This is a Statement of Work (SOW) from Brookhaven National Laboratory for the manufacture and delivery of high-performance permanent magnet blocks for hybrid dipoles and quadrupoles.

The National Synchrotron Light Source II (NSLS-II) division is upgrading its 792-meter circumference storage ring by replacing two electromagnetic dipoles with hybrid magnet systems. The contractor must manufacture, inspect, test, and deliver 100 hybrid dipole permanent magnet (PM) blocks and 68 hybrid focusing and defocusing PM blocks. All blocks must be constructed from Samarium Cobalt (Sm2Co17) material with specified magnetic parameters: remanent flux density of 1.14 Tesla minimum (±0.02T from average), coercive field of 1740 kA/m minimum, and maximum energy product of 240 kJ/m³ minimum, all measured at a nominal reference temperature of 20°C. Each block requires a permanently laser-etched magnetization direction arrow conforming to provided technical drawings (LT-SR-MG-PMQH-3001 and LT-SR-MG-PMQH-4001). All PM blocks must comply with geometric and magnetization angle tolerances specified in the supplied drawings; if required dimensions necessitate segmenting and gluing smaller blocks, detailed assembled geometry drawings must be provided with the proposal.

The contractor must deliver comprehensive documentation including standard dimensional inspection reports with individually measured values traceable by serial identifier and magnetic material test certifications one week prior to shipping authorization. PM blocks must be packaged separately to prevent chipping and demagnetization in shipping containers meeting requirements for strong permanent magnets exceeding 1 Tesla. All deliverables must arrive at BNL no later than 18 weeks after contract receipt, with progress reports required every three weeks. The contractor shall maintain a documented quality management system and submit a proposal confirming ability to meet all requirements, identifying any requirements that cannot be met with clarification of alternative capabilities. This information is controlled under U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BROOKHAVEN NATIONAL LABORATORY

STATEMENT OF WORK

Permanent Magnet Blocks for Hybrid Dipoles & Quadrupoles

APPROVALS

Lead Meaianit Engineer

4/U ProjectEngineer

Research Engineer ME Group) Date I

LJfkj),..L Teainical Representative Date •

REVISION CONTROL SHEET

REVISION DESCRIPTION DATE WRITTEN APPROVED BY

BY

A Initial Release 06/22/2026 S. Sharma See cover page

Section 1: Introduction The National Synchrotron Light Source II (NSLS-II) division at Brookhaven National Laboratory (BNL) is planning for an upgrade of its storage ring (792-m in circumference) consisting of approximately 800 electromagnets placed in 30 identical cells. As a test of the new upgrade concept, 2 electromagnetic dipoles in 2 adjacent cells will be replaced by hybrid dipoles and quadrupoles built with permanent magnet (PM) blocks. The procurement of these high-performance PM blocks is covered by this Statement of Work (SOW). The precise technical and quality requirements are detailed herein.

Section 2: Scope of Work The Contractor shall provide the facility, equipment, construction of any needed tools and fixtures, personnel, and labor needed to manufacture, inspect, test, and deliver the high-performance permanent magnet blocks listed within this document.

Any nonconforming item(s) shall be clearly identified, isolated, and placed in a secured location by the Contractor.

The Contractor shall document the nonconformance and send it to the BNL Technical Representative for review and disposition.

The Contractor shall email the required documentation listed within this document to the BNL Technical Representative immediately upon completion of the deliverable items as detailed in (Section 9).

Section 3: BNL Furnished Documents BNL will provide the following technical drawings as engineering specifications for manufacturing:

• Drawing LT-SR-MG-PMQH-3001: Hybrid Dipole Permanent Magnet Blocks

• Drawing LT-SR-MG-PMQH-4001: Hybrid Focusing & Defocusing Permanent Magnet Blocks

Section 4: Permanent Magnet Material Requirements The magnetic material of the PM blocks must meet the following magnetic parameters.

Table-1: Permanent Magnet Material Parameters (Nominal Reference Temperature: 20 ⁰C)

Description Value

Material Type Samarium Cobalt (Sm2Co17)

Remanent Flux Density (Br) 1.14 T Minimum, Range ± 0.02 T from average Br

Coercive Field (Hcj) 1740 kA/m, Minimum

Maximum Energy Product ((BH)max) 240 kJ/m3, Minimum

Section 5: Magnetization Direction Arrow To ensure precise orientation during hybrid magnet assembly, a magnetization direction arrow shall be permanently laser etched onto each block. The placement, sizing, and orientation of the laser-etched arrow shall strictly conform to the details as per the furnished drawings (Section 3).

Section 6: Tolerances All PM blocks must comply with the geometric and magnetization angle tolerances as specified in the supplied drawings (Section 3). ). If the required dimensions of the permanent magnet (PM) blocks can only be achieved by segmenting and gluing smaller blocks together, the contractor shall provide detailed drawings of the assembled geometry with the quotation.

Section 7: Progress Reporting The Contractor shall communicate technical and manufacturing progress to the designated BNL Technical Representative every three weeks. Reports shall be delivered via email or conference call, as mutually agreed upon.

Section 8: Quality Assurance Requirements The Contractor shall maintain a robust, documented quality management system complying with all terms of this SOW and the master BNL contract.

The Contractor shall provide a comprehensive end-item documentation package serving as objective evidence of complete compliance with the BNL contract requirements. The documentation package shall be fully traceable to the physical items supplied and must include all records specified in the Deliverables Section 9.

Section 9: Deliverables The Contractor shall deliver the following items to BNL:

• Hybrid Dipole PM Blocks: One hundred (100) pieces.

• Hybrid Focusing & Defocusing PM Blocks: Sixty-eight (68) pieces.

• Documentation: Electronic copies of standard dimensional inspection reports (with individual measured values for every single block traceable by serial identifier) and magnetic material test certifications matching Table-1 requirements. The documentation is to be received at BNL 1 week prior to shipping authorization.

• Shipping Authorization: The contractor will be given authorization electronically by BNL to ship the PM blocks following the review of the documentation.

• Packaging and Shipping: The PM blocks will be packaged in separate boxes to prevent chipping and demagnetization. The shipping container shall meet the requirements of transportation of strong (> 1 T) permanent magnets.

Section 10: Delivery Schedule All permanent magnet blocks identified in the Deliverables Section 9 of this document shall be delivered to BNL no later than (18) eighteen weeks after receipt of a BNL contract.

Delay Notification: Any schedule variances or potential delays shall be promptly and formally communicated in writing to the BNL Technical Representative.

Section 11: Proposal The supplier shall submit a proposal to BNL confirming their ability to meet all the requirements defined in this document and on the BNL furnished drawings. Each requirement that the supplier cannot meet shall be identified in the proposal with clarification as to what they can provide.

Section 12: Export Control Disclaimer Statement This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.

SOW Page-1
SOW Page-1
SOW Page-2
STATEMENT OF WORK
Section 1: Introduction
Section 2: Scope of Work
Section 3: BNL Furnished Documents
Section 4: Permanent Magnet Material Requirements
Section 5: Magnetization Direction Arrow
Section 6: Tolerances
Section 7: Progress Reporting
Section 8: Quality Assurance Requirements
Section 9: Deliverables
Section 10: Delivery Schedule
Section 11: Proposal
Section 12: Export Control Disclaimer Statement