This document is a technical drawing package for a Philips DigitalDiagnost C90 VS High Performance Room X-Ray equipment installation at the Fort Thompson Indian Health Center. The drawings provide detailed site layout, equipment positioning, ceiling height guidelines, and technical specifications for the radiology room. Key details include recommended ceiling heights between 8'-9" and 10'-6", precise equipment placement dimensions, and specific requirements for room preparation such as electrical configurations, HVAC specifications, and electromagnetic interference considerations.
The drawing set includes multiple pages detailing equipment layout, site planning issues, and technical constraints, with a focus on the Philips X-Ray system components including the Generator M-Cabinet CXA, DigitalDiagnost TH/TH2 table, Bucky Diagnost VS Digital Tiltable, Eleva Workspot, and associated equipment. The technical specifications outline critical installation requirements like electrical needs (3-phase power, 400-480 VAC), temperature and humidity control (75° ± 11°F, 52.5% ± 22.5% humidity), and precise positioning guidelines to ensure optimal system performance and functionality.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
Revision History
Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project
Rev. Date
Revision Descriptions By
Section A - Equipment Plan
General Notes ----------------------------------------- AN
Site Layout ---------------------------------------- A1
Ceiling Height Guide -------------------------- A3
Equipment Layout --------------------------------- A2 www.healthcare.philips.com
*Photo shown is not site specific.
C1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N M
I D
D a t e
D r a w n
Q u o t e
O r d e r
H i g h
P e r f o r m a n c e
R o o m
D i g i t a l D i a g n o s t
C
V
S
1.29.2021
F
Y
I X
R e v
N o n e
T H
E
I N
F O
R M
A T
I O
N
N
T
H
S
P
A C
K A
G E
O
V I D
D
C
U S
T O
M E
R
C
O N
V E
N I E
N C
E
A
O
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
F o r t
T h o m p s o n
I n d i a a l t h n t e r
F o r t
T h o m p s o n
N
D
R a d
R o o m
K o n i n k l i j k i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n i w o l o r p r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
D r a
B y D a v d i v a r e s
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
C r a g n n y c r a i g d e n n y p h i l i p s c m
AN
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N M
I D
D a t e
D r a w
Q u o t e
O r d e r
H i g h
P e r f o r m a n c e
R o o m
D i g i t a l D i a g n o s t
C
V
S
1.29.2021
F
Y v
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
F o r t
T h o m p s o n
I n d i a l n t e r
F o r t
T h o m p s o n
N
D
R a d
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
D r a
D a v i v a r e s
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
C r a n n y c r a i g d e n n y p h i l i p s c o m
HVAC Requirement for General Equipment Locations
Heating, ventilation, air conditioning requirement for general equipment locations must maintain temperature at 75° +/- 11°Fahrenheit (24° +/- 6°Celsius) and non-condensing relative humidity at 52.5%, +/- 22.5%.
(13.0)
Minimum Site Preparation Requirements
A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled before the installation can begin.
1. Walls shall be painted or covered, baseboards installed, floors shall be tiled and/or covered, ceiling shall have grid tiles and lighting fixtures installed and operational.
2. Doors and windows, especially radiation protection barriers, installed and finished with lock sets operational.
3. All electrical convenience, conduit, raceway, knockouts, cable openings, chase nipples, and junction boxes installed and operational.
4. Incoming mains power operational and connected to room x-ray breaker.
5. 115v convenience outlets operational.
6. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.
7. All contractor-supplied cables pulled and terminated.
8. A dust-free environment in and around the procedure room.
9. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications. BTUs shown on sheet A1 are average heat capacity.
10. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditioner failure.
11. All plumbing installed and finished.
12. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.
13. Refer to Transport Information page for clear door openings and corridor widths.
Note
Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.
Remote Service Diagnostics
Medical imaging equipment to be installed by Philips Healthcare is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote
Service Network (RSN) connectivity. All cost with this feature is the responsibility of the customer.
(13.0)
General Specifications
1. Responsibility
The customer shall be solely responsible, at its expense for preparation of site, including any required structural alterations. The site preparation shall be in accordance with plans and specifications provided by Philips. Compliance with all safety electrical and building codes relevant to the equipment and its installation is the sole responsibility of customer. The customer shall advise Philips of conditions at or near the site which could adversely affect the carrying out of the installation work and shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin. The customer shall provide all necessary plumbing, carpentry work, or conduit wiring required to attach and install products ready for use.
2. Permits
Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and related rules, regulations, shall bear any expense in obtaining same or in complying with any ordinances and statutes.
3. Radiation Protection
The customer or his contractor, at his own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection. (X-Ray Tube output 150 KVp max.)
4. Asbestos and Other Toxic Substances
Philips assumes no hazardous waste (i.e., PCB's in existing transformers) exists at the site. If any hazardous material is found, it shall be the sole responsibility of the customer to properly remove and dispose of this material at its expense. Any delays caused in the project for this special handling shall result in Philips time period for completion being extended by like period of time. Philips assumes that no asbestos material is involved in this project in any ceilings, walls or floors. If any asbestos material is found anywhere on the site, it shall be the customer's sole responsibility to properly remove and/or make safe this condition, at the customer's sole expense.
5. Labor
In the event local labor conditions make it impossible or undersirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.
6. Schedule
The general contractor should provide Philips with a schedule of work to assist in the coordination of delivery of Philips supplied products which are to be installed by the contractor and delivery of the primary equipment.
7. Extended Installation or Turnkey Work by Philips
Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between
Philips and the customer for room preparation work required by the equipment represented on these drawings, some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract workscope and these drawings, the turnkey contract workscope shall govern.
8. Electromagnetic Interference and Image Quality
The Philips digital X-Ray detectors are highly sensitive receivers. Therefore, when determining where in the facility to install the x-ray system, care must be taken to avoid electromagnetic interference (EMI) to ensure optimal image quality. Possible EMI sources can be high power generators, power transformers, high power mains lines or other electromagnetic sources, which are located in the examination room directly or in the environment around the examination room. These EMI sources may emit excessive magnetic noise that could cause artifacts in the digital detector.
9. Avoid Adjacent EMI Sources
Do not locate the digital detector in a room adjacent to such an EMI source (next to, above or below). EMI sources can be located also in the wall, floor or ceiling.
10. Detector Location and Additional Sheiding
If a location next to an EMI source is unavoidable, ensure the table and/or wallstand and proposed locations for portable detector exposures are away from these sources. The magnetic noise interference is reduced dramatically by locating as far away as possible from the EMI sources. It might be necessary to implement additional means to prevent an interference with the x-ray detector (e.g. additional shielding).
(19.0)
(19.0)
Electrical Requirements
M-Cabinet CXA 80
Supply Configuration: 3 phase, 3 wire power, neutral and ground. Wye.
or
3 phase, 3 wire power, ground. Delta.
Nominal Line Voltage: 400, 440, 460 or 480 VAC, 60 Hz
Branch Power Requirement: 112.5 kVA minimum
Circuit Breaker: 3 pole, 50 Amps (@ 480V) (Slow Blow)
Residual Current Device to be installed depending on local regulations.
18'-0"
3 4
Table Transverse ℄
T a b
L n g i t u d i n a l
8'-6"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' m m m m m m m
8'-3
1 4
3'-1
6'-0"
7 8
2'-1"
1'-0"
A1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N M
I D
D a t e
D r a w
Q u o t e
O r d e r
H i g h
P e r f o r m a n c e
R o o m
D i g i t a l D i a g n o s t
C
V
S
1.29.2021
F
Y v
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
F o r t
T h o m p s o n
I n d i a l n t e r
F o r t
T h o m p s o n
N
D
R a d
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
D r a
D a v i v a r e s
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
C r a n n y c r a i g d e n n y p h i l i p s c o m
Site Layout
1/4" = 1'-0"
Recommended Minimum Ceiling Height: 8'-9" (2667mm)
Recommended Maximum Ceiling Height: 10'-6" (3200mm)
Ceiling Heights other than recommended may impact equipment functionality - see Ceiling Height Guide and consult with Philips.
Ceiling Height measured from finished floor to bottom of Unistrut.
Walls
Soffit
Existing (to be removed)
Beams or other building construction elements
Legend
ME
4'-0" Serviceability
MS
Tube Location
102" S.I.D.
Table Transverse ℄
T a b
L n g i t u d i n a l
W a l l
B u c k y
WAP
ELW
SBC
8'-6"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' m m m m m m m
DVS
CS
Exact location to be coordinated by customer and local Philips service.
PS
MH
Weight
(lbs)
Heat Load
(btu/hr)
Detail Sheet
Equipment Designation
Description
Equipment Legend
A Furnished and installed by Philips
B Furnished by customer/contractor and installed by customer/contractor
C Installed by customer/contractor
D Furnished by Philips and installed by contractor
E Existing
F Future
G Optional item furnished by Philips
A2
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N M
I D
D a t e
D r a w
Q u o t e
O r d e r
H i g h
P e r f o r m a n c e
R o o m
D i g i t a l D i a g n o s t
C
V
S
1.29.2021
F
Y v
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
F o r t
T h o m p s o n
I n d i a l n t e r
F o r t
T h o m p s o n
N
D
R a d
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
D r a
D a v i v a r e s
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
C r a n n y c r a i g d e n n y p h i l i p s c o m
Site Planning Issues and Considerations
Notes to Philips Field Personnel
* Limited stretcher access to Wall Bucky. Recommend to move tabletop for improved access.
* Optional stitching shots at 102" S.I.D. will be available. See layout.
* Access to casework may be difficult when table is plan east.
* Location of the table may be in violation of ADA. Verify all applicable code with customer's architect of record.
* Transverse carriage to be shortened by 1'-4". (0'-8" at the front and 0'-8" at the back)
* Tabletop to be installed before table base is bolted to the floor.
* All room dimensions to be verified in field.
General Notes
* Longer cables will need to be ordered for cable runs from:
- "ME" to "MS" [55' (17m)]
- "ME" to "ELW" [88' (27m)]
* Any counters, keyboard trays and cabinetry shown to be supplied and installed by contractor. Shelf under control counter for UPS and CPU is required.
* Field to verify all existing Philps and/or third party equipment will not affect the functionality of the system and its components.
Equipment Layout
1/4" = 1'-0"
Recommended Minimum Ceiling Height: 8'-9" (2667mm)
Recommended Maximum Ceiling Height: 10'-6" (3200mm)
Ceiling Heights other than recommended may impact equipment functionality - see Ceiling Height Guide and consult with Philips.
Ceiling Height measured from finished floor to bottom of Unistrut.
A ELW Eleva Workspot
- Eleva Examination Control
- Acquisition Workspot (on shelf under counter)
- Uninterruptible Power Supply (on shelf under counter)
- Keyboard and Mouse
- mShield (optional, not shown)
127 786
DVS 956
BuckyDiagnost VS Digital Tiltable (Left)
A
ME Generator M-Cabinet CXA 342259
A
CSM3 Long
CS
879 444 A
MS 956761
DigitalDiagnost TH/TH2 (Wide Tabletop) A
A WAP Wi-Fi Access Point 2 --
2 --A SBC SkyPlate Battery Charger
--154PS Patient SupportA
--146MH Mobile HolderA
* Exact equipment configuration to be verified with local Philips Sales. Spacer for
DVS is listed on quote but not shown and not recommended to be installed.
Ceiling Height Guide for High Performance VS and Value Room
Not Site Specific
8'-9" to 10'-6" * Full Vertical Tube Movement
Limitations
8'-8" to 8'-9" Tube cannot reach Highest Position of Wall Bucky
8'-7" to 8'-8" Limitation noted above, plus horizontal (tilted) Bucky must be lowered for 40" SID
7'-11" to 8'-7" Limitations noted above, plus tabletop must be lowered for 40" SID
Loss of Coverage
7'-10" to 7'-11" 40" SID to horizontal (tilted) Bucky not available
7'-7" to 7'-10" Limitations noted above, plus 40" SID to tabletop not available
7'-7" Absolute Minimum Ceiling Height
* Ceiling Heights higher than 10'-6" - consult with Site Planning for limitations/loss of coverage
40" S.I.D. to table at standard working height
Tube can cover full range of movement of the
Wall Bucky
Allows comfortable working height for 40" S.I.D. to
Tilted Bucky
40" S.I.D. to table at standard working height
Tube can cover full range of movement of the
Wall Bucky
Allows comfortable working height for 40" S.I.D. to
Tilted Bucky
Highest Tube
Position
Lowest Tube
Position
Highest Tube
Position
Highest Tube
Position
Highest Tube
Position
Lowest Tube
Position
Highest Tube
Position
Highest Tube
Position
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' m m m m m m m
A3
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N M
I D
D a t e
D r a w
Q u o t e
O r d e r
H i g h
P e r f o r m a n c e
R o o m
D i g i t a l D i a g n o s t
C
V
S
1.29.2021
F
Y v
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
F o r t
T h o m p s o n
I n d i a l n t e r
F o r t
T h o m p s o n
N
D
R a d
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
D r a
D a v i v a r e s
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
C r a n n y c r a i g d e n n y p h i l i p s c m
File details come from the government source that posted it. Updated .