B026-09_-EJCDC_SUPPLEMENTAL_GENERAL_COND_-_REVISED_for_2007_edition_-SAMPLE.pdf

PDF 197 KB Posted

Attached to
B026-09 Station 5 Boiler Replacement
Solicitation number
B026-09
Issued by
New Haven County, Connecticut

About this file

Summary of File

This document is a Supplemental General Conditions agreement for the City of Meriden, Connecticut, governing the boiler replacement project at Fire Station #5. The project requires a contractor to furnish all labor and materials for a comprehensive boiler replacement, including installation of a new gas-fired condensing boiler (Lochinvar Knight XL Model FTXL1000N-120 or approved equivalent) and associated mechanical, electrical, and plumbing systems, with temporary domestic hot water provision during construction. The mandatory site inspection is scheduled for November 19, 2025, at 10:00 a.m., with the deadline for submitting questions set for December 3, 2025, at 4:00 p.m. Sealed electronic bids must be submitted via the City eProcurement Portal no later than 11:00 a.m. on December 10, 2025. The contract includes an 18-month guarantee period from the date of acceptance, during which any defective materials or workmanship must be repaired or replaced at no additional cost to the City.

The contractor must furnish a Performance Bond and Labor and Material Payment Bond, each in the amount of 100% of the bid, within ten days of receiving the Notice of Award. Insurance requirements are substantial, including General Liability coverage of $1,000,000 per occurrence and $2,000,000 aggregate, Auto Liability of $1,000,000 combined single limit, Umbrella/Excess coverage of $1,000,000, and Workers' Compensation at statutory limits. The City of Meriden must be named as an additional insured on all policies except Workers' Compensation. Liquidated damages are assessed at $250 per calendar day for failure to complete work within the stipulated timeline. Prevailing wage rates apply with hourly rates ranging from $21.42 to $66.72 depending on worker classification. The contractor is responsible for all costs associated with bonds, insurance, safety compliance with OSHA and Connecticut Construction Safety Act requirements, site protection, and restoration of access routes to original condition.

View the file

Other files

File Type Posted
B026-09_Station_5_Boiler_Replacement_(Addendum_#3_Revision).pdf PDF
B026-09_Station_5_Boiler_Replacement_(Addendum_#3_Revision).pdf PDF
B026-09_Station_5_Boiler_Replacement_(Addendum_#1_Revision).pdf PDF
B026-09_-EJCDC_SUPPLEMENTAL_GENERAL_COND_-_REVISED_for_2007_edition_-SAMPLE.pdf PDF
MEP_SPECIFICATION_9-15-2025.pdf PDF
Meriden_Fire_Station_#5_(09-15-2025).pdf PDF
B026-09_-_Standard_Form_of_Agreement_-_Sample.pdf PDF
TABLE_OF_CONTENTS-19120_BEMIS_ASSOC.pdf PDF
B026-09_-EJCDC_SUPPLEMENTAL_GENERAL_COND_-_REVISED_for_2007_edition_-SAMPLE.pdf PDF
B026-09_-_Standard_Form_of_Agreement_-_Sample.pdf PDF
B026-09_-_Standard_Form_of_Agreement_-_Sample.pdf PDF
TABLE_OF_CONTENTS-19120_BEMIS_ASSOC.pdf PDF
19-120_Fire_Station_#5_(Meriden)_-_Block_Load_Calculations.pdf PDF
MEP_SPECIFICATION_9-15-2025.pdf PDF
Meriden_Fire_Station_#5_(09-15-2025).pdf PDF
19-120_Fire_Station_#5_(Meriden)_-_Block_Load_Calculations.pdf PDF
MEP_SPECIFICATION_9-15-2025.pdf PDF
19-120_Fire_Station_#5_(Meriden)_-_Block_Load_Calculations.pdf PDF
Meriden_Fire_Station_#5_(09-15-2025).pdf PDF
TABLE_OF_CONTENTS-19120_BEMIS_ASSOC.pdf PDF
Project_Info_Form.pdf PDF
B026-09_Station5_Boiler_BuildingSchedule-Prev_Wages.pdf PDF
B026-09_Station5_Boiler_BuildingSchedule-Prev_Wages.pdf PDF
Project_Info_Form.pdf PDF
B026-09_Station5_Boiler_BuildingSchedule-Prev_Wages.pdf PDF
Project_Info_Form.pdf PDF
Sample_Payment_Bond.pdf PDF
Sample_Payment_Bond.pdf PDF
Sample_Performance_Bond.pdf PDF
Sample_Performance_Bond.pdf PDF
School_Insurance.pdf PDF
Prevailing_Wage_Info_Packet.pdf PDF
Sample_Payment_Bond.pdf PDF
General_Insurance.pdf PDF
Prevailing_Wage_Info_Packet.pdf PDF
Sample_Performance_Bond.pdf PDF
School_Insurance.pdf PDF
General_Insurance.pdf PDF
School_Insurance.pdf PDF
General_Insurance.pdf PDF
Prevailing_Wage_Info_Packet.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL GENERAL CONDITIONS

GENERAL CONDITIONS

The General Conditions of the Contract for Construction, EJCDC Document C-700, 2007 Edition, as bound herewith, shall be the General conditions of the Contract, except as amended by these Supplemental General

Conditions

CHANGES AND ADDITIONS TO VARIOUS ARTICLES OF THE GENERAL CONDITIONS

Article 1 Definitions

Article 1 is hereby modified as follows:

Delete the definition “Notice to Proceed”

Article 2 Preliminary Matters

Article 2.02 is modified as follows:

DELETE Article 2.02 in its entirety

Article 2.03 is modified as follows:

30th day is changed to 10th day, and delete “A Notice to Proceed…earlier”

Article 3 Reporting and Resolving Discrepancies

Article 3.03A.# - change “unless” to “that” and add knowledge thereof, or should have had knowledge of….

Article 4 Availability of lands

Article 4.01B – delete “as necessary for giving notice of or filing a mechanics or construction lien against such lands in accordance with applicable Laws & Regulations.”

Article 4.06G – Hazardous Environmental Conditions at Site - Delete in its entirety

Article 5 Bonds and Insurance

Delete Article 5 in its entirety and substitute the following:

PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND

The Contractor shall, within ten (10) days from the date of the Notice of Award, furnish the City of Meriden with a PERFORMANCE BOND and a LABOR AND MATERIAL PAYMENT BOND, both in the amount of

100% of the amount bid, conditioned upon the performance of the Contractor on all undertaking, covenants, terms, and conditions and agreements of the contract. The bond shall be in the form of the specimen bonds annexed hereto, such bonds shall be executed by the contractor and a corporate bonding company licensed, authorized, and admitted to transact such business in the State of Connecticut and named on the current list of

“Surety Companies acceptable on Federal Bonds”, as published in the “Treasury Department” listed for an amount equal to the amount of the reinsurance. Written evidence of how any excess suretyship has been placed by the surety signing the bonds shall accompany the bonds. The expense of the bonds shall be borne by the

Contractor. If at anytime a surety on any such bond is declared bankrupt or loses its right to do business in the

State of Connecticut, or is removed from the list of Surety Companies acceptable on Federal Bonds, or for any other justifiable cause, the Contractor shall, within ten (10) days after notice from the City of Meriden to do so.

substitute an acceptable bond(s) in such form and sum and signed by such other surety or sureties as may be paid by the Contractor. No payments shall be deemed due nor shall be made until the new surety or sureties have furnished an acceptable bond to the City.

If the Contractor is a partnership, the bonds shall be signed by each of the individuals who are partners; if a corporation, the bonds shall be signed in the correct corporation name by a duly authorized office, agent, or attorney-in-fact. There should be executed an appropriate number of counterparts of the bond corresponding to the number of counterparts of the contract. Each executed bond shall be accompanied by 1) appropriate acknowledgements of the respective parties; 2) appropriate duly certified copy of Power of Attorney or other certificate of authority where bond is executed by agent, officer, or other representative of Contractor or surety;

3) a duly certified extract from by-laws or resolutions or surety under which Power of Attorney or other certificates of authority of its agent, officer, or representative was issued.

The Contractor hereby agrees and understands that a Notice of Award is expressly conditional upon the receipt of these bonds and a Certificate of Insurance naming the City of Meriden (and others as appropriate) as

ADDITIONAL INSURED. If said documents are not received by the City of Meriden within ten (10) days from the date of Notice of Award, the City of Meriden reserves the right to withdraw its conditional acceptance of the bid and cancel the Notice of Award.

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS, that (here insert full name and address or legal title of Contractor) as Principal herinafter called contractor and (here insert full name and address or legal title of Surety

As Surety, hereinafter called Surety, are held and firmly bound unto (here insert full name and address or legal title of Owner)

As Obligee, hereinafter called Owner, in the amount of

Dollars $___________________________ for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS,

Contractor has by written agreement dated 20 , entered into a contract with Owner for (here insert full name, address and description of project)

In accordance with Drawings and Specifications prepared by (here insert full name and address or legal title of Engineer/Architect)

Which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.

PERFORMANCE BOND

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor, shall promptly and faithfully perform said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect.

The Surety hereby waives, notice of any alteration or defaults, under the contract or contracts of completion extension of time made by the Owner. arranged under this paragraph sufficient funds to pay the cost of completion less the balance of the contract price;

Whenever Contractor shall be, and declared by Owner but not exceeding, including other costs and damages to be in default under the Contract, the Owner having for which the Surety may be liable hereunder, the amount performed Owner’s obligations thereunder, the surety set forth in the first paragraph hereof. The term “balance may promptly remedy the default, or shall promptly of the contract price,” as used in this paragraph, shall mean the total amount payable by Owner to Contractor

1) Complete the Contract in accordance with its terms under the Contract and any amendments thereto, less and conditions, or the amount properly paid by Owner to Contractor.

2) Obtain a bid or bids for completing the Contract in Any suit under this bond must be instituted before accordance with its terms and conditions, and upon de- the expiration of two (2) years from the date on which termination by Surety of the lowest responsible bidder, final payment under the Contract falls due.

or, if the Owner elects, upon determination by the

Owner and the Surety jointly of the lowest responsible No right of action shall accrue on this bond to or for bidder, arrange for a contract between such bidder and the use of any person or corporation other than the

Owner, and make available as Work progresses (even Owner named herein or the heirs, executors, adminis-though there should be a default of a succession of trators or successors of the Owner.

Signed and sealed this day of 20

(Principal)

(Witness)

(Title)

(Surety)

(Witness)

LABOR AND MATERIAL PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS, that (here insert full name and address or legal title of Contractor) as Principal, herinafter called Principal, and (here insert full name and address or legal title of Surety

As Surety, hereinafter called Surety, are held and firmly bound unto (here insert full name and address or legal title of Owner)

As Obligee, hereinafter called Owner, for the use and benefit of claimants as hereinbelow defined, in the amount of Dollars $___________________________

For the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS,

Principal has by written agreement dated 20 , entered into a contract with Owner for (here insert full name, address and description of project)

In accordance with Drawings and Specifications prepared by

(here insert full name and address or legal title of Engineer/Architect) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.

LABOR AND MATERIAL PAYMENT BOND

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Principal shall promptly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance of the Contract, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions:

1. A claimant is defined as one having a direct con- accuracy the amount claimed and the name of the party tract with the Principal or with a Subcontractor of the to whom the materials were furnished, or for whom

Principal for labor, material, or both, used or reasonably the work or labor was done or performed. Such notice required for use in the performance of the Contract, shall be served by mailing the same by registered mail labor and material being construed to include that part of or certified mail, postage prepaid, in an envelop ad-water, gas, power, light, heat, oil, gasoline, telephone dressed to the Principal Owner or Surety, at any place service or rental of equipment directly applicable to the where an office is regularly maintained for the trans-

Contract. action of business, or served in any manner in which legal process may be served in the state in which the

2. The above named Principal and Surety hereby aforesaid project is located, save that such service need jointly and severally agree with the Owner that every not be made by a public officer.

claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) b) After the expiration of one (1) year following the days after the date on which the last of such claimant’s date on which Principal ceased Work on said Contract, work or labor was done or performed or materials were it being understood, however, that if any limitation em-furnished by such claimant, may sue on this bond for bodied in this bond is prohibited by any law controlling the use of such claimant, prosecute the suit to final the construction hereof such limitation shall be deemed judgment for such sum or sums as may be justly due to be amended so as to be equal to the minimum period claimant, and have execution thereon. The Owner shall of limitation permitted by such law.

not be liable for the payment of any costs or expenses of any such suit. c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of

3. No suit or action shall be commenced hereunder the state in which the Project or any part thereof, is by any claimant: situated, or in the United States District Court for the district in which the Project, or any part thereof is sit-

a) Unless claimant, other than one having a direct uated, and not elsewhere.

contact with the Principal, shall have given written notice to any two of the following: the Principal, the 4. The amount of this bond shall be reduced by and

Owner, or the Surety above named, within ninety (90) to the extent of any payment or payments made in good days after such claimant did or performed the last of faith hereunder, inclusive of the payment by Surety of the work or labor, or furnished the last of the materials mechanics’ liens which may be filed of record against for which said claim is made, stating with substantial said improvement, whether or not claim for the amount of such lien be presented under and against this bond.

Signed and sealed this day of 20

(Principal)

(Witness)

(Surety)

(Witness)

INSURANCE REQUIREMENTS *

All insurance coverage shall be provided by the Contractor and by or for any of their Subcontractors at no additional expense to the City. The scope and limits of insurance coverages specified are the minimum requirements and shall in no way limit or exclude the City from requesting additional limits and coverage provided under the Contractor’s policies and/or their Subcontractors’ policies. The Contractor shall either require each of their Subcontractors to produce identical insurance coverage requirements as detailed hereinafter or the Contractor shall secure the coverage for all Subcontractors under the Contractor’s own policies.

The Contractor and/or Subcontractors shall be responsible for maintaining the stated insurance coverage in force for the life of the Contract with insurance carriers licensed and authorized to underwrite such insurance in the State of Connecticut. (Insurance carriers shall be rated A or higher by AM Best Co.)

The type and limits of insurance coverage shall not be less than the type and limits designated herein, and the

Contractor and/or Subcontractors agree that the coverage or the acceptance by the City of Certificates of

Insurance indicating the type and limits of insurance shall in no way limit the liability of the Contractor and/or subcontractor to any such type and limits of insurance coverage.

The insurance coverage hereinafter afforded by the Contractor and/or subcontractor shall be primary insurance, except when stated to apply in excess of or contingent upon the absence of other insurance. The amount and type of insurance shall not be reduced by the existence of other insurance’s held by the City.

The Contractor and/or Subcontractor shall provide coverage’s that are not impaired or the aggregate is not to impaired by any other risk, past or present, and the limits required, shall be fully available to the City of

Meriden of restored if depleted below the required levels during the course of the contract and/or any extensions thereto.

The Contractor and/or Subcontractor shall not commence work under the terms of this contract until they have obtained the liability insurance coverage required by this article and has filed Certificates of Insurance on same with the City, and the City has approved the Certificates of Insurance and the represented coverage.

Each Certificate of Insurance shall include the following pertinent information:

• Name of Insurance Carrier writing policy

• Name Insured

• Address of Named Insured

• Description of coverage (Workers’ Compensation certificates should evidence the state(s)of operation including Connecticut)

• Policy Periods (effective and expiration dates)

• Limits of liability and terms

• Brief description of operations performed and property covered

• Name and address of certificate holder

• Authorized agent’s name and address

• Date and signature of the issuing agent (original only)

• All additional named insured endorsement

• All cross liability endorsements

• All indemnification and hold harmless agreements (must be supported by Contractual

Liability Insurance)

Each insurance policy (with the exception of OCP shall contain an endorsement naming the City as an

Additional Insured, evidence of a Cross Liability endorsement so that each insureds interests are considered and treated separately in the case of claims between the insureds. The Contractor shall provide 60 Day advance

Notification** to the City in the event of any material change, modification, cancellation, or non-renewal of insurance coverage.** **Amended 01/13/14

The Contractor and/or Subcontractors shall include a waiver of subrogation rights, on all insurance policies, so that the City of Meriden cannot be sued by the Contractor’s insurer to recover any payments made on behalf of the Contractor and/or Subcontractor.

All insurance policies provided by the Contractor and/or Subcontractors shall include an endorsement indicating that any breach of warranty, by the named insured, will not be imputed to another insured.

During the course of execution of the work, whenever there is a lapse in the insurance requirements as stated herein, through cancellation, expiration, failure to renew , or any other cause, the City shall order the cessation of all activities** until such time as the insurance requirements are complied with. The Contractor shall have no claim or claims whatever against the City, or other parties to the contract. **Amended 01/13/14

The Contractor and their Subcontractors shall indemnify and save harmless the City of Meriden, and all additional named insured and all appointed or elected officers, officials, directors, committee members, employees, volunteer workers, commissioners, and any affiliated, associated, or allied entities and/or bodies of, or as may be participated in by the City of Meriden, or as may now or hereinafter be constituted or established from and against all claims, damages, and losses and expenses including attorney’s fees arising out of or resulting from the performance of the work under this contract, provided that any such claims, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to, or destruction of tangible property, including the loss of use resulting therefrom; and is caused in whole or in part by any negligent or willful act or omission of the Contractor, and their Subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable.

The Contractor and their Subcontractors shall, during the execution of the work, take necessary precautions and place proper guards for the prevention of accidents; shall set up all night suitable and sufficient lights and barricades; shall fully comply with the latest revisions of the Occupational Safety and Health Act of 1970 and all other Federal, State and Local Regulations, including any all amendments, revisions, and additions thereto, and shall indemnify and save harmless the City of Meriden and their additional named insured and their employees, officers, agents from any and all claims, suits, actions, fines, fees, damages, and costs to which they may incur by reason of death or injury to all persons and/or for all property damage of another resulting from non-compliance, unskillfulness, willfulness. negligence, or carelessness in the execution of the work, or in guarding or protecting the same, or from any improper methods, materials, implements or appliances used in execution of the work, or by or on account of any direct or indirect act or omission of the Contractor of their

Subcontractors or their employees or agents.

The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the execution of the contract.

The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury, or loss to; 1) all employees on the work and all other persons who may be affected thereby; 2) all the work and all the materials and equipment to be incorporated therein, whether in storage in or on the site, under the care, custody, or control of the Contractor or any of their Subcontractors; and 3) other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designed for removal, relocation, or replacement in the course of construction.

The Contractor shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards promulgating safety regulations and notifying owners and users of adjacent utilities.

The Contractor and/or subcontractor shall give all notices and comply with all applicable laws, ordinances, rules, regulations, and lawful orders for any public authority bearing on the safety of persons or property or their protection from damage, injury, or loss.

When The use or storage of explosives or other hazardous materials or equipment is necessary for the execution of work, the Contractor and/or their Subcontractors shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel.

The contractor shall designate a responsible member of their organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor’s superintendent unless otherwise designated by the Contractor in writing to the City.

In any emergency affecting the safety of persons or property, the Contractor shall act to prevent threatened damage, injury, or loss.

The Contractor, Subcontractor, and their insurer(s) shall waive governmental immunity as a defense and shall not use the defense of governmental immunity in the adjustment of claims or in the defense of any suit, action or claim brought against the City. Nothing shall limit the City of Meriden from utilizing the defense of governmental immunity.

Contractor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the City Meriden as an Additional Insured on a primary and non-contributory basis to all policies except Workers Compensation. All policies should also include a Waiver of Subrogation.

Umbrella/Excess shall state that it follows form over General Liability, Auto Liability and Workers

Compensation. Insurance shall be written with Carriers approved in the State of Connecticut and with a minimum AM Best’s Rating of “A-“ VIII. In addition, all Carriers are subject to approval by the City of

Meriden.

(Minimum Limits)

General Liability Each Occurrence

General Aggregate

Products/Completed Operations Aggregate

No Snow Removal Exclusion

$1,000,000

$2,000,000

$2,000,000

Auto Liability Combined Single Limit

Each Accident

$1,000,000

Umbrella

(Excess Liability)

Each Occurrence

Aggregate

Workers’ Compensation and WC Statutory Limits

Employers’ Liability EL Each Accident $1,000,000

EL Disease Each Employee $1,000,000

EL Disease Policy Limit $1,000,000

Original, completed Certificates of Insurance must be presented to the City of Meriden prior to contract issuance. Contractor agrees to provide replacement/renewal certificates at least 60 days prior to the expiration date of the policies. Should any of the above described policies be cancelled, limits reduced or coverage altered, 30 days written notice must be given to the City of Meriden.

Article 6 Substitutes and “or equals”

Article 6.05.2.A – After Contractor add “or Owner”

Article 6.05.2.2E – Substitute Items - Add the words “If, in the owner’s opinion, the number of substitutions is excessive” after “reimburse Owner for the reasonable charges of Engineer for evaluating each such proposed substitutes”.

Add the following paragraph 6.09D:

The requirements of subparagraph 6.09 do not waive the Contractor’s responsibility of complying with the requirement of the Contract Documents when such regulations and requirements exceed those of any laws, ordinances, rules, regulations and orders of any public authority bearing the work.

Delete Article 6.10 in its entirety and substitute the following:

Under the terms of Regulation 16, referring to Contractors and Subcontractors issued by the State

Tax Commission in administration of the State Sales and Use Tax, the Contractor may purchase materials or supplies to be consumed in the performance of this Contract without payment of Tax and shall not include in his Bid nor charge any Sales or Use Tax on any materials or labor provided.

Amend Article 6.12 to read:

“Contractor shall maintain in a safe place at the Site two (2) record copies…”

Add the following to article 6.13:

6.13.A.4 Protection in general shall consist of the following:

6.13.A.5 The Contractor shall furnish approved hard hats, other personal, protective equipment as required, approved first aid supplies, name of first aid attendant, and a posted list of emergency facilities.

6.13.A.6 The Contractor shall take prompt action to correct any hazardous conditions reported.

6.13.A.7 The Contractor shall be responsible for the adequate strength and safety of all scaffolding, staging and hoisting equipment, and for temporary shoring, bracing and tying.

The Contractor shall comply with the requirements of the Occupational

Safety and Health Act of 1970 and the Construction Safety Act of 1969, including all Standards and Regulations which have been promulgated by the Governmental Authorities which administer such acts; and said Requirements, Standards and Regulations are incorporated herein by reference.

The Contractor shall be directly responsible for compliance therewith on the part of its agents employees, material men and Subcontractors, and shall directly receive and be responsible for all citations, assessments, fines or penalties which may be incurred by reason of its agents, employees, material men or Subcontractors, to so comply.

The Contractor shall indemnify the Owner and the Engineer and save them harmless from any and all losses, costs and expenses, including fines and reasonable attorney’s fees incurred by the Owner and the Engineer by reason of the real or alleged violation of such laws, ordinances, regulations and directives, Federal, State and local, which are currently in effect or which become effective in the future, by the Contractor, his

Subcontractors or material men.

6.16 Emergencies

Add 6.16.B – The Contractor shall provide the Owner with at least two (2) phone numbers in case of emergency.

Article 8 – Replacement of Engineer

Delete 8.02 in its entirety

8.06 – Insurance

8.06A – Delete Article 5, Add Supplemental General Conditions

Article 9 - Engineer’s Status During Construction

Revise 9.03.B to read:

In addition to the Engineer, The Owner may employ a Clerk-of- the Works shall be authorized to observe all material, workmanship and equipment for compliance with the Contract Documents’ requirements of tests and safety provisions, and report any variance to the Engineer. He shall have no authority to interpret, vary or suspend the requirements of the Contract.

The Clerk-of-the-Works will keep records of material deliveries, weather conditions and manpower; he will monitor compliance with the approved Construction Schedule and the Equal

Employment Provisions.

The Contractor shall cooperate with the Clerk-of-the-Works in the performance of his duties, and shall provide access to all portions of the work and information required for his records. Any requests for modification of the Contract provisions or working procedures shall be reviewed with the project representative prior to making submittal(s) to the Engineer.

Cost of Work, Allowances; Unit Price Work

Article 11 is hereby modified as follows:

Add the following Articles:

11.03D Delete the entire paragraph and substitute the following:

It is understood and agreed that the prices bid for the various units of construction shall control in any Contract awarded hereafter. The City of Meriden reserves the right to revise the estimated quantities with no fixed limits set nor extra compensation allowed other than the above stated unit prices.

Article 12 – Change of Contract Price and Change of Contract Time

Add the following:

12.01.B.4 - The Contractor, when performing work under article 11.3.3 shall, upon request, promptly furnish in a form satisfactory to the Owner, itemized statements of the cost of the work so ordered, including, but not limited to, certified payrolls, and copies of accounts, bills and vouchers to substantiate the above estimates.

Add 12.04.1 -The Contractor guarantees that he can and will complete the work within the time specified or within the time as extended as provided elsewhere in the Contract Documents. Inasmuch as the damage and loss to the City of Meriden which will result from the failure of the Contractor to complete the work within the stipulated time will be most difficult or impossible of accurate assessment, the damages to the City for such delay and failure on the part of the Contractor shall be liquidated in the sum of

$250.00 each calendar day (Sundays and Holidays included) by which the Contractor shall fail to complete the work or any part thereof in accordance with the provisions hereof and such liquidated damages shall not be considered as a penalty. The City will deduct and retain out of any money due to become due hereunder, the amount of liquidated damages, and in case those amounts are less than the amount of liquidated damages, the Contractor shall be liable to pay the difference upon demand by the

City.

Article 13 - Warranty and Guarantee; Tests and Inspections; Correction, Removal or Acceptance of Defective

Work

Article 13.02 is modified to include the following:

The Contractor shall make every effort to minimize damage to all access routes, and he shall acquire all necessary permits for working in, on or from public streets or rights or way and for securing access rights of their own.

All costs of the removal and restoration to original condition of walls, fences and structures, utility lines, poles, guy wires or anchors, and other improvements required for passage of the

Contractor’s equipment shall be borne by the Contractor. The Contractor shall notify the proper authorities of the City and all utilities of any intended modifications or disruption to their property prior to the start of construction, and shall cooperate with them in the scheduling and performance of this operation.

Article 14 Payments to Contractor and Completion

Modify 14.02.D.4 to read:

Payments may be withheld to Contractors who are in default through debt or contract to the City.

14.07C – Change “thirty days” to “forty five (45) days”

Delete 14.09A in its entirety.

Article 15 Suspension of work and termination

Delete 15.03.3 in its entirety.

15.04B – Change 30 to 45 and change “30 days to pay” to 60.