in R-value to the original system, unless otherwise specified by the

COR.

o The contractor shall install all fasteners and hardware using corrosion-resistant materials compatible with the panel system.

o The contractor shall ensure the roofing system is weathertight and free of leaks upon final inspection.

• Site Coordination and Protection o The contractor shall maintain safe and continuous access to occupied areas of the facility during the performance of all work.

o The contractor shall coordinate with the COR to schedule work in phases if needed to reduce disruption to operations.

o The contractor shall protect all HVAC components, rooftop equipment, and sensitive systems during removal and installation.

o The contractor shall implement daily cleanup of the job site and maintain a neat and professional work environment.

• Final Requirements and Warranty o The contractor shall repair or restore, at no cost to the government, any damage caused to the structure or adjacent facilities as a result of roofing operations.

o The contractor shall provide a minimum 1-year workmanship warranty on all labor and installed components.

o The contractor shall provide the COR with material submittals, product data sheets, and manufacturer certifications for approval prior to installation.

o The contractor shall notify the COR upon reaching substantial completion for final inspection and punch list review.

o The National Park Service will coordinate facility access, designate material staging areas, and approve final materials prior to installation.

7. GENERAL WORK REQUIREMENTS:

Work Hours: 8:00 am to 5:30 pm (Eastern Time)

Monday through Friday, excluding federal holidays.

Contractor shall coordinate the on-site work schedule with the Contracting Officer and the COR five working days prior to the performance start date. The COR may be reached by office or mobile phone during normal business hours. Work outside of normal business hours must be requested 14 days prior and shall pre-approved by the Contracting Officer and the COR. All site visits and correspondence shall take place during the listed work hours above.

8. MANAGEMENT:

The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on time completion of this contract.

9. SAFETY AND ENVIRONMENTAL COMPIANCE:

• The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), state, local, safety, laws, and all pertinent provisions of the contract.

• The contractor shall comply with pertinent Environmental Protection Agency laws.

• All tools, equipment and other related materials shall be removed at the end of each workday and the area shall be left neat and clean.

• The contractor shall comply with all provisions of NHPA and NEPA compliance documents that will be provided by Big South Fork staff.

• The BISO Safety Officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten government and contractor employees or damage to government property.

• The contractor shall immediately report to the Contracting Officer, COR and BISO Safety Officer all accidents resulting in employee injury, death, or damage to property while performing this contract.

• The contractor shall supply a site/project specific safety plan with all submittal packages.

10. INSURANCE:

• The Contractor shall be insured in accordance with Tennessee insurance regulations and pertinent provisions of the Contract. The government is not responsible for damage or theft to Contractor’s equipment, vehicles, tools, or materials or their employees and any personal property brought on site. The government will not accept any liability due to Contractor employee negligence.

• Workers Compensation- The contractor shall furnish proof of worker’s compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of Tennessee.

• Liability- Contractor shall maintain a level of insurance that will protect the Contractor and Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

11. CONTRACTOR USE OF SITE:

Contractor shall have limited use of the construction site for construction-related operations only.

Limited use of premises to areas within the Contract indicated in the specifications. Do not disturb portions of the project site beyond areas in which the work is indicated. Contractor will prevent damage to natural surroundings. Damage to natural surroundings will be restored through NPS-approved methods for repairing or replanting, at no additional cost to the government.

12. MOTOR VEHICLE AND TRAFFIC REGULATIONS:

Contractor, sub-contractor, and material supplier employees (altogether referred to as “contractor employees” in paragraphs 12, 13, 21 and 23) operating motor vehicles shall possess a valid driver's license. Permits, licenses, registrations and proof of insurance documents shall be always maintained in all contractor employee vehicles and made available upon request. Contractor employees shall always comply with federal vehicle motor laws requiring seat belts be worn.

Contractor employees shall adhere to the posted speed limits. Contractor employees are expected to comply with all BISO regulations.

13. EMPLOYEES BADGES/PARKING:

All contractor employees shall comply with parking procedures published for BISO. Contractor employees shall return any BISO issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.

14. NON-PAYMENT FOR ADDITIONAL WORK:

Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than the appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the Contractor.

Only the appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

15. CONFLICT OF INTEREST:

The contractor shall not employ off-duty COR’s or other government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

16. INSPECTION:

The Government will conduct inspection upon completion of required services. Final payment will be processed upon the Government confirming that all contract performance and administrative requirements have been satisfactorily completed and any deficiencies or non-compliant work have been satisfactorily corrected.

17. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR

INFORMATION:

NONE

18. SECURITY:

Replacement of Contractor Employee for Security Reasons: The Government retains the right to remove contractor employees from park property for security reasons, regardless of prior clearances.

19. TRAVEL:

Contractor is encouraged to make a site visit prior to bidding on the project.

20. FOOD STORAGE GUIDELINES:

All Contractor employees shall comply with BISO food storage guidelines. All food items must be stored in a hard-sided vehicle or in a food storage locker and must never be left unattended.

"Food" includes any item with a scent, regardless of packaging. This may include items that you do not consider food, such as canned goods, bottles, drinks, soaps, cosmetics, toiletries, trash, ice chests (even when empty), and unwashed items used for preparing or eating meals. Food shall be disposed of in a designated bear proof refuse container provided by the National Park Service.

21. PROJECT PERSONNEL:

Facilities Maintenance Division Chief: Kenneth Gilreath Phone: (423)569-7319 Email: kenneth_gilreath@nps.gov

Project Management Branch Chief / COR: Steve Wilmot Phone: (423)569-7335 Email: stephen_wilmot@nps.gov

Building and Utilities Branch Chief: Chris Henry Phone: (423)569-7336 Email: christopher_henry@nps.gov