About this file

Summary

This Invitation to Bid (ITB #B026-59) is issued by the City of Meriden, Connecticut for partial roof replacement and repairs at the Board of Education Maintenance Facility located at 998 North Colony Road, Meriden. The project scope includes removal and offsite disposal of hazardous materials, removal of existing membrane roofing systems and insulation, removal and replacement of deteriorated roof decking and wood blocking, removal of existing skylights, installation of new roof hatches and safety railings, installation of new EPDM membranes and insulation, installation of new flashings and trim metalwork including scuppers, and offsite disposal of all removed materials. The project was released on May 21, 2026, with a mandatory pre-bid meeting scheduled for June 2, 2026, at 10:00 a.m. at the maintenance facility. The question submission deadline is June 17, 2026, at 4:00 p.m., and bids must be submitted electronically via the City eProcurement Portal no later than June 24, 2026, at 11:00 a.m. Bidders must maintain the building in weathertight condition during construction, accommodate full owner occupancy with administrative and maintenance staff present, and provide full-time on-site supervision.

Bids must include a bid bond equal to ten percent of the bid amount, and the successful bidder will be required to provide labor and material payment bonds and performance bonds equal to one hundred percent of the contract price. The City of Meriden is exempt from federal excise taxes and Connecticut sales and use taxes, which shall not be included in bid pricing. This contract is subject to state contract compliance requirements with spending allocation goals requiring a minimum of twenty-five percent of the state-funded portion to be awarded to Small Business Enterprises (SBE) and a minimum of 6.25 percent to Minority-, Women-, and/or Disabled-owned businesses (M/W/DisBE). Prevailing wage requirements apply, and the contract is subject to Davis-Bacon Act labor standards and Build America Buy America Act domestic content requirements. All contractor and subcontractor personnel must submit to background checks and wear security badges during construction. The form of agreement will be via purchase order and standard construction agreement including EJCDC terms. Payment will be made not less than thirty days following completion of services.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/meridenct

City of Meriden

Purchasing Department

142 East Main St. Room 210

Meriden, CT 06450

B026-59 BOE MAINTENANCE FACILITY ROOF

REPLACEMENT

Project ID: B026-59

RELEASE DATE: May 21, 2026

RESPONSE DEADLINE: June 24, 2026, 11:00 am

Please refer to the project timeline in this document for all important deadlines.

Invitation To Bid #B026-59

Title: B026-59 BOE Maintenance Facility Roof Replacement

Table Of Contents

1. LEGAL NOTICE

2. INFORMATION TO BIDDERS

3. SCOPE OF WORK

4. PRICING PROPOSAL

5. VENDOR SUBMISSION FORMS

Attachments:

A - General Insurance

B - Construction Contract-Sample

C - EJCDC General & Supplemental

D - HOLD for state prevailing wage

E - Prevailing Wage Info Packet

F - Sample Performance Bond

G - Sample Payment Bond

H - CHRO

I - Project Manual

J - Drawings

LEGAL NOTICE

INVITATION TO BID

The City of Meriden is accepting electronic bids for:

B026-59 BOE Maintenance Facility Roof Replacement

The City of Meriden is soliciting bids in seeking the services of a contractor to furnish labor & materials in repairing the roof at 998 North Colony Road, Meriden.

Bids shall be submitted as electronic bids per specifications obtained via the City eProcurement

Portal: https://procurement.opengov.com/portal/meridenct and on the State of Connecticut Department of

Administrative Services website (https://webprocure.proactiscloud.com).

Bids may be received up to but not later than 11:00 am, Wednesday, June 24, 2026 via the City eProcurement

Portal located at https://procurement.opengov.com/portal/meridenct. The City eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct by way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

A Mandatory Pre-Bid Meeting will be held on Tuesday, June 2, 2026, 10:00 am @ the Board of

Education Maintenance Facility, 998 North Colony Rd, Meriden CT 06450.

Each bid shall be accompanied by a Bid Bond in the amount of Ten (10%) percent of the amount bid.

The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden. No bidder may withdraw its bid within sixty (60) days of the date of the bid opening.

Labor and Material Payment Bond and a Performance Bond for One Hundred Percent (100%) of the contract price, with a corporate surety approved by the City of Meriden, will be required of the lowest responsible bidder.

The attention of bidders is call to the requirement for minimum wage rates to be paid under this contract.

This bid/contract is subject to state contract compliance requirements, including spending allocation goals (25%

SBE and 6.25% M/W/DisBE) and non-discrimination requirements enforced by the CHRO.

The City of Meriden is an Affirmative Action/Equal Opportunity Employer. Disadvantaged, minority, small, and women business enterprises are encouraged to respond.

Rawle Dummett Purchasing Officer City of Meriden, CT 06450-8022 Dated: May 21, 2026 https://procurement.opengov.com/po1tal/meridenct https://webprocure.proactiscloud.com/

INFORMATION TO BIDDERS

1. SUMMARY

The City of Meriden is seeking contractors to make necessary repairs and partial roof replacement at the Board of Education Maintenance Facility located at 998 North Colony Road, Meriden.

2. TIMELINE

Project Release Date: May 21, 2026

Pre-Bid Meeting (Mandatory): June 2, 2026, 10:00am

BOE Maintenance Facility 998 No Colony Road Meriden CT 06450

Question Submission Deadline: June 17, 2026, 4:00pm

Submission Deadline: June 24, 2026, 11:00am

3. BIDDING PROCEDURES

The City will only be accepting electronic submissions of bids and proposals. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. By way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

Bids are due for submission no later than 11:00 am, Wednesday, June 24, 2026.

4. BIDS

Bids are to be submitted as follows:.

a. Bids must be made out and signed in the corporate, or other, name of Bidder, and must be fully and properly executed by an authorized person.

b. The City of Meriden, CT will only be accepting electronic submissions of the enclosed bid sheet via the City eProcurement portal partner, OpenGov: https://procurement.opengov.com/portal/meridenct.

c. Bids received later than the time and date specified will not be considered.

d. Amendments to or withdrawal of bids received later than the date and time set forth in the bid opening will not be considered.

5. EXAMINATION OF BIDDING DOCUMENTS

Bidders are to examine all documents and visit the site in order to make a thorough examination of the conditions so that the bidder may familiarize itself with all of the existing requirements, conditions, and difficulties that will affect the execution of the work in order to determine the amount of work necessary to carry out the true intent of the specifications and work shown on the drawings.

The City of Meriden and its agents do not have any responsibility for the accuracy, completeness, or sufficiency of any bid document obtained from any other source other than from the City eProcurement Portal:

https://procurement.opengov.com/portal/meridenct. Obtaining documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining documents from any other source may also result in failure to receive any addenda, corrections, or other revisions to the documents that may be issued.

No request shall be honored if such request is made less than seven (7) calendar days prior to the date fixed for the opening of bids. Any and all such interpretations, and any supplementary instructions, will be in the form of a written addenda to the specifications which, if issued, will be made available via the City eProcurement

Portal, located at https://procurement.opengov.com/portal/meridenct for addenda. Failure of any bidder to receive any such addenda shall not relieve any bidder from any obligations under its bid as submitted.

Bidders shall submit all inquiries regarding this bid via the City eProcurement Portal, located at https://procurement.opengov.com/portal/meridenct. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries.

6. BIDS TO REMAIN OPEN

No bidder may withdraw its bid within sixty (60) days of the date of the bid opening. Should there be reason why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the City of Meriden and the successful bidder.

7. CHRO

This contract is subject to state contract compliance requirements, including nondiscrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification as Small Business Enterprises

(“SBE”) from the Connecticut Department of Administrative Services (“DAS”). A minimum of 6.25% of the state-funded portion must be set aside for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses (“M/W/DisBE”). The contractor must demonstrate good faith effort to meet the

25% set-aside goals.

8. PREVAILING WAGES

It is determined prevailing wages are required therefore, it is expressly understood and agreed they are the responsibility and obligation of the Contractor to secure and maintain any/all prevailing wages rates.

9. TIME

Inasmuch as the contract concerns a public improvement, the provisions of the contract relating to the time of performance and completion of the work are of the essence of the contract. Accordingly, the successful bidder/contractor (“Contractor”) shall begin work on the day specified in paragraph 2.04 of the General

Conditions and shall perform the work diligently so as to permit full use not later than the first day following the construction period established in the Contract. (See paragraph 10 entitled “Liquidated Damages” of the

Construction Contract between City of Meriden, as owner, and the Contractor).

10. TAXES

The City of Meriden is exempt under Connecticut General Statutes from the payment of the excise taxes imposed by the federal government and the Sales and Use Tax of the State of Connecticut; such taxes should not be included in the bid price. Upon request, exemption certificates will be furnished to the successful bidder.

11. FAIR EMPLOYMENT PRACTICES

The Contractor shall agree that neither it or its subcontractors, except in the case of a bona fide occupational qualification or need, to refuse to hire or employ or to bar or to discharge from employment any individual or to discriminate against such individual in compensation or in terms, conditions or privileges of employment because of the individual's race, color, religious creed, age, sex, gender identity or expression, marital status, national origin, ancestry, present or past history of mental disability, intellectual disability, learning disability, physical disability, including, but not limited to, blindness or status as a veteran. The aforementioned terms are obtained from Connecticut General Statutes Section 46a-60, et seq., entitled “Discriminatory employment practices prohibited,” as amended.

12. FORM OF AGREEMENT BETWEEN CITY OF MERIDEN AND CONTRACTOR

The Agreement for the work will be via Purchase Order and Standard Construction Agreement including

EJCDC.

13. DAVIS-BACON ACT

All laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part with assistance received under this title shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis Bacon Act, as amended (40 U.S.C. 276a-276a-5); Provided, That this section shall apply to the rehabilitation of residential property only if such property contains not less than 8 units. The

Secretary of Labor shall have, with respect to such labor standards, the authority and functions set forth in

Reorganization Plan Numbered 14 of 1950 (15 F.R. 3176; 64 Stat. 1267) and section 2 of the Act of June 13, 1934, as mended (48 Stat. 948; 40 U.S.C. 276(c)).

14. BUILD AMERICA BUY AMERICA

This bid is subject to: The Build America Buy America Act, enacted as part of the Infrastructure Investment and Jobs Act on November 15, 2021, established a domestic content procurement preference for all Federal financial assistance obligated for infrastructure projects after May 14, 2022. The domestic content procurement preference requires that all iron, steel, manufactured products, and construction materials used in covered infrastructure projects are produced in the United States.

15. CITY OF MERIDEN CODE OF ETHICS

The City of Meriden has adopted a Code of Ethics located in Chapter 21 of the Code of the City of Meriden, sections 21-1 through 21-15, inclusive, which are expressly incorporated herein by reference. The terms of the https://www.hud.gov/sites/dfiles/GC/documents/Build%20America,%20Buy%20America%20Act%20Provisions.pdf

Code of Ethics shall constitute a part of any contract or agreement entered into by the City of Meriden as a result of this bid as if those terms were fully set forth in such contract or agreement.

Bidders are specifically advised that the Code of Ethics prohibits public officers and employees, as well as their immediate families and businesses, with which they are associated from participating in any transaction which is incompatible with the proper discharge of official duties or responsibilities. Bidders are also advised that the

Code of Ethics contain provisions with respect to paid contractors and former employees and officials.

BIDDERS SHOULD NOTE THAT BIDS, CONTRACTS, AND AGREEMENTS ENTERED INTO OR

AWARDED IN VIOLATION OF THE CODE OF ETHICS ARE VOIDABLE BY RESOLUTION OF

THE CITY COUNCIL OF THE CITY OF MERIDEN.

Copies of the Code of Ethics may be obtained from the office of the City Clerk or may be found online on the

City of Meriden’s website.

16. NON-COLLUSION STATEMENT

Each bidder submitting a bid to the City of Meriden for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto the sworn Non-Collusive Bid Statement, to the effect that the bidder has not colluded with any other person, firm, or corporation in the submission of the bid.

17. AWARD IN CASE OF A TIE

In the event there are two or more responsive bidders, the decision to award will be based by the following criteria and in the following order:

a. The incumbent will be awarded the bid over that of another bidder.

b. In the case of a multi-item bid, if one bidder has been awarded other items from the same bid and the other bidder has not, the bidder with the multiple awards will be awarded the bid over that of another bidder.

c. The bidder located in the State of Connecticut will be awarded the bid over that of another bidder.

d. The winner of a coin toss will be awarded the bid over that of another bidder.

The above-referenced provisions do not apply to those situations in which more than one City-based business responsible bidder has submitted bids not more than ten (10) percent higher than the lowest bid and has agreed to accept the award of the bid at the amount of the lowest bid. Under such circumstances, the provisions of the

Code of the City of Meriden, section 3-14, are controlling, as set forth under Section 8 of this ‘Information to

Bidders.’

18. AWARD OF CONTRACT

The Purchasing Officer reserves the right to make an award on the bid which, by the Purchasing Officer’s judgment and recommendation from the Meriden Board of Education following bid evaluations, best meets the specifications and is deemed to be in the best interest of the City of Meriden.

The contract will not be awarded to any corporation, firm, or individual which/who is in arrears to the City of

Meriden by debt or contract, or who is in default as security or otherwise by any obligation to the City of

Meriden.

The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden.

19. BID PROTEST PROCEDURE

In the event that any bidder wishes to protest the potential award of a bid, or any procedure of act in the advertising or soliciting of the bids, said bidder must make said protest in writing, which shall state the reason therefore and request a conference with respect thereto. Said protest must be received in the City Purchasing

Office within FIVE (5) business days after the delivery of bid results or decisions. A conference with respect to said protest shall be scheduled by the Purchasing Officer forthwith and shall be attended by him or his designee and such other persons as the Purchasing Officer and the City Manager shall require to attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The

City shall make a decision in writing within three (3) business days after said conference and forward the same to the protesting bidder forthwith. In the event that any protesting bidder wishes to take legal action against the

City, they must fully comply with all of these instructions to bidders.

20. ASSIGNMENT OF CONTRACT

No contract may be assigned without the written consent of the Purchasing Officer or designee.

21. PERMITS

The Contractor shall be responsible for obtaining any and all necessary permits required by the City of Meriden prior to the commencement of work. The Contractor may contact the City of Meriden Building Department for permit information at (203) 630-4091. For all other required permits, contact the City of Meriden Engineering

Department at (203) 630-4018. **Please note-This is a City of Meriden Building therefore City permit fees will be waived BUT the State Training and Education Fund Fees/Permit will NOT be waived.

22. BID PRICE AND PAYMENT

The City of Meriden is exempt from the payment of the excise taxes imposed by the Federal government and the Sales and Use Tax of the State of Connecticut under Connecticut General Statutes; accordingly, such taxes shall not be included in the bid price.

The City of Meriden, unless stated otherwise in the bidding documents or Contract, will make payment to the

Contractor not less than thirty (30) days following completion of services.

23. QUALITY

All materials, equipment, supplies, and services shall be subject to rigid inspection. If defective material, equipment, supplies, or services are discovered, the Contractor shall remove or make good such material, equipment, or supplies without extra compensation. It is expressly understood and agreed that any inspection by the City of Meriden will in no way lessen the responsibility of the Contractor or release Contractor from the obligation to perform and deliver to the City sound and satisfactory materials, equipment, supplies, or allow the cost to be deducted from any monies due it from the City of Meriden. All services will be performed in a workmanlike manner.

24. LICENSES AND CERTIFICATIONS

The successful firm(s) shall ensure that any appropriate licenses or certifications required by the State of

Connecticut are maintained for the duration of the project. The firm must meet all municipal, state and federal affirmative action and equal employment opportunity practices.

25. INSURANCE

The successful bidder shall be required to provide a Certificate of Insurance denoting general liability, automobile liability, workers compensation liability, and other coverage required by the City’s Risk Manager.

SCOPE OF WORK

PROJECT DETAILS

1. PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General Conditions and other Division 01

Specification Sections, apply to this Section.

1.2 PROJECT DESCRIPTION

A. The Work of the Project is defined by the Contract Documents and consists of a partial roof replacement at an existing building.

B. The Work includes, but is not limited to, the following:

1. Removal and offsite disposal of hazardous materials.

2. Removal of existing membrane roofing system, insulation, cant strips and tapered edges,and metal flashings.

3. Removal and replacement of existing roof accessories.

4. Removal and replacement of deteriorated roof decking and wood blocking.

5. Removal and disposal of existing skylights, and structural deck infill to match existing assembly.

6. Provision and installation of new roof hatch and safety railing.

7. Removal and replacement of existing roof drains and related piping and insulation.

8. Provision and installation of EPDM membranes, underlayment, and flat and tapered insulations.

9. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified, including new scuppers.

10. Offsite disposal of all removed materials.

1.3 CONTRACTOR USE OF PREMISES

A. Limits on Use of Site: Limit use of the premises to construction activities in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Confine operations to as small work areas and accessways as possible. As much as possible and without damage to the finishes, doors, and related building systems, access the project area via the service doors designated by Owner.

C. Keep driveways and entrances serving the premises clear and available to the Owner and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.

D. Maintain existing egress patterns, exit doors, and means of egress during construction, which will include the provision of temporary walkways, sidewalks, or other means necessary to provide adequate life safety for the building occupants, particularly at exitways which must continue to be open and serviceable while adjacent construction activity occurs.

E. Maintain existing site sidewalks and accessible ramp

F. Use of the Existing Building: Maintain the existing building in a weathertight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period.

1. Contractor is responsible to secure project area/site from intrusions during unoccupied (after hours) period of time. Any temporary doors and /or window coverings that may be necessary to complete repairs are the Contractors responsibility to furnish and install as part of the project scope.

1.4 OWNER OCCUPANCY

A. Full Owner Occupancy: The Owner's administrative and maintenance staff will occupy the site and existing building during the entire construction period, with the possibility of children on site during the school year. Cooperate with the Owner during construction operations to minimize conflicts and facilitate

Owner usage. Perform the Work so as not to interfere with the Owner's operations. Pre-schedule construction operations with the Owner for areas that must be evacuated for extended periods, giving the

Owner the opportunity to relocate administrative or educational operations to non-affected areas.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

1.5 SPECIAL REQUIREMENTS

A. The Contractor shall ensure that all work performed is done so in a safe manner and that all his/her employees shall adhere to all applicable safety procedures and practices at all times. There may be children and staff in the vicinity of the work area during normal working hours. The Contractor shall be aware at all times that additional safety considerations should be taken. Particular care shall be taken by the Contractor, Subcontractors and all those in their employ, that all tools, equipment, ladders, etc. are never left unsupervised.

B. Under no circumstances shall the buildings' occupants be subjected to excessive construction noise or vibrations, nor shall they be subject to fumes, odors, or other deleterious effects of the operation. Should material delivery, demolition or construction operations, inclement weather, or related schedule conditions produce this situation (as determined by the Owner), the Contractor shall be required to suspend operations that produce the offending effects until such time as the building is not occupied, or as approved by the Owner.

C. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances inside the building or on the grounds is not permitted. Strict adherence to the regulations will be enforced for the entire duration of the construction.

D. Site Security – Identification Badges

1. The Contractor shall provide a list of all contact persons. The list shall include each trade, name of Contractor, contact person(s), phone numbers, fax numbers, Federal Employer Identification

Number (FEIN), social security number if FEIN is not available, and Connecticut Tax Registration number.

2. Prior to the start of work all Contractor and Sub-Contractor personnel assigned to perform work shall be required to fill out and submit to a background check at a cost provided by the Contractor.

All information shall be submitted to the City of Meriden. Information for background check includes the following:

a. Identity Verification

b. Criminal Background

c. Additional checks as deemed warranted

3. Security badges will be worn by all project personnel during construction activities. The

Contractor will provide badges at no cost to the Owner. The Contractor will be responsible for monitoring the display of badges, including those of the personnel of all subcontractors and visitors to the project site.

E. Public Health Emergency:

1. The Contractor shall anticipate and incorporate in their Bids all potential costs related to a public health emergency such as the COVID-19/Coronavirus Pandemic, including rules, regulations, and recommendations issued by public authorities. The potential costs may include, but are not limited to, costs related to social distancing, manpower levels, project scheduling, construction coordination, material/product supplies and delivery delays, material escalation costs, increased subcontractor/supplier costs, loss of productivity and inefficiency costs, extended general conditions costs, and any other potential costs.

F. Overtime: The Contractor must include within their Base Bid all overtime, nights, holidays, and weekends as required to meet the Project Completion date.

G. Supervision: The Contractor must provide full-time, properly qualified on-site supervision for th entire duration of the project, while workpersons are on site.

H. Equipment: All equipment and tools to perform work are to be provided by the Contractor. No equipment and tools will be available from the Owner.

2. PROJECT MANUAL

Please refer to the complete PROJECT MANUAL which is included as Attachment I.

PRICING PROPOSAL

BID FORM

As required by the Base Bid, should inadequate, deteriorated, or damaged materials be required to be removed as determined by the Architect or Owner, the cost to remove and replace the referenced material, (or credit for specified material not provided or installed) including all labor, material, equipment, and related furnishings is as follows:

Line Item Description Unit of Measure Unit Cost

1 Black tar on metal deck under roofing layers removal and disposal as ACM less than 1 percent-OSHA regulated removal sf

2 Presumed PCB bulk product waste- grey caulking compound on metal flashing lf

3 Presumed PCB bulk product waste- white caulking compound on metal flashing lf

4 Metal roof deck, thickness to match existing roof deck to be removed (including deteriorated roof deck removal, credit and add) sf

5 Add pressure treated wood blocking, as specified, cut to fit around roof structure and systems installed bf

6 Deduct pressure treated wood blocking, as specified, cut to fit around roof structure and system installed bf

ALLOWANCES: (SEE SECTION 012100)

Line Item Description Total Amount Unit Cost

Allowance #1 Metal Deck Replacement (part of Base Bid) Total

VENDOR SUBMISSION FORMS

1. NON-COLLUSIVE STATEMENT/AFFIDAVIT*

Please download the document below, complete and upload. **MUST be Notarized**

• Non-Collusive_Bid_Statement...

*Response required

2. BIDDER'S QUALIFICATION STATEMENT*

Please download the document below, complete and upload.

• Bidders_Qualification.pdf

*Response required

3. SAMPLE BID BOND

Please download the document below, complete and upload.

• Bid_Bond.pdf

4. FORM OF SURETY GUARANTY*

Please download the below documents, complete and upload.

• Surety.pdf

*Response required https://government-project.s3.us-west-2.amazonaws.com/185261/27e40bae-fea8-4589-88ec-673f947be0c3_Non-Collusive_Bid_Statement.pdf https://government-project.s3.us-west-2.amazonaws.com/185261/0b547ce7-2bce-4130-af34-e66f19a25d3d_Bidders_Qualification.pdf https://government-project.s3.us-west-2.amazonaws.com/185261/5a51b0db-6545-4b9b-b798-bcdf7e278e7d_Bid_Bond.pdf https://government-project.s3.us-west-2.amazonaws.com/185261/b98ed397-2abd-4ad5-ac4f-76d986d778c2_Surety.pdf

LEGAL NOTICE
INFORMATION TO BIDDERS
1. SUMMARY
2. TIMELINE
3. BIDDING PROCEDURES
4. BIDS
5. EXAMINATION OF BIDDING DOCUMENTS
6. BIDS TO REMAIN OPEN
7. CHRO
8. PREVAILING WAGES
9. TIME
10. TAXES
11. FAIR EMPLOYMENT PRACTICES
12. FORM OF AGREEMENT BETWEEN CITY OF MERIDEN AND CONTRACTOR
13. DAVIS-BACON ACT
14. BUILD AMERICA BUY AMERICA
15. CITY OF MERIDEN CODE OF ETHICS
16. NON-COLLUSION STATEMENT
17. AWARD IN CASE OF A TIE
18. AWARD OF CONTRACT
19. BID PROTEST PROCEDURE
20. ASSIGNMENT OF CONTRACT
21. PERMITS
22. BID PRICE AND PAYMENT
23. QUALITY
24. LICENSES AND CERTIFICATIONS
25. INSURANCE
SCOPE OF WORK
1. PART 1 - GENERAL
2. PROJECT MANUAL
PRICING PROPOSAL
VENDOR SUBMISSION FORMS
1. NON-COLLUSIVE STATEMENT/AFFIDAVIT*
2. BIDDER'S QUALIFICATION STATEMENT*
3. SAMPLE BID BOND
4. FORM OF SURETY GUARANTY*

File details come from the government source that posted it. Updated .