This file contains architectural roof plan drawings and detailed construction specifications for the Little Shell Tribe Health Care Facility roof replacement project in Great Falls, Montana. The drawings include a roof plan at 1/8" = 1'-0" scale showing existing conditions, including prefinished metal roofing sections to remain, existing mechanical units, roof hatch locations, and SBS modified bitumen roofing areas requiring patching.
The detailed construction drawings provide specifications for material applications, wall base terminations, drain details, penetration details, and corner reinforcement methods. Key material requirements include fabric reinforced hot rubberized asphalt (HRA), XPS insulation with latex modified concrete top, dimpled drainage mat, uncured neoprene, and various flashing and sealant components. The drawings specify minimum thicknesses, reinforcement requirements, and proper installation methods for transitions, corners, drains and penetrations. Construction notes indicate contractors must coordinate closely with mechanical work, ensure proper drainage, and maintain watertight conditions throughout the installation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING PREFINISHED METAL
ROOFING TO REMAIN
EXISTING
ROOF HATCH
EXISTING
MECH.
UNIT
SLOPE
EXISTING
MECHANICAL
UNIT
SLOPE
EXISTING
MECH.
UNIT
SLOPE
EXISTING SBS MODIFIED BITUMEN
ROOF TO REMAIN, PATCH AS REQ'D
SLOPE EXISTING PREFINISHED METAL
ROOFING TO REMAIN
EXISTING
MECHANICAL
UNIT SLOPE
NORTH
1 ROOF PLAN1/8" = 1'-0"
1/ 4"
1'
-0
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
EXISTING
ROOF HATCH
EXISTING
MECH.
UNIT
SLOPE
EXISTING
MECHANICAL
UNIT
SLOPE
EXISTING
MECH.
UNIT
SLOPE
SLOPE EXISTING PREFINISHED METAL
ROOFING TO REMAIN
EXISTING
MECHANICAL
UNIT SLOPE
NORTH
1 ROOF PLAN1/8" = 1'-0"
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
EXISTING
ROOF HATCH
EXISTING
MECH.
UNIT
SLOPE
EXISTING
MECHANICAL
UNIT
SLOPE
EXISTING
MECH.
UNIT
SLOPE
SLOPE
EXISTING PREFINISHED METAL
ROOFING TO REMAIN
EXISTING
MECHANICAL
UNIT SLOPE
NORTH
1 ROOF PLAN1/8" = 1'-0"
1/ 4"
1'
-0
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
MATERIAL APPLICATION DETAIL
1/2" MIN. THICKNESS,
4" 3
4"
HRA
FABRIC REINFORCEMENT
APPROVED PLYWOOD
SEE NOTE 2
NOTES:
1. ADEQUATE STRUCTURAL SUPPORTS AND THE NUMBER AND TYPE OF FASTENERS
REQUIRED TO COMPLY WITH APPLICABLE CODES, SHOULD BE DETERMINED AND VERIFIED
BY PROJECT ARCHITECT/ENGINEER.
2. ADDITIONAL REINFORCING (HRA W/6" WIDE FABRIC REINFORCEMENT) IS REQUIRED OVER
SUBSTRATE BOARD JOINTS
XPS INSULATION
XPS INSULATION WITH LATEX
PROTECTION SHEET
FABRIC REINFORCED
HOT RUBBERIZED
ASPHALT (HRA)
DIMPLED DRAINAGE MAT
MODIFIED CONCRETE TOP
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
NOTES:
1. MONOLITHIC MEMBRANE CAN BE USED TO FLASH PERIMETER PARAPET/CURB DETAILS BUT MUST NOT BE LEFT EXPOSED.
2. FLEXIBLE FLASHING MAY BE USED AT ALL CONCRETE-TO-CONCRETE AND CONCRETE- TO-CONCRETE BLOCK TRANSITIONS. FLEXIBLE
FLASHING MUST BE USED AT ALL OTHER TRANSITIONS (i.e., CONC.-TO-GYP. BD., GYP. BD.-TO-GYP. BD., ETC.)
3. PARAPETS/CURBS COMPOSED OF CONCRETE BLOCK (CMU) MUST BE FLASHED WITH MONOLITHIC MEMBRANE. (SEE INSET DETAIL)
OR OTHER APPROPRIATE EXTERIOR
METAL FLASHING, STONE CLADDING
FLEXIBLE FLASHING REINFORCEMENT
FINISH SYSTEM
MONOLITHIC MEMBRANE
16"
16"
3"
PARAPET FLASHING DETAIL
Project
Date
Drawn by
Checked by
3" = 1' - 0"
0 4" 8" 1' - 0" 0
1 1/2" = 1' - 0"
8"
1" = 1' - 0"
1' - 4" 2' 0 1' 2' 3' 0
3/4" = 1' - 0"
1' - 4" 2' - 8" 4' 0
1/2" = 1' - 0"
2' 4'
3/8" = 1' - 0"
6' 0 2' - 8" 5' - 4" 8' 0
1/4" = 1' - 0"
4' 8' 12' 0
1/8" = 1' - 0"
16'
1/8" = 1' - 0"
8'
3/32" = 1' - 0"
24' 0 10' - 8" 21' - 4" 32'
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
CURB DETAIL
4"
4"
NOTES:
1. FABRIC REINFORCEMENT MAY BE USED AT ALL CONCRETE-TO-CONCRETE AND
CONCRET-TO-CONCRETE BLOCK TRANSITIONS. FLEX-FLASH UN MUST BE USED AT ALL
OTHER TRANSITIONS (i.e., CONC. DECK-TO-GYPSUM BOARD, ETC.).
2. XPS INSULATION WITH CEMENTIOUS TOP SHOULD BE PROPERLY INSTALLED AS SECURED
AS PER MANUFACTURE RECOMMENDATIONS
1/2" MIN. THICKNESS,
PLYWOOD
PROTECTION SHEET
FABRIC REINFORCED
HOT RUBBERIZED
ASPHALT (HRA)
DIMPLED DRAINAGE MAT
UNCURED NEOPRENE
XPS INSULATION
XPS INSULATION WITH LATEX
MODIFIED CONCRETE TOP
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
OUTSIDE CORNER REINFORCEMENT
STEP 3 COMPLETELY ENCAPSULATE ALL EXPOSED
REINFORCING WITH A TOP COATING OF
MONOLITHIC MEMBRANE. NO REINFORCING
SHOULD BE LEFT EXPOSED OVERNIGHT.
STEP 2
STEP 1
MONOLITHIC
MEMBRANE
MONOLITHIC
MEMBRANE
FLEXIBLE FLASHING
OR OTHER
APPROVED
REINFORCEMENT
FLEXIBLE FLASHING
OR OTHER
APPROVED
REINFORCEMENT
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
WALL BASE TERMINATION DETAIL
16"
BONDING ADHESIVE
SPLICE TAPE (SEE NOTE 5)
FLEXIBLE FLASHING
SEALANT
SEALANT
FOAM ROD OR TUBING
FASTENED 12" O.C.
HYDROFLEX 10
PROTECTION
MONOLITHIC MEMBRANE
OTHER APPROVED
SEPARATION SHEET OR
16"
3" MIN.
2"
MAX.
6"3"
SEE NOTE 2
2"
MAX.
NOTES:
1. DETAIL DESIGNED FOR JOINTS WITH
MAX. MOVEMENT ACCOMMODATION
FACTOR OF 25%.
2. IF CURBING THE DETAIL IS NOT
FEASIBLE, APPROPRIATE
PROTECTION IS REQUIRED TO
DIVERT WATER AWAY AND PREVENT
MECHANICAL DAMAGE.
3. TREATED WOOD BLOCKING,
CONCRETE MASONRY UNITS, ETC.,
CAN BE SUBSTITUTED FOR P.I.P.
CONCRETE CURB.
4. DIAMETER OF FOAM ROD OR TUBE
SHOULD BE 1" LARGER THAN
MAXIMUM AS-BUILT JOINT OPENING.
5. SPLICE TAPE SHOULD BE USED AT
EXPOSED LAPS OF CONSECUTIVE
PIECES OF FLEXIBLE FLASHING.
METAL COUNTER FLASHING
METAL TERMINATION BAR
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
DRAIN DETAIL
6" MIN.
1" MIN.
1/2" MIN. THICKNESS,
PLYWOOD
PROTECTION SHEET
FABRIC REINFORCED
HOT RUBBERIZED
ASPHALT (HRA)
DIMPLED DRAINAGE MAT
UNCURED NEOPRENE
XPS INSULATION
XPS INSULATION WITH LATEX
MODIFIED CONCRETE TOP
NOTES:
1. REINFORCEMENT SHALL BE ONE SHEET OF UNCURED NEOPRENE EXTENDING A MINIMUM OF
6" BEYOND THE DRAIN FLANGE ON ALL SIDES AND SECURED IN CLAMPING RING AT DRAIN.
2. ALL DRAINS ARE REQUIRED TO HAVE FLASHING CLAMPING RING ASSEMBLIES. CONSULT
SPECIFIC DRAIN MANUFACTURER FOR ADDL. ACCESSORIES (i.e., DEBRIS SCREENS, LOW-PROFILE DOMES, EXTENSIONS, ETC.)
3. APPROVED PROTECTION LAYER SHOULD NOT BE EXTENDED UNDER THE CLAMPING RING OF
THE DRAIN. FABRIC REINFORCEMENT SHOULD STOP A MIN. OF 4" AWAY FROM THE DRAIN.
4. XPS INSULATION WITH CEMENTIOUS TOP SHOULD BE PROPERLY INSTALLED AS SECURED
AS PER MANUFACTURE RECOMMENDATIONS
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
PENETRATION DETAIL
PIPE/VENT
FLEX-FLASH UN
ST. STL. BAND CLAMP
4"
6" MIN.
MIN.
EPOXY GROUT
HYDROFLEX 30 OR
OTHER APPROVED
PROTECTION
MONOLITHIC
MEMBRANE 6125-FR
FLEX-FLASH UN
ST. STL. BAND CLAMP
4"
MIN.
6" MIN.
NOTES:
1. PENETRATION MUST BE PROPERLY SECURED TO STRUCTURE TO PREVENT VERTICAL OR
LATERAL MOVEMENT. EXPOSED DECK CLAMPS ARE NOT APPROPRIATE.
2. SOME PIPE MATERIALS (PVC, COPPER, BRASS) MAY REQUIRE ROUGHENING/SANDING, IN
ADDITION TO WIPING W/SURFACE CONDITIONER FOR PROPER ADHESION OF MM6125. METAL
PIPES MUST BE FREE OF ALL OIL AND RUST.
3. THE SAME DETAILING ABOVE WOULD BE EMPLOYED FOR PENETRATIONS THROUGH
VERTICAL/FOUNDATION WALL APPLICATIONS.
4. IN COVERED/BURIED CONDITIONS, THE FLASHING DETAIL SHOULD EXTENDED AS HIGH AS
POSSIBLE. FLASHING MUST BE TERMINATED AT OVERBURDEN LEVEL AND NO LESS THAN 6"
ABOVE SUBSTRATE.
APPROVED PROTECTION
MONOLITHIC
MEMBRANE(SEE NOTE 4) (SEE NOTE 4)
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
STEP 3
STEP 2
STEP 1 FLEXIBLE FLASHING
OR OTHER
APPROVED
REINFORCEMENT
MONOLITHIC
MEMBRANE
MONOLITHIC
MEMBRANE
COMPLETELY ENCAPSULATE ALL EXPOSED REINFORCING WITH A TOP
COATING OF MONOLITHIC MEMBRANE. NO REINFORCING SHOULD BE LEFT
EXPOSED OVERNIGHT.
INSIDE CORNER REINFORCEMENT DETAIL
FLEXIBLE FLASHING
OR OTHER
APPROVED
REINFORCEMENT
NORTH1 ROOF PLAN
1/8" = 1'-0"
Project
Date
Drawn by
Checked by
R O
O F
PL
AN
LI
TT
LE
S
H
EL
L
TR
IB
E
H
EA
LT
H
C
AR
E
FA
C
IL
IT
Y
SM
EL
TE
R
A
VE
N U
E N
.E
G R
EA
T
FA
LL
S, M
O N
TA
N
A
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A THE CONTRACTOR SHALL BE RESPONSIBLE TO HIRE A CERTIFIED THIRD PARTY TESTING AGENCY APPROVED BY THE IHS 2. INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED INSTALL ROOFING MEMBRANE, INSULATION AND ASSOCIATED ROOF ACCESSORIES AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. NOT ALL ROOFING DETAILS ARE SHOWN, REFER TO THE ROOFING MANUFACTURER'S STANDARD DETAILS FOR ADDITIONAL GENERAL INFORMATION. 3. ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE ALL ROOF TOP MOUNTED EQUIPMENT DESIGNATED TO BE RE-INSTALLED SHALL BE MOUNTED AND CONNECTED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 4. PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT PROVIDE NEW FLASHING AT ALL LOCATIONS INCLUDING BUT NOT LIMITED TO EQUIPMENT CURBS, PIPE/CONDUIT PENETRATIONS, SKYLIGHTS, ROOF TO WALL TRANSITIONS, ROOF DRAINS. 5. PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE PROVIDE METAL FLASHING AND SEALANTS FOR POSITIVE DRAINAGE AT ALL EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS. 6. PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL PROVIDE ROOF MEMBRANE BASE FLASHING AT ALL VERTICAL-TO -HORIZONTAL ROOFING SURFACE TRANSITION PER ROOFING MANUFACTURER RECOMMENDATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE IHS THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. 8. PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL PROTECT (E) ROOFING, CAP FLASHINGS, AND TOP METAL CLOSURES THAT ARE TO REMAIN. REPLACE ANY DAMAGED COMPONENTS AT NO EXTRA COST TO THE IHS 9. SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH SEAL ALL ROOFING AND COUNTERFLASHING WORK WITH COPINGS, CAP FLASHING, FLASHING RECEIVER AND OTHER COMPONENTS OR CURB/WALL CONSTRUCTION AS APPLICABLE 10. FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, FOR ANY EQUIPMENT TO BE RE-INSTALLED ON NEW ROOF, CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ROOFING. 11. SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SHOULD ANY DAMAGE OCCUR TO (E) OR (N) ROOFING SYSTEM, CONTRACTOR SHALL REPAIR AND/OR REPLACE ROOFING AS REQUIRED AT HIS SOLE EXPENSE 12. PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL PROVIDE (N) STRAINER CAP AT ALL ROOF DRAINS AND ALL OVERFLOW ROOF DRAINS. 13. AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING AT ROOF PENETRATIONS, PROVIDE SEALANT WHERE MISSING PRIOR TO INSTALLING ROOF DECK INSULATION. 14. CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF CONTRACTOR SHALL COORDINATE CLOSELY THE WORK OF ALL TRADES AT THE TRANSITION BETWEEN (E) & (N) ROOFING TO ENSURE ROOFING AND COATING WORK IS COMPLETELY SEALED AND LEAK FREE. 15. MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS MISCELLANEOUS CONDUITS, PIPES, AND OTHER MINOR ITEMS ARE NOT SHOWN. CONTRACTOR SHALL TEMPORARILY LOCATE OR MAKE ADJUSTMENTS TO THESE ITEMS AS NECESSARY TO ENSURE A CONTINUOUS, NON-INTERRUPTED ROOF INSTALLATION 16. ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE ALL ELECTRICAL, DATA AND MISCELLANEOUS CABLE COMPONENTS SHALL BE REINSTALLED AS NECESSARY TO PROVIDE A FULLY FUNCTIONAL AND WATERTIGHT UNIT. 17. DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING DO NOT STACK EXISTING OR NEW MATERIALS ON EXISTING ROOF AS THIS MAY EXCEED THE ROOF LOADING CAPACITY. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING ROOF DECK LOADING CAPACITY AND TRANSPORTING NEW MATERIALS ON THE ROOF ONLY AS NEEDED AND WITHIN THE ROOF LOADING CAPACITY LIMIT.
| Sheets and Views |
| LSSU roof plan autocad - Layout1 |
| LSSU roof demo autocad - Layout1 |
| New work LSSU roof - Layout1 |
| 1 Roof details final 08272024 - Sheet 1 |
| 2 Roof details final 08272024 - Sheet 2 |
| 3 Roof details final 08272024 - sheet 3 |
| 4 Roof details final 08272024 - Sheet 4 |
| 5 Roof details final 08272024 - Sheet 5 |
| 6 Roof details final 08272024 - Sheet 6 |
| 7 Roof details final 08272024 - Sheet 7 |
| 8 Roof details final 08272024 - Sheet 8 |
File details come from the government source that posted it. Updated .