B.4.C PWS.C Check 737-700 LV Rev 1.pdf
PDF 388 KB Posted
- Solicitation number
- 15M30023QA3700037
About this file
This combined synopsis and solicitation requests quotes for heavy maintenance checks on two Boeing aircraft owned by the US Marshals Service Justice Prisoner and Alien Transportation System. Firms must provide all labor, equipment, and supervision to complete checks within 45 days for a 737-700 aircraft in October 2023 and a 737-400 aircraft in January 2024. Checks include routine and non-routine maintenance items. The government will evaluate quotes based on price and technical capability and past performance and make multiple fixed-price awards. Quotes are due by July 5, 2023. Firms must have active SAM registration and include completed representations and certifications with their submission. Questions are due by June 20 and shall be addressed in writing to the identified contracting and technical points of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.4.C PWS.C Check 737-400 OKL.pdf | ||
| A.01 Sol.SB SubK Plan Template.docx | DOCX document | |
| A.01 Sol.Related Experience.pdf | ||
| A.01 Solicitation.15M30023QA700037 Boeing Heavy C Check Binder.pdf | ||
| A.01 Sol.PPQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Marshals Service (USMS) Justice Prisoner and Alien Transportation System
(JPATS) Boeing 737-700 Aircraft Heavy Maintenance Check Performance Work Statement
Original Revision
June 1, 2023
Table of Contents
1. General
1.1. Required Induction Date
2. Contract Type
3. JPATS Responsibilities
4. Contractor Responsibilities
4.1. Project Milestones
4.1.1. Engine Preservation
4.1.2. Engine Removal
4.1.3. Engine Shipment
4.1.4. Emergency Escape Slide Removal
4.1.5. Cargo Fire Extinguisher Removal
5. Place of Performance
6. Period of Performance
7. Warranty
8. Contract Administration Data
9. Right to Inspect / Audit
10. Deliverables
10.1. Aircraft Status Report
10.2. Accruals
10.3. Invoice
10.4. Aircraft Records
10.5. Aircraft Parts
11. Heavy Maintenance Check Requirements
12. Performance Standards
12.1. Assessing Performance
1. General
The United States Marshal Service, Justice Prisoner and Alien Transportation System (JPATS) has a requirement for the accomplishment of a Heavy Maintenance Check (Monthly Check, 1A, 2A, 4A, 1C, 2C, 3C, and 4C) on a U.S. Marshals Service owned Boeing 737-700 aircraft. These checks are detailed within a government owned MSG-3 Low Utilization Maintenance Program as derived from the Original Equipment Manufacturer (OEM) Maintenance Planning Document (MPD) and administered through CAMP Systems.
General requirements are as follows:
Boeing 737-7AX series aircraft; MSN 30182; Line Number 690; Variable Number YB152, Registration Number N738A, ACTT 20,053.4, ACTC 26,985. Reference Section 11 for the list of heavy maintenance requirements.
The aircraft maintenance and logistics efforts associated with this work must be adequately planned, staffed, and supervised by the Contractor to ensure all work schedules and maintenance activities are optimized.
1.1. Required Induction Date
The required induction date for this aircraft is October 17, 2023.
2. Contract Type
The Government anticipates awarding a firm-fixed price for the tasks listed in Section 11, Items 1 – 94. Unforeseen or Non-Routine Maintenance & Repairs will be repaired utilizing a Time & Materials basis.
3. JPATS Responsibilities
JPATS will deliver the aircraft to the Contractor’s facility on October 16, 2023.
JPATS will make available to the Contractor all applicable CAMP Systems task cards with associated Aircraft Maintenance Manual (AMM) references required for the accomplishment of the identified checks and inspections.
JPATS will make the following manuals available to the Contractor: Aircraft Maintenance Manual (AMM), Boeing issued Component Maintenance Manuals (CMM), Illustrated Parts Catalog (IPC), Wiring Diagram (WD), and Structural Repair Manual (SRM).
JPATS will provide GMM familiarization training, Required Inspection Item (RII) procedures training, Airworthiness Release procedure training, Logbook documentation training, and CAMP Task Card documentation training.
A JPATS COR will be onsite for the duration of the scheduled heavy maintenance check to ensure compliance with contractual requirements and to evaluate non-routine discrepancies.
4. Contractor Responsibilities
The Contractor will perform all maintenance and inspection items as well as complete all maintenance records documentation in accordance with JPATS GMM and the Contractor’s FAA Approved Repair Station Quality Control Manual.
The Contractor will appoint a point of contact (POC) for the JPATS Contracting Officer (CO) and COR.
The Contractor will provide written notification to the JPATS CO prior to subcontracting any portion of the maintenance effort to outside organizations or individuals.
The Contractor will notify the on-site JPATS COR if a discrepancy (non-routine) is discovered during the performance of these checks and inspections. The Contractor will provide the CO with an estimated cost for the repair(s) and an estimated timeline for the repair(s) on daily basis, utilizing a status sheet (contractor format). After approval is obtained to correct or repair the discrepancy, the Contractor will purchase any materials, supplies, and / or parts from an FAA approved vendor (all parts must be accompanied with an appropriately completed FAA Form 8130-3).
Note: JPATS reserves the right to utilize JPATS owned spare parts or procure the required parts through the normal JPATS’ procurement process.
The Contractor will adhere to applicable statutes and regulations as prescribed by the Occupational Safety and Health Administration (OSHA), the Federal, State and Local Environmental Protection Agency (EPA), the National Fire Protection Agency (NFPA), and the Federal Aviation Administration (FAA).
The Contractor will provide all common tools, special tools, test sets and equipment, ground support equipment, “consumables”, and “free stock” such as grease, lubricants, rags, common hardware, etc.
The Contractor will purchase, store, use, and dispose of all hazardous materials (HAZMAT) associated with the maintenance of aircraft, support equipment, and facilities in accordance with federal, state, and local statutes.
The Contractor will perform typical logistics tasks associated with the specified checks and inspections such as material and parts receiving, receiving inspections, identifying and reporting suspected unapproved parts (SUP), packing, crating, shipping, materials handling and storage, and shelf-life management.
The Contractor will perform all maintenance documentation to include JPATS historical logbooks for the airframe, engines, auxiliary power units (APU) and appliances as applicable as well as the FAA Form 337 for major repairs / alterations.
The Contractor is required to ensure all CAMP Task Cards, Required Inspection Items (RII), Logbook documentation, and Airworthiness Release procedures are properly completed as instructed in the JPATS training outlined in Section 3.
The Contractor will be responsible for the repair or replacement of any JPATS equipment that is damaged or destroyed by acts of negligence by the Contractor.
The Contractor will ensure the aircraft’s airstairs are not used for maintenance personnel to enter the aircraft or exit the aircraft.
The Contractor will permit the JPATS designated engine borescope technicians’ entrance into their Repair Station for performing borescope inspections.
The Contractor will complete and return Section 11 to the JPATS Contracting Officer.
4.1. Project Milestones
4.1.1. Engine Preservation
The #2 engine (ESN 876566) must be persevered on wing not later than October 24, 2023.
4.1.2. Engine Removal
The #2 engine (ESN 876566) must be removed from the aircraft not later than October 29, 2023.
4.1.3. Engine Shipment
The #2 engine (ESN 876566) must be ready for shipment to the engine repair station not later than October 29, 2023.
4.1.4. Emergency Escape Slide Removal
All emergency escape slides must be removed from the aircraft and shipped to the JPATS designated overhaul facility not later than October 20, 2023.
4.1.5. Cargo Fire Extinguisher Removal
Cargo fire extinguisher (Part Number 34600010-28, Serial Number 10539F1) must be removed from the aircraft and shipped to the JPATS designated overhaul facility not later than October 20, 2023.
5. Place of Performance
All work will be performed at the Contractor’s Title 14 CFR Part 145 Certificated Repair Station located within the contiguous United States.
6. Period of Performance
The induction date is October 17, 2023. JPATS anticipates a 45-calendar day performance period with a return to service date of December 4, 2023.
7. Warranty
The Contractor will provide the Government a copy of their standard commercial warranty.
8. Contract Administration Data
Only warranted Contracting Officers are authorized to issue and modify Government contracts, approve changes in any terms and conditions in a contract, or obligate funding. If the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made to the contract to cover any increase in costs that may result.
9. Right to Inspect / Audit
The Government reserves the right to inspect / audit the Contractor’s facility along with their current maintenance processes and procedures prior to delivering the aircraft for services. The Government must ensure the Contractor is providing services in accordance with their Title 14 CFR Part 145 Repair Station Certification.
The Government may terminate the contract if it has reason to believe the Contractor is not providing services in accordance with their certificate.
10. Deliverables
10.1. Aircraft Status Report
The Contractor is required to provide a daily Aircraft Status Report. The Aircraft Status Report must include, but not limited to, a comprehensive list of the following:
• Number of personnel assigned to the aircraft,
• The previous day’s maintenance activities,
• The current day’s planned maintenance activities,
• Outstanding parts,
• Repairs that require engineering assistance, and
• Any anticipated delivery delays.
10.2. Accruals
The Contractor must provide JPATS with a twice weekly accrual of all costs incurred as part of the maintenance visit.
The Contractor must provide written justification of any anticipated increases in funding required to complete the maintenance visit to the JPATS CO and COR.
10.3. Invoice
The Contractor must submit all invoices to the address designated in the contract to receive invoices and provide a copy to the COR and the CO, within thirty (30) days after the completion of the heavy maintenance visit.
10.4. Aircraft Records
The Contractor must ensure all aircraft records and all original aircraft parts certification documentation are mailed to JPATS within thirty (30) days after the completion of the heavy maintenance check.
The Contractor must provide all FAA required maintenance records to include JPATS historical logbooks for the airframe, engines, auxiliary power units (APU) and appliances as applicable as well as the FAA Form 337 for Major Repairs and Alterations.
The Contractor must provide an electronic copy (PDF Format) of all maintenance records completed during the heavy maintenance check.
Maintenance records are required to be separated and titled as outlined in Section 11.
10.5. Aircraft Parts
The Contractor must provide JPATS with all parts and materials removed from the aircraft as part of the maintenance visit. The JPATS COR will provide an appropriate disposition for all aircraft parts and materials.
11. Heavy Maintenance Check Requirements
Task Number
Sub- Task Service Firm Fixed
Price 1 Perform Monthly Check 2 Perform 1A Check 3 Perform 2A Check 4 Perform 4A Check 5 Perform 1C Check 6 Perform 2C Check 7 Perform 3C Check 8 Perform 4C Check 9 Perform Complete Aircraft Wash.
10 Paint underside / bottom of left and right wings.
(JPATS will provide Paint Livery)
11 Perform Engine Compressor Washes IAW AMM Task 72-00-00-100-803-F00.
12 Open-Up #1 Engine for Borescope Inspection.
Remove Borescope Inspection Ports and Outboard Igniter Plug and Reinstall After Completion of the Borescope Inspection.
13 Perform Task 80-010-01 Detailed Visual Inspection on #1 Engine Starter Magnetic Chip Detector.
14 Perform Task 80-010-01 Detailed Visual Inspection on #2 Engine Starter Magnetic Chip Detector.
15 Perform #2 Engine 365 Day Preservation IAW AMM Task 71-00-03-600-811-F00 in preparation for Shipment to Repair Facility. Note: Engine must be completely wrapped in vapor barrier and have desiccant bags installed.
16 Remove #2 Engine ESN 876566 for Shipment to Repair Facility IAW AMM Section 71-00-02.
17 Reinstall #2 Engine ESN 876566 After Repair IAW AMM Section 71-00-02.
18 Remove and Replace Left Hand Air Cycle Machine IAW AMM Section 21-51-04.
(JPATS will provide Air Cycle Machine)
19 Perform Task 23-060-00 (001.1) Operational Check Cockpit Voice Recorder at Battery Replacement.
20 Perform Task 23-070-00 (001.1) Replace Cockpit Voice Recorder Locator Beacon Battery.
(JPATS will provide DK120/90 beacon and battery)
21 Perform Task 24-010-01 Change Left IDG Oil.
22 Perform Task 24-010-02 Change Right IDG Oil.
23 Perform Task 24-040-01 Replace Left IDG Oil
Charge and Scavenge Filters.
(JPATS will provide filters)
Task Number
Sub- Task Service Firm Fixed
Price 24 Perform Task 24-040-01 Replace Right IDG Oil
Charge and Scavenge Filters.
25 Remove and Replace 4 each Emergency Escape Slides IAW Boeing Task Cards 25-240-00.
(JPATS will be responsible for overhaul)
26 Remove and Reinstall Cargo Compartment Fire Extinguisher Part Number 34600010-28, Serial Number 10539F1 IAW Boeing Task Card 26-360- 00-01.
(JPATS will be responsible for overhaul)
27 Perform Task 27-CMR-07 Detailed Visual Inspection of the Elevator Tab Rods, and Mechanism IAW Boeing Task Cards 27-093-00-04 and 27-093-00-02.
28 Perform Task 27-CMR-08 Functionally Check the Elevator Tab Freeplay IAW Boeing Task Cards 27- 099-00-01 and 27-099-00-02.
29 Perform Task 28-130-00 (001.1) Replace Engine Spar and APU Fuel Shutoff Battery.
(JPATS will provide battery)
30 Perform 28-AWL-19 Center Tank Boost Pump Automatic Shutoff System Test.
31 Perform 28-AWL-20 Boost Pump Ground Fault Interrupter (GFI) Test.
32 Perform 28-AWL-23 Functionally Check the Center Tank Fuel Pump Un-Commanded on System Test.
33 Perform Task 29-050-01 Replace the “A” System EDP Case Drain Filters.
34 Perform Task 29-050-02 Replace the “B” System EDP Case Drain Filters.
35 Perform Task 31-150-00 (001.1) Replace Flight Data Recorder Locater Beacon Battery.
(JPATS will provide DK120/90 beacon and battery)
36 Perform Task 31-140-00 (001.1) Operational Check Flight Data Recorder at Battery Replacement.
37 Perform Task 34-030-00 Accomplish Functional Leak Check of Standby Pitot System.
38 Perform Task 34-060-00 Accomplish Functional Leak Check of Standby Static System.
Number
Sub- Task Service Firm Fixed
Price 39 Perform Task 34-110-01 (001.1) Functional Check of ATC Transponder to Ensure it Meets the Requirement 14 CFR Part 91.413 and Part 43 Appendix F.
40 Perform Task 34-110-01 (002.1) Functional Check of ATC Transponder to Ensure it Meets the Requirement 14 CFR Part 91.413 and Part 43 Appendix F.
41 Perform Task 34-130-00 Discard the Dedicated Battery / Charger Internal Battery for the Integrated Standby Flight Display.
(JPATS will provide ISFD Battery)
42 Perform Task 38-030-00 Replace the Vacuum Blower Filter.
(JPATS will provide filter)
43 Perform Task 38-100-00 Replace the Waste Tank Water Separator Filter Baskets.
(JPATS will provide filter baskets)
44 Perform Task 49-102-00 Discard APU Fuel Control Inlet Filter.
(JPATS will provide filter)
45 Perform Task 49-140-00 Interrogate the CDUs APU Maintenance Pages, APU Data Memory Module, ECU, Speed Sensor, and EGT Rake.
46 Perform Task 52-CMR-01 Functional Check of the Locking and Unlocking Latch Bolt Mechanism on the Flight Deck Door Decompression Panel IAW CMM 52-51-06 Section Testing and Fault Isolation and IAW Boeing Task Card 52-360-00-01.
47 Perform Task 527002 Repetitive Inspection of Aft Cargo Door Dent at Lower Center IAW SRM 52- 30-01.
48 Perform Task 527001 Mapping and Inspection of the Forward Cargo Door Dent on lower side to determine if further inspections are required.
49 Perform Task 537001 Mapping and Inspection of Tail Compartment Dent STA 1048 BTW Stringer 5- 20R and 5-21R IAW SRM 53-00-01-1A-1 to determine if further inspections or corrective actions are required.
50 Remove and Replace Nose Landing Gear.
(JPATS will provide the nose landing gear)
51 Remove and Replace Left Main Landing Gear.
(JPATS will provide the left main landing gear)
52 Remove and Replace Right Main Landing Gear.
(JPATS will provide the right main landing gear)
Number
Sub- Task Service Firm Fixed
Price 53 Remove and Replace 4 each heat exchangers
IAW AMM Section 21-51-03.
(JPATS will provide heat exchangers)
54 Perform 28-ICA-01 Check Integrity of Center Wing Tank and Internal Components, Check Foam for Deterioration.
55 Perform Task 53-ICA-01 Detailed Visual Inspection of Forward Dual Iridium Antenna Aircraft Skin from STA 727 to STA 727A and between Stringer Centerline and Stringer Right Hand.
56 Perform 53-ICA-02 Detail Visual Inspection Aft Iridium Antenna Aircraft Skin from STA 727B to 727C and between Stringer Centerline Right Hand.
57 Perform 53-ICA-03 Detailed Visual Inspection GPS Antenna Aircraft Skin from STA 727B to STA 727C and between Stringer Centerline and Stringer Right Hand.
58 Perform 53-ICA-04 Detailed Visual inspection VHF Antenna Aircraft Skin from STA 344 to STA 360 and between Stringer L1 and Stringer L2.
59 Inspect All Cabin Window Reveals for Proper Installation and Damage.
Perform Task 56-ICA-01 General Visual Inspection of the Window Blanks, Support Structure and attaching Hardware for Damage or Fatigue Cracking.
61 Remove and Replace L-1 Door Liner.
62 Perform Task 78-CMR-01 Operational Check of the #1 and #2 Engine Thrust Reverser Sync Lock by performing Tasks 78-110-01 and 78-110-02.
63 Perform Service Bulletin 737-52-1169 Accomplishment Instructions 3.B. Part 3 Step 2 and Step 4.
YB-152 is a Group 3 Aircraft
64 Perform Service Bulletin 737-54-1049 Work Instructions 3.B.2.
YB-152 is a Group 1 Aircraft
65 Perform AD 2001-17-02 Paragraph (a).
65 a Perform Boeing Task Card 53-210-00. N/A 66 Perform AD 2005-18-23 Para (f)(2).
66 a Perform Service Bulletin 737-24A1148 Revision 1
Accomplishment Instructions 3.B. Part 3.
YB152 is a Group 1 Aircraft
N/A
Number
Sub- Task Service Firm Fixed
Price 67 Perform AD 2006-21-01 Paragraph (g)(2).
67 a Perform Service Bulletin 737-27-1273
Accomplishment Instructions 3.B. Part 1.
YB152 is a Group 1 Aircraft Note: Part 1 must be accomplished before Part
2. Reference AD 2006-21-01 Paragraph (j) for additional information.
N/A
68 Perform AD 2006-21-01 Paragraph (i)(3).
68 a Perform Service Bulletin 737-27-1273
Accomplishment Instructions 3.B. Part 2.
YB152 is a Group 1 Aircraft Note: BMS 3-33 grease must be used.
N/A
69 Perform AD 2011-12-13 Paragraph (g).
69 a Perform Service Bulletin 737-27-1289
Accomplishment Instructions 3.B. Work Instructions. YB152 is a Group 1 Aircraft
N/A
70 Perform AD 2011-27-03 Paragraph (g)(1)(i)(1).
70 a Perform Service Bulletin 737-27A1277 Revision 2
Accomplishment Instructions 3.B. Work Package 1.
YB152 is a Group 1 Aircraft
N/A
71 Perform AD 2011-27-03 Paragraph (g)(1)(i)(2). N/A 71 a Perform Service Bulletin 737-27A1277 Revision 2
Accomplishment Instructions 3.B. Work Package 1.
YB152 is a Group 1 Aircraft Note: Lubrication required in this paragraph is required under AD 2011-27-03 Paragraph (g)(1)(i)(1).
N/A
72 Perform AD 2013-15-16 Paragraph (g)(1)(i).
72 a Perform Service Bulletin 737-52A1167
Accomplishment Instructions 3.B. Part 3.
(JPATS will Provide Top Kit 002A0003-147)
N/A
73 Perform AD 2013-15-17 Paragraph (g)(1).
73 a Perform AWL 28-AWL-101 and Task 28-050-00
Operational Test of the Engine Fuel Suction Feed of the Fuel System.
N/A
74 Perform AD 2016-04-06 Paragraph (g).
74 a Perform Service Bulletin 737-26A1137
Accomplishment Instructions 3.B. Work Instructions.
YB152 is a Group 1 Configuration 2 Aircraft
N/A
75 Perform AD 2016-18-15 Paragraph (g)(2).
75 a Perform Service Bulletin 737-53A1248 Revision 2
Accomplishment Instructions 3.B. Part 1 Option 1 Inspections at S-5L to S-7L and S-5R to S-9R.
Number
Sub- Task Service Firm Fixed
Price 76 Perform AD 2017-02-10 Paragraph (g).
76 a Perform Service Bulletin 737-53-1294 Revision 2
Accomplishment Instructions 3.B.1 Part 1 – Inspection.
YB152 is a Group 1 Aircraft
N/A
77 Perform AD 2017-02-10 Paragraph (h).
77 a Perform Service Bulletin 737-53-1294 Revision 2
Accomplishment Instructions 3.B.2 Part 2 – Preventative Modification – Left Side.
YB152 is a Group 1 Aircraft (JPATS will provide Top Kit 002A0003-164)
N/A
77 b Perform Service Bulletin 737-53-1294 Revision 2 Accomplishment Instructions 3.B.3 Part 3 – Preventative Modification – Right Side.
YB152 is a Group 1 Aircraft (JPATS will provide Top Kit 002A0003-165)
N/A
78 Perform AD 2018-26-01 Paragraph (g)(1)(iv) on #1 Engine.
78 a Perform Service Bulletin CFM56-7B S/B 72-1033 Revision 3 Accomplishment Instructions.
N/A
79 Perform AD 2019-18-03 Paragraph (i) & (j).
79 a Perform AD 2019-18-03 Paragraph (i) and AMM
Section 78-31-03.
N/A
80 Perform AD 2021-09-06 Paragraph (i).
80 a Perform Boeing Multi-Operator Message MOM-
MOM-20-0443-01B (R1), dated June 2, 2020.
N/A
81 Perform AD 2021-21-09 Paragraph (g).
81 a Perform Service Bulletin 737-53-1251 Revision 2
Accomplishment Instructions 3.B. Group 1 Step 2.
YB152 is a Group 1 Aircraft
N/A
82 Perform AD 2022-06-06 Paragraph (h).
82 a Perform Service Bulletin 737-27A1314 Revision 2
Accomplishment Instructions 3.B.1 and 3.B.2.
YB152 is a Group 1 Aircraft (JPATS will provide Top Kit 002A0072-1)
N/A
82 b Perform Service Bulletin 737-27A1314 Revision 2 Accomplishment Instructions 3.B.3 and 3.B.4.
YB152 is a Group 1 Aircraft (JPATS will provide Top Kit 002A0072-2)
N/A
83 Perform AD 2022-24-09 Paragraph (g)(1)(i).
83 a Perform AD 2022-24-09 Paragraph (g) and Boeing
Task Card 31-020-00-01.
Note: Boeing Task 31-020-00-01 is required to be performed as part of the 2C Check.
Number
Sub- Task Service Firm Fixed
Price 84 Perform Task 08-WNB-01 Physical Aircraft Weight and Balance.
Note: N738A is equipped with a foam CWT Fire Retardant System. The CWT sumping for the weight and balance must be started days prior to the weighing of the aircraft to ensure all fuel is removed. Three separate weighs are required. (Task must be performed by PlaneWeighs) (Contact Information is Terry McCants (817) 885-8282; email:
terry@planeweighsusa.com)
85 Perform Service Bulletin 737-57-1310 Revision 2 Accomplishment Instructions 3.B.1, 3.B.2, 3.B.3, 3.B.4, 3.B.5, and 3.B.6.
(JPATS will provide 8 each 115A5282-4 washers)
86 Perform Task CMP 32-1 Functionally check landing gear control cable tension.
87 Replace Nose Landing Gear Conduit (2 each) Part Number 287A6212-7.
(JPATS will provide nose landing gear conduits)
88 Perform AD 2020-16-51 Paragraph (h).
Note: AD 2020-16-51 Paragraph (h) must not be performed earlier than two days prior to departure.
89 Perform Task 56-ICA-02 Detailed Inspection of the Window Blanks, Support Structure, and Attaching Hardware for Damage or Fatigue Cracking.
Detailed Inspection of the Window Blank also Includes Disassembly of the Window Blank and Inspection of the Inner Surface of the Window Blank for Cracks or Corrosion.
90 Perform Task 29-010-00 Gross Internal Hydraulic System Leakage Check.
91 Perform Task 23-ICA-01 Annual 14 CFR 91.207 ELT Check IAW JPATS Form 5540.10A-008.
92 Perform 14 CFR 91.411 Altimeter System and Altitude Reporting Equipment Tests and Inspections IAW JPATS 14 CFR 91.411 Altimeter System and Altitude Reporting Equipment Tests and Inspections Task Card.
93 Remove and Replace Horizonal Stabilizer Trim Actuator IAW AMM Section 27-41-81.
(JPATS will provide 251A4510-10 actuator)
Number
Sub- Task Service Firm Fixed
Price 94 Perform installation of Rockwell Collins STC
ST01470LA-D by utilizing Engineering Order 477- 23018-800.
(JPATS will provide 822-1710-002 Receiver Transmitter, 622-5129-802 Control Panel, 622- 5135-802, Antenna Drive Unit, and 622-5137-601 Antenna)
95 Non-routine work cards for discrepancies identified in accomplishing above checks and inspections.
Hourly Labor Rate:
96 Administrative fee for the procurement of aircraft part and materials:
12. Performance Standards
JPATS will primarily utilize the Contractor’s existing Quality Assurance System under Federal Acquisition Regulation (FAR) 12.208, Contract Quality Assurance, but will also assess the Contractor’s performance using the onsite COR and the Performance Standards referenced in Section 12.1.
12.1. Assessing Performance
JPATS will utilize the table below for assessing performance of the Contractor.
The table includes the PWS Section Number, Performance Standard, Acceptable Quality Level, and Monitoring Method.
PWS Number Performance Standard
Acceptable Quality Level
Monitoring Method
Aircraft Maintenance
Requirements in Section 11 Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Aircraft Unscheduled (non-routine) Maintenance Requirements
Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Appropriate Maintenance
Record Documentation
100%
Periodic review of aircraft maintenance record documentation.
PWS Number Performance Standard
Acceptable Quality Level
Monitoring Method
Airworthiness
Directives Completed
100%
Periodic review of documentation and spot-check adherence to policies.
Following Logistics Support Activities for the
Acquisition of Aircraft Parts and
Materials
100%
Periodic review of documentation and spot-check adherence to policies.
4 Aircraft Cleanliness 95%
Review of aircraft and aircraft documentation after the approval for return to service.
6 Aircraft Delivery Schedule 95% Return to Service
Date of the Aircraft
| 1. General |
| 1.1. Required Induction Date |
| 2. Contract Type |
| 3. JPATS Responsibilities |
| 4. Contractor Responsibilities |
| 4.1. Project Milestones |
| 4.1.1. Engine Preservation |
| 4.1.2. Engine Removal |
| 4.1.3. Engine Shipment |
| 4.1.4. Emergency Escape Slide Removal |
| 4.1.5. Cargo Fire Extinguisher Removal |
| 5. Place of Performance |
| 6. Period of Performance |
| 7. Warranty |
| 8. Contract Administration Data |
| 9. Right to Inspect / Audit |
| 10. Deliverables |
| 10.1. Aircraft Status Report |
| 10.2. Accruals |
| 10.3. Invoice |
| 10.4. Aircraft Records |
| 10.5. Aircraft Parts |
| 11. Heavy Maintenance Check Requirements |
| 12. Performance Standards |
| 12.1. Assessing Performance |