B05 Amdnment A0001-75H70125Q00019.pdf
PDF 218 KB Posted
- Attached to
- Fort Thompson Health Center X-Ray Replacement
- Solicitation number
- 75H70125Q00019
About this file
This document is an Amendment (A0001) to Solicitation 75H70125Q00019 for the Fort Thompson Health Center X-Ray Replacement project. The amendment provides 19 questions and answers related to technical and administrative details of the project, including demolition plans, existing conditions, equipment removal, structural and electrical requirements, and compliance considerations. Key responses include confirmation that minimal demolition is anticipated, Phillips will be responsible for removing existing X-Ray equipment, TERO compliance is needed, and the Payment and Performance Bond requirement depends on the award amount. The amendment also adds attachments for Fort Thompson Electrical, Structural, and Server Room drawings to Section J of the solicitation. The project is a 100% Small Business set-aside for commercial and institutional building construction, with an estimated project value between $100,000 and $250,000, and a 180-calendar-day performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0001
Andrew Hart, Contracting Officer
The purpose of this amendment is to provide following items;
a. Q&As as of April 21, 2025 (See next page)
b. Additional attachments in Section J. B01 Attachment J03 Fort Thompson Electrical, B01 Attachment J04 Fort Thompson Structural, and B01 Attachment J05 Fort Thompson Server Room.
All other terms and conditions of this solicitation remain unchanged.
Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104
75H70125Q00019
1 2
04/21/2025
04/07/2025
Amend No.
Item
Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ???
11/23/2020 IHS Response
IHS POC
A0001 1 4/17/2025 Technical
Please provide demolition plan or written SOW outlining any finishes that need to be removed or replaced (drywall, ceilings, flooring, casework, etc.)
as the Phillips plan provided only states that the contractor is responsible for all preparation of the space. Preparations are not defined. 04/18/2025
Demolition anticipated is minimal. Based on structural needs ceiling tile and grid may need to be removed and replace.
IHS COR
A0001 2 4/17/2025 Technical
Please provide As-Built plans showing existing conditions, including proximity to electrical and server rooms.
04/18/2025
See attached drawings
IHS COR
A0001 3 4/17/2025 Technical Please confirm room dimensions on Phillips plans reflect existing conditions. 04/18/2025
Dimensions should reflect existing conditions.
IHS COR
A0001 4 4/17/2025 Technical
Please confirm Phillips will be responsible for removing existing X-Ray equipment as there are special handling requirements for this equipment (radio active components). 04/18/2025
Phillips is responsible for removing existing equipment.
IHS COR
A0001 5 4/17/2025 Technical Please provide elevations of required casework.
04/18/2025 not applicable, existing casework to remain in place
IHS COR
A0001 6 4/17/2025 Admin
Please confirm existing casework has plumbing ru1ming to it and that new casework will only require discom1ect and reco1mect for new sink.
4/18/205 not appicable
IHS COR
A0001 7 4/17/2025 Admin Please provide specifications for new sink/fixtures.
4/18/2005 not appicable
IHS COR
A0001 8 4/17/2025 Technical Please provide specifications for casework and countertops.
4/18/2025 not appicable
IHS COR
A0001 9 4/17/2025 Technical
Please confirm any lead lining that may need to be installed in new or existing walls. Phillip drawings calls for a physicist to design any lead linings - who will provide this service? 4/18/2025 not anitcaped
IHS COR
A0001 10 4/17/2025 Technical Please provide specifications for any new flooring (static dissipative tile??)
4/18/2025 new flooring not anticipate
IHS COR
A0001 11 4/17/2025 Technical Please provide electrical requirements/ SOW.
4/18/2025 Refer to phillips drawing for electrical needs
IHS COR
A0001 12 4/17/2025 Technical
Please provide details for structural support. Is there existing that can be re-used or re- configured? 4/18/2025
Refer to phillips drawing for structurel needs. Existing can be re-used or re-configured after evaluation. IHS COR
A0001 13 4/17/2025 Technical
Please reference Sheet AN on Phillips Drawings provided, note 12 under Minimum Site Preparation requirements. Please confirm who is responsible for procurement and installation of specialty components outlined in this note. No specifications have been provided for these components.
4/18/2025 not anticpated for this installaiton
IHS COR
A0001 14 4/17/2025 Technical Please confirm if new lead lined doors and frames will be required.
4/18/2025 not anticpated for this installaton
IHS COR
A0001 15 4/17/2025 Technical Please confirm no radiation protection is required for ceilings.
4/18/202 not applicable
IHS COR
A0001 16 4/17/2025 Admin
Please confirm if a Payment and Performance Bond will be required.
4/17/2025
It depends on the award amount. Please see the RFQ Section B. Para B.7.2. and B.7.3.
IHS CS
A0001 17 4/17/2025 Technical Please confirm Permit requirements for this installation.
4/18/2025 no additional permits anticapated
IHS COR
A0001 18 4/17/2025 Technical
Please confirm TERO taxes or other Tribal Fees that need to be included in this proposal. 4/18/2025 yes, TERO compliance is needed
IHS COR
A0001 19 4/17/2025 Technical
Please confirm requirements for storage. Please indicate if secure storage needs to be in conditioned space
4/18/2025 not anticpated for this installation
IHS COR
| ADP62C3.tmp |
| PPI Log |
| ADPA051.tmp |
| PPI Log |
File details come from the government source that posted it. Updated .