This is a Phase I solicitation (W9127N25RA021) for the Bonneville Spillway Gantry Crane Rehabilitation project, issued by the U.S. Army Corps of Engineers Portland District. The project is a two-phase design-build contract for rehabilitating two identical spillway gantry cranes (Cranes 5 and 6) located at the Bonneville Dam in Skamania County, Washington and Multnomah County, Oregon. The acquisition is a firm-fixed-price contract with an estimated value between $10 million and $25 million, using a best-value tradeoff source selection process with a 10% HUBZone price evaluation preference.
The project scope involves comprehensive rehabilitation of the gantry cranes, including structural, mechanical, and electrical upgrades. Key requirements include design and rehabilitation to improve crane reliability and safety, with specific constraints such as maintaining gate splitting and lifting capabilities, ensuring one crane remains operational during fish passage periods, and limiting vehicular traffic on the spillway bridge. Optional work includes inspecting and refurbishing components like hoist drums, lifting beams, roofing panels, and repainting. The contractor will be responsible for design, execution, testing, and warranty of the crane rehabilitation, with detailed technical specifications provided in the solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C.docx | DOCX document | |
| Attachment B.docx | DOCX document | |
| Attachment D.docx | DOCX document | |
| Solicitation Amendment W9127N25RA0210002 SF 30.pdf | ||
| Solicitation Amendment W9127N25RA0210001 SF 30.pdf | ||
| Attachment A.docx | DOCX document | |
| Attachment A - Offeror Experience Form.docx | DOCX document | |
| A.03 Plans - Drawings - BDD-1.111 Bonneville Spillway Gate Gantry Cranes Reliability Restoration.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
W9127N25RA021
Bonneville Dam North Bonneville, Skamania County, Washington
SPILLWAY GANTRY CRANE REHABILITATION
TWO-PHASE DESIGN BUILD SOLICITATION - PHASE I
Project Manual
TOC-1
BONNEVILLE SPILLWAY GANTRY CRANES RELIABILITY RESTORATION
TWO-PHASE DESIGN BUILD SOLICITATION - PHASE I
NORTH BONNEVILLE, SKAMANIA COUNTY, WASHINGTON
TABLE OF CONTENTS
00 10 00 SOLICITATION, OFFER, AND AWARD FORM (SF 1442)
00 00 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 73 00 SUPPLEMENTARY CONDITIONS
GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS
ATTACHMENTS
A1: Washington Davis Bacon Wage Rates
A2: Oregon Davis Bacon Wage Rates
00 71 00 CONTRACTING DEFINITIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
00 22 10 TWO PHASE - PHASE ONE
00 22 20 TWO PHASE - PHASE TWO
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 20 00 INSTRUCTIONS FOR PROCUREMENTS
00 72 00 GENERAL CONDITIONS
01 00 00 GENERAL REQUIREMENTS
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
I
I
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
I
► I □ □ I
Section 00 00 00 - Procurement and Contracting Requirements
BONNEVILLE SPILLWAY GANTRY CRANE REHABILITATION
00 00 00-3
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Total Proposal: $___________________________________________
Total Base CLIN's 0001 - 0014: $___________________________________________
Total Option CLIN's 0015 - 0020: $___________________________________________
NOTE 1: PLEASE BE SURE TO INCLUDE UNIT PRICES ROUNDED TO TWO (2) DECIMAL PLACES.
NOTE 2: EXCEPT WHEN IT IS DETERMINED IN ACCORDANCE WITH FAR 17.206(B) NOT TO BE IN THE GOVERNMENT'S BEST INTERESTS, THE GOVERNMENT WILL EVALUATE BIDS FOR AWARD PURPOSES, BY ADDING THE TOTAL PRICE FOR ALL OPTIONS TO THE TOTAL PRICE FOR THE BASIC REQUIREMENT. THE EVALUATION OF OPTIONS WILL NOT OBLIGATE THE
GOVERNMENT TO EXERCISE THE OPTION.
NOTE 3: THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL ITEMS 15 through 20 NO LATER THAN NO LATER
THAN 90 DAYS AFTER NOTICE TO PROCEED.
Item Supplies/Service Quantity Unit Unit Price Amount
Mobilization and Demobilization
Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site.
This Contract Line-Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.
Pricing Arrangement: Firm Fixed Price
1 Job
Design Spillway Cranes 5 and 6 Refurbishment
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of
1 Job
00 10 00-4 as-built drawings for the spillway cranes 5 and 6 refurbishment.
Pricing Arrangement: Firm Fixed Price
Structural Rehabilitation of Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the structural features of Crane 5 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and optional scope items.
Pricing Arrangement: Firm Fixed Price
1 Job
Mechanical Rehabilitation of Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the mechanical features of Crane 5 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and optional scope items.
Pricing Arrangement: Firm Fixed Price
1 Job
Electrical Rehabilitation of Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the electrical features of Crane 5 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and the power distribution runway conductor and collector system.
Pricing Arrangement: Firm Fixed Price
1 Job
Operators Cab Replacement of Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for replacement of the operators cab for Crane 5 as detailed in 01 11 00.10 25 DESIGN
BUILD: SUMMARY OF WORK.
Pricing Arrangement: Firm Fixed Price
1 Job
Structural Rehabilitation of Crane
00 10 00-5
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the structural features of Crane 6 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and optional scope items.
Pricing Arrangement: Firm Fixed Price
1 Job
Mechanical Rehabilitation of Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the mechanical features of Crane 6 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and optional scope items.
Pricing Arrangement: Firm Fixed Price
1 Job
Electrical Rehabilitation of Crane
Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for construction of the electrical features of Crane 6 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK, excluding costs for the new operators cab and the power distribution runway conductor and collector system.
Pricing Arrangement: Firm Fixed Price
1 Job
Operators Cab Replacement for Crane
Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for replacement of the operators cab for Crane 6 as detailed in 01 11 00.10 25 DESIGN
BUILD: SUMMARY OF WORK.
Pricing Arrangement: Firm Fixed Price
1 Job
Replace Power Distribution Runway Conductor and Collector System
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for the replacement of the existing bus bar system with either a bus bar system or a cable reel system as detailed in 01 11 00.10 25 DESIGN BUILD:
1 Job
00 10 00-6
SUMMARY OF WORK paragraph Electrical item (c).
Pricing Arrangement: Firm Fixed Price
Training, Commissioning, and Testing for Crane 5
Measurement will be made as a job providing full compensation for furnishing of all material, labor, and equipment for the Contractor's effort to provide training, commissioning, performance load testing, and acceptance testing for the rehabilitation of Crane 5 both at the factory and on-site, and for the training materials, training manuals, and Operations & Maintenance Manuals.
Pricing Arrangement: Firm Fixed Price
1 Job
Training, Commissioning, Testing, and Manuals for Crane 6
Measurement will be made as a job providing full compensation for furnishing of all material, labor, and equipment for the Contractor's effort to provide training, commissioning, performance load testing, and acceptance testing for the rehabilitation of Crane 6 both at the factory and on-site, and for the training materials, training manuals, and Operations & Maintenance Manuals.
Pricing Arrangement: Firm Fixed Price
1 Job
Spare Parts
Measurement will be made as a job providing all material, labor, plant, and equipment for the Contractor's effort to deliver the new spare parts for the gantry cranes to the Bonneville project site, including all special tools.
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Inspect and Refurbish Crane 5 Drums, Gears, Lifting Beams, and Sheaves
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for inspecting, designing, and refurbishing the hoist drums, gears, lifting beams, and sheave nests for Crane 5 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK paragraph Structural items (f) and (g) and
1 Job
00 10 00-7 paragraph Mechanical item (h).
Pricing Arrangement: Firm Fixed Price
Option Line Item
Replace Roofing Panels for Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for design and replacement of roofing panels for Crane 5 as detailed in 01 11 00.10
25 DESIGN BUILD: SUMMARY OF WORK
paragraph Structural item (h).
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Clean and Paint Crane
Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for cleaning and painting all previously painted surfaces for Crane 5 as detailed in
01 11 00.10 25 DESIGN BUILD: SUMMARY
OF WORK paragraph Structural item (i).
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Inspect and Refurbish Crane 6 Drums, Gears, Lifting Beams, and Sheaves
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for inspecting, designing, and refurbishing the hoist drums, gears, lifting beams, and sheave nests for Crane 6 as detailed in 01 11 00.10 25 DESIGN BUILD: SUMMARY OF WORK paragraph Structural items (f) and (g) and paragraph Mechanical item (h).
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Replace Roofing Panels for Crane
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for design and replacement of roofing panels for Crane 6 as detailed in 01 11 00.10
25 DESIGN BUILD: SUMMARY OF WORK
paragraph Structural item (h).
Pricing Arrangement: Firm Fixed Price
1 Job
Clean and Paint Crane 6
00 10 00-8
Option Line Item
Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals for cleaning and painting all previously painted surfaces for Crane 6 as detailed in
01 11 00.10 25 DESIGN BUILD: SUMMARY
OF WORK paragraph Structural item (i).
Pricing Arrangement: Firm Fixed Price
1 Job
00 10 00-9
Section 00 20 00 - Instructions for Procurements
FAR Clauses Incorporated by Full Text
52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995) Alternate I (Feb 1995)
Alternate I . If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of (Feb 1995) the basic provision:
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for: SITE VISIT WILL BE HELD DURING PHASE II
(c) Participants will meet at the project location located at:
Bonneville Dam Exit 40 I-84 Bonneville Lock and Dam Cascade Locks, OR 99704
Requirements:
There will be only one site visit offered. Offerors planning to attend must register for this site visit by sending an email to the following individuals:
o Andrew Sprys (Andrew.J.Sprys@usace.army.mil) o Alicia Evans (Alicia.G.Evans@usace.army.mil)
Hard hats and steel-toed boots are required.
Please observe all posted speed limits while at the project.
In order to attend the site visit each individual participant's registration must be received by: SITE VISIT WILL BE HELD DURING PHASE
II
Site visit attendees must provide the following information:
o Solicitation Number W9127N25RA021 o Project Title: Bonneville Spillway Gantry Crane Rehabilitation o Name(s) of individual(s) attending site visit:
o Name of Company:
o Phone Number:
o Email Address:
o Are all individuals U.S. Citizens?
**Non-U.S. citizens may attend this site visit if they have a valid Foreign Visitor Authorization (FVA). Personally Identifiable Information will be very closely held in accordance with Army policy.
Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another.
If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.
Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, "Personal Protective and Safety Equipment." It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location.
00 20 00-1
Section 00 21 00 - Instructions
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-7 System for Award Management. Nov 2024 52.204-22 Alternative Line Item Proposal. Jan 2017 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. May 2014
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements. Nov 2023
FAR Clauses Incorporated by Full Text
52.233-2 Service of Protest. (Sep 2006)
Service of Protest (Sept 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that (a) are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Contracting Officer (Cect-Nwp) Alicia Evans Alicia.G.Evans@usace.army.mil Portland District, Corps of Engineers P. O. Box 2946 Portland, Oregon 97208-2946
The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.(b)
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars https://www.acquisition.gov/afars
(End of provision)
52.252-5 Authorized Deviations in Provisions. (Nov 2020)
Authorized Deviations in Provisions (Nov 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement[insert regulation name](48 CFR Chapter2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
00 21 00-1
00 21 00-2
Section 00 21 16 - Instructions to Proposers
A. Instructions to Proposers (Section 00 21 16)
For clarity, the addressed section shall reference the Solicitation. The identified sections are in accordance with (IAW) the Construction Specifications Institute (CSI) pursuant to U.S. Army Corps of Engineers Desk Guide (UDG) 5114.201-1.
Section 0021 16 of the Solicitation (Request for Proposal (RFP)) contains the proposal submission instructions. Section 00 21 16 includes specific information on what must be furnished with the offer and identifies evaluation criteria that will be used in evaluating proposals received. Section 00 22 16 contains the basis of award and evaluation methods/ratings for Phase One. Section 00 22 18 contains the basis of award and evaluation methods /ratings for Phase Two.
1. Introduction
1.1. The Solicitation is an unrestricted full and open competitive acquisition using the Federal Acquisition Regulation (FAR) Subpart 36.3, Two- Phase Design-Build Selection Procedures, and FAR 15.101-1, Tradeoff Source Selection Process (i.e., Best Value Tradeoff). A Solicitation will be issued for the acquisition during Phase One and will be amended for Phase Two, pursuant to FAR 36.3 and FAR 15.101-2 best-value tradeoff (BVTO) source selection process to award a firm-fixed-price (FFP) type contract.
1.2. The Government intends to make an award without discussions but reserves the right to conduct discussions should the Contracting Officer decide discussions necessary or advantageous to the Government. Because the Government does not intend to hold discussions, all Offerors are encouraged to put forth their best proposal.
1.3. In Phase One of the Two-Phase Design Build selection procedures, interested Offerors will submit specified performance capability proposals for review, consideration, and evaluation by the Government. Phase One proposals should be based on the project description and the Phase One evaluation factors, identified below. Based on the results of the Phase One evaluation, the Government will select up to five of the most highly qualified firms to submit Phase Two proposals. The amended Phase Two Solicitation will require the submission of technical and price proposals.
Phase Two evaluation will be based on the Phase Two evaluation factors that were developed IAW FAR 15.304.
Note: Do not submit cost/pricing information in the Phase One proposal.
1.4. Pursuant to Defense Federal Acquisition Regulation Supplement (DFARS) 236.204, the magnitude of construction is between $10 million and $25 million.
1.5. The primary North American Industry Classification System (NAICS)code for the acquisition is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45 million.
1.6. Selection will be made based on the responsible Offeror whose proposal conforms to the Solicitation requirements while demonstrating high technical capability and low risk, presenting the most advantageous offer to the Government IAW FAR Subpart 36.3- Two Phase Design-Build Selection Procedures, FAR 15.101-1- Tradeoff Source Selection Process (i.e., Best Value Tradeoff), and the Solicitation. The Government reserves the right to accept other than the lowest-priced offer or to reject all proposals.
1.7. For Phase One, the Government intends to make a selection without affording an opportunity to submit additional information but reserves the right to allow updates to proposals if it is advantageous to the Government. Because the Government does not intend to request or allow additional information, the Offeror is encouraged to put forth its best proposal. The Government intends to evaluate the Offerors proposals and select the most highly qualified offerors without discussions. Therefore, the Offeror's initial proposal should contain its best terms, as stated in herein. The Government reserves the right to conduct discussions/negotiations in Phase One if the Contracting Officer (KO)and Source Selection Authority (SSA) later determines them to be necessary. If discussions are held, a competitive range determination will be made. If the SSA determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted; the SSA may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
1.8. The Government will not reimburse any cost incurred or associated with preparing and submitting any responses to the Solicitation. Oral explanations or instructions to Offerors are not binding. Any information given to an Offeror which impacts the Solicitation and/or offers will be provided in the form of a written amendment to the Solicitation. It is the Offeror's responsibility to acknowledge all amendments in its proposal submission.
1.9. The Offeror should not modify the terms and conditions of the Solicitation in their technical proposals or add conditions or qualifications to their offers. Should an Offeror include terms and conditions that conflict with the terms and conditions of the Solicitation, the Offeror may be determined ineligible forward. Any questions related to specific terms and conditions contained within the Solicitation should be resolved prior to the submission of an offer.
1.10. All proposals received will be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or referred to other sources outside the respective proposal volumes and factors responses. The successful Offeror will be selected solely based on the evaluation factors below. Accordingly, proposals submitted in response to the Solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.
1.11. Proposals that reiterate "Parroting" the contents of the Solicitation, or contain only superficial responses, may be considered unacceptable.
Evidence of experience, capability, and qualifications demonstrating and supporting the Offeror's claims is essential. The absence of such evidence will adversely influence the evaluation of the proposal.
W9127N25RA021
00 21 16-1
1.12. References to "confidential" projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror's technical proposal. The Offeror including confidential information in its proposal that they do not want to be disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall clearly mark their proposals IAW the instructions at FAR Clause 52.215-1, Instructions to Offerors-Competitive Acquisition, paragraph (e), Restriction on disclosure and use of data.
1.13. Use of the words "shall" or "must" indicate a mandatory requirement for which failure to comply at the time and date for submission of proposals may result in the Offeror's proposal being disqualified from consideration for the award, or a deficiency or weakness being assessed for the factor. Failure to comply with non-pricing or pricing requirements annotated with the words "should" or "may" can result in an unacceptable, affecting the Offeror being selected for the contract award. The Government may elect to initiate discussions with some or all of the Offerors, thereby providing a means by which appropriate corrections by the Offeror(s)involved can be made. If the requirement is stated as a number of days, the time period is specified as calendar days, unless otherwise specified.
1.14. Who May Submit? In Phase One, any responsible, interested contractors may submit a proposal. For Phase Two, only the Offerors that are selected in Phase One to participate in Phase Two will be allowed to submit a proposal.
2. E-Business Registration Requirements
2.1. System for Award Management (SAM): The Offeror shall be registered in SAM at the time an offer is submitted. Failure to have an active and completed registration in SAM may determine an Offeror ineligible for the award and removed from the competition. A successful Offeror with incomplete or expired registrations at the time of award may not be eligible for a contract. In such instances, the Government will award to the next successful Offeror who is eligible for the award. Information contained within an Offeror's registration shall be current and valid. The responsibility of maintaining current information contained in an Offeror's registration rests solely on the Offeror.
2.2. Solicitation Inquiries (Phase One and Two)
All inquiries regarding the Solicitation are to be submitted via ProjNet: https://www.projnet.org/.
Telephone and e-mail inquiries will not be accepted. ProjNet is a web-based program that allows offerors to post question regarding the Solicitation, view all questions submitted by other offerors and the corresponding responses by the Government.
a. The Offerors shall only submit one question per inquiry. All inquiries containing multiple questions will be rejected.
b. The Offerors will receive an acknowledgement of its question(s) via e-mail, followed by an answer to its question(s) after it has been processed.
The Offerors may view all inquiries through ProjNet.
c. Inquiries shall be submitted seven-calendar days prior to the proposal due date. The Offerors will not be able to submit inquires after this date.
To submit and review inquiries, offerors will need to use the inquiry key presented below and follow the instructions listed below the key for access.
The Inquiry Key is: ICG28Q-45FMV5
Note: The Bidder Inquiry Key for Phase Two will be issued by amendment.
Specific Instructions for ProjNet inquiry access:
From the ProjNet home page link: https://www.projnet.org/projnet/ click on Quick Add (upper right side of the screen).
Identify the Agency: This should be marked as "USACE."
Key: Enter the Inquiry Key listed above.
E-mail: Enter the e-mail address you would like to use for communication.
W9127N25RA021
00 21 16-2
Click Continue. A page will then open saying that a user account was not found, and it will ask you to create one using the provided form.
Enter your first and last name, company, city, state, phone, e-mail, secret question, secret answer, and time zone. Make sure to remember your secret question and answer, as they will be used from the point you access the ProjNet system.
Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Submit questions or review questions and answers. An offeror who submits a question will receive an automated e-mail notification that its question has been received. When an answer is posted to a question, the question and answers are then available for all other offerors to review.
2.3. The Government intends to hold an organized site visit between the conclusion of the Phase One prequalification and the submittal of offers in Phase Two of the Solicitation. Details will be provided in the Phase Two amendment, and all Phase Two offerors are highly encouraged to attend in person.
2.4. . A joint venture (JV) is defined as a legal business entity formed between two or more companies to undertake the performance Joint Venture activities of a contract together. The Offerors proposing as JV shall provide evidence that the JV as a legal entity has been duly formed. The JV shall include a copy of the legal JV agreement signed by an authorized officer from each of the firms comprising the JV, with the Chief Executive of each entity identified. The Government will not evaluate the capability of any firms that are not included in the JV agreement. If submitting a proposal as a JV, the experience of each of the JV partners can be submitted for the JV entity. The experience of either JV partner will be considered the experience of the JV entity. Prospective Offerors that submit proposals may not change their JV firms, if selected for award. Ifan Offeror is a JV, the JV entity shall have a valid registration representing the JV as one entity in SAM. The Government will not accept separate registrations and licenses from each separate entity representing the JV.
2.5. Unsuccessful offerors will be notified IAW FAR Subpart 15.5. An unsuccessful offeror may request a pre-award debriefing or a delayed debriefing after award (post-award debriefing) by submitting a written request to the SSA/Contracting Officer within three-calendar days after receipt of the notice excluding an offeror from the competition and award. The Offerors are entitled to no more than one debriefing for each proposal (i.e., either a pre- or post-award debriefing).
3. Proposal Volume Instructions, Requirements, Contents, and Format
3.1 Phase One - Instructions to Offerors
3.1.1 Content - General
An Offeror's proposal without the minimum content may be determined ineligible to continue to Phase Two. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The Government may reject incomplete proposals after initial evaluation without further consideration.
All information intended to be evaluated as part of the technical proposal shall be submitted within the technical proposal. Do not include references to material or information not found within its respective volumes. Information submitted in the wrong volumes could lead to an Offeror's proposal being determined unacceptable if materially incomplete in any aspect.
The Government will not evaluate any material that exceeds the page limits specified within each evaluation factor. Elaborately prepared proposals are optional, and any material over what is requested, such as corporate marketing information, will not be considered.
The submission shall be clearly indexed and logically assembled. The Offeror's proposal must set forth full, accurate, and complete information as required by the Solicitation. Absence of information will be deemed as if no support for that criterion was provided. The Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the Solicitation. Penalty for making false statements in its proposal is prescribed in Title 18 United States Code (U.S.C.)
Section 1001.
3.1.2 File Format
W9127N25RA021
00 21 16-3
Proposals shall be in Adobe Acrobat Portable Document Format (PDF) in a searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
3.1.3 Proposal Format
Cover Page: A cover page shall appear at the beginning of each volume and, at a minimum, shall consist of the following information:
Solicitation Number
The Offeror's name, physical mailing addresses, telephone number, and email address of the official having the authority to bind the Offeror contractually.
The Offeror's (if a JV provide each firm's) Unique Entity Identifier (UEI), Commercial and Government Entity (CAGE) code, and Tax Identification Number (TIN).
Table of Contents: The Offeror shall provide a table of contents, placed in each volume, and shall identify major areas by title, volume location, and page number.
Proposals shall be sized to print on 8-1/2 X 11-inch (in) paper (11-in X 17-in for drawings). Margins shall be no smaller than a 1/2-in; font face shall be Times New Roman or Arial, and font size shall be no smaller that 10-point font. Page is defined as a single sheet of paper with text on one side.
Pages furnished for organizational purposes only, such as a cover page or a table of contents, are not included in the page limitation. LOC and JV partner agreements are also not included in the page limitation.
Proposal volume organization, number of copies, and page limits: The Offeror shall prepare its proposal as set forth below. The Government will not evaluate any pages that exceed the page limitations identified in the Solicitation.
Volumes: The Offeror shall provide two separate proposal volumes for Phase One: Volume I - Pro Forma Information and Volume II - Technical (Non-Price) Proposal. Each Volumeshall be clearly marked as follows:
W9127N25RA021- OFFEROR NAME- VOLUME I
W9127N25RA021- OFFEROR NAME-VOLUME II
Electronic Submissions: Offerors must submit their proposals no later than the time and date specified in Block 13 of the Standard Form 1442, electronically via email to:
Andrew Sprys at andrew.j.sprys@usace.army.mil
Ms. Alicia Evans at alicia.g.evans@usace.army.mil
Note: The Portland District is in the Pacific Time Zone. No hard copies will be accepted.
Table 1.Phase One Submittals
Volum e
Tab Volume Title Copie s
Page Limit
(any pages over the page limit will not be reviewed)
I Pro Forma Information
1 No page limit
W9127N25RA021
00 21 16-4
II Technical (Non-Price) Proposal
A Factor 1: Past Performance 1 24 total pages
B Factor 2: Management Approach
1 20 total pages
Volume I - Pro Forma Information
Tab A: Standard Form1442 Not Rated
Tab B: Joint Venture Agreement Not Rated
Volume II - Technical (Non-Price) Proposal
Factor I - Tab A - Past Performance
Prime Contractor Equal to DOR
Designer of Record (DOR) Equal to Prime
Factor2 - Tab B - Management Approach
3.1.4 PhaseI Relative Importance:
Factor1: Past Performance is the most important factor. Factor 2: Management Approach is least important factor.
3.2 Phase Two - Instructions to Offerors
Note: The Phase Two "Instructions to Offerors" are subject to change before issuance of the Phase Two RFP.
3.2.1 Content-General
The Government intends to make an award without discussions but reserves the right to conduct discussions should the Contracting Officer decide discussions necessary or advantageous to the Government. An Offeror's proposal without the minimum content may be determined ineligible for award and removed from the competition. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The Government may reject incomplete proposals after initial evaluation without further consideration.
All information intended to be evaluated as part of the technical proposal shall be submitted within the technical proposal. Do not include references to material or information not found within its respective volumes. Information submitted in the wrong volumes could lead to an Offeror's proposal being determined unacceptable if materially incomplete in any aspect.
The Government will not evaluate any material that exceeds the page limits specified within each evaluation factor. Elaborately prepared proposals are optional, and any material over what is requested, such as corporate marketing information, will not be considered.
The submission shall be clearly indexed and logically assembled. The Offeror's proposal must set forth full, accurate, and complete information as required by the Solicitation. Absence of information will be deemed as if no support for that criterion was provided. The Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the Solicitation. Penalty for making false statements in its proposal is prescribed in Title 18 United States Code (U.S.C.)
Section 1001.
00 21 16-5
3.2.2 File Format
Proposals shall be in Adobe Acrobat Portable Document Format (PDF) in a searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
3.2.3 Proposal Format
: A cover page shall appear at the beginning of each volume and, at a minimum, shall consist of the following information:Cover Page
Solicitation Number
The Offeror's name, physical mailing addresses, telephone number, and email address of the official having the authority to bind the Offeror contractually.
The Offeror's (if a JV provide each firm's) Unique Entity Identifier (UEI), Commercial and Government Entity (CAGE) code, and Tax Identification Number (TIN).
Table of Contents: The Offeror shall provide a table of contents, placed in each volume, and shall identify major areas by title, volume location, and page number.
Proposals shall be sized to print on 8-1/2 X 11-inch (in) paper (11-in X 17-in for drawings). Margins shall be no smaller than a 1/2-in, font face shall be Times New Roman or Arial, and font size shall be no smaller that 10-point font. Page is defined as a single sheet of paper with text on one side.
Pages furnished for organizational purposes only, such as a cover page or a table of contents, are not included in the page limitation. LOC and JV partner agreements are also not included in the page limitation.
Volumes: The Offeror shall provide three separate proposal volumes for Phase Two: Volume I - Pro Forma Information, Volume II - Technical Proposal, and Volume III-Cost/Price. Each Volume shall be clearly marked as follows:
W9127N25RA021- OFFEROR NAME- VOLUME I
W9127N25RA021- OFFEROR NAME- VOLUME II
W9127N25RA021- OFFEROR NAME-VOLUME III
Proposal volume organization, number of copies, and page limits: The Offeror shall prepare its proposal as set forth below. The Government will not evaluate any pages that exceed the page limitations identified in the Solicitation.
Table 2. Phase Two Submittals
Volu me
Tab Volume Title Copi es
Page Limit
(any pages over the page limit will not be reviewed)
I Pro Forma Information
1 No limit
II Technical Proposal
W9127N25RA021
00 21 16-6
A Factor 3: Technical Approach for Design Build
1 25 total pages, excluding any schedule provided
B Factor 4: Small Business Commitment 1 No limit
III Factor 5: Cost/Price 1 No limit
Volume I - Pro Forma Information
Tab A: Joint Venture Agreements Not Rated
Tab B: Pre-Award Information Not Rated
Volume II - Technical (Non-Price) Proposal
Factor 3 -Tab A - Technical Approach for Design Build
Factor 4 -Tab B - Small Business Commitment Document
Volume III - Cost/Price
Tab A: Standard Form 1442 and Price Breakout Schedule Tab B: Subcontracting Plan (Full and Open Only)
3.2.4 Phase Two Relative Importance of Evaluation Factors:
Factor 3: Technical Approach for Design Build is the most important. Factor 4: Small Business Commitment is the least important factor. The non-priced factors, when combined, are approximately equal to price.
NOTE TO PROPOSERS
In accordance with FAR 52.102(c), the following provisions and clauses, available at www.acquisition.gov, require your review and action:
52.204-8 52.219-1 52.219-28 52.222-5 52.223-3 52.223-9 52.225-9 52.229-11 52.236-13 Alt. I 252.204-7007
00 21 16-7
252.236-7001
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-16 Commercial and Government Entity Code Reporting. Aug 2020
00 21 16-8
Section 00 22 10 - Two Phase - Phase One
A. Supplementary Instructions to Offerors for Phase One
1. Phase One - Basis of Award
1.1 . The Government is using a two-phase procurement approach for this design-build project. One Solicitation will be issued for Evaluation Process the acquisition consisting of a Request for Proposal (RFP) during Phase One pursuant to FAR 36.3and an amendment to the RFP during Phase Two pursuant to FAR 15.101-1.
The Government intends to evaluate offerors' Phase One proposals and select up to five (5) of the most highly qualified Offerors, without discussions, for advancement to Phase Two. Therefore, the offeror's initial proposal should contain its best terms, as stated in the Solicitation, Section 00 21 16. As stated in 1.6 below, the Government reserves the right to conduct discussions/negotiations if the SSA later determines them to be necessary. If discussions are held, a competitive range determination will be made. If the SSA determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the SSA may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
1.2 Compliance with The Offerors are cautioned to submit sufficient information in the format specified in the proposal Terms and Conditions.
preparation instructions. Failure to comply with the terms and conditions of the Solicitation may result in the Offeror being removed from consideration for award.
1.3 Adequacy of . The proposal will be evaluated to determine whether the Offeror's proposal adequately and completely considered, Response defined, and satisfied the requirements as specified in the Solicitation. The proposal will be evaluated to determine whether each requirement has been sufficiently addressed in the proposal IAW the proposal submission section of the Solicitation. The SSEB must not assume that an Offeror's performance includes the requirements of the Solicitation that are not specified in the Offeror's proposal.
1.4 . The Government may reject any proposal that is evaluated and determined to be unacceptable or fails to comply with the Rejection of Proposals Solicitation terms and conditions.
1.5 The Offeror's proposal shall meet the criteria stated in the Solicitation to be eligible for award, to include responsibility, and technical acceptability.
1.6 . The Government intends to select Offerors for participation in Phase Two based on the initial Phase One proposals without Discussions holding discussions. However, the Government reserves the right to conduct discussions, and allow proposal revisions, if the SSA determines that discussions are in the Government's best interest. The Offerors are cautioned that discussions may not be conducted and should not assume that they will have an opportunity to revise their proposals after submission.
If discussions are deemed necessary, the SSA will include only those firms determined to be the most highly rated; those whose proposals are reasonably susceptible to being made acceptable; but not those that are so deficient as to essentially require major revisions or a total re-write of their proposal. In certain circumstances, the Government may limit Offers in the competitive range to a number that will permit an efficient competition. If discussions are required, the SSEB will follow the evaluation process herein until discussions are closed. Upon the conclusion of discussions, those Offerors still within the competitive range will be afforded an opportunity to revise their proposals and submit a Phase One, Final Proposal Revision (FPR) for evaluation. If discussions are held, the Offerors are required to submit their responses to comments electronically. If discussions are held, detailed instructions nonresponses will be provided. Electronic submissions shall meet the submission deadline set forth by the Government during discussions or indicated in the Amendment requesting the FPR. The Contracting Officer will notify all the Offerors in the competitive range, in writing, how and when interim revisions and FPR are to be submitted.
Upon conclusion of discussions, those Offerors still within the competitive range will be afforded an opportunity to revise their proposal and to submit their RFP for evaluation.
1.7 . The SSA, independently exercising prudent business judgment, will make the Source Selection Decision as to which Offerors Selection Process will be invited to submit a proposal in Phase Two. Phase One factor ratings will be used to determine the Offerors participating in Phase Two. An Offeror's Phase One factor rating for Factor 1- Past Performance will be rolled over into Phase Two. Offerors are not required to resubmit Phase One information, for Phase Two. Phase One, Factor1 and Phase Two factors rating will be used during the nonprice/price tradeoff analysis. For all Offerors participating in the Phase Two source selection process, the Government will not allow or consider any revisions to an Offeror's Phase One proposal during Phase Two.
The Solicitation contains certain mandatory or minimum requirements to be met for evaluation. The Solicitation also contains within the described factors certain documents for submission. Failure to satisfy any mandatory or minimum requirement may result in a determination that an offer is unacceptable. (A final determination that an offer is unacceptable means that an award to the Offeror involved cannot be made.)
After evaluating Phase One proposals, the SSA will select the most highly qualified Offerors' and request that only those Offerors submit Phase Two proposals. The maximum number of Offerors to submit Phase Two proposals shall not exceed five(5).
All the submission items to be evaluated pertain to the Prime Offeror, whether a single contractor entity, partnership, or a JV. The Government will consider information provided concerning primary subcontractors (those performing the likelihood that the proposed subcontractor will be available for the Solicitation project), then that submitted information will largely be diminished in the evaluation and selection process. At the same time, an Offeror that intends to have a significant on-site subcontractor participation (20% or more of the total on-site management and construction efforts) should provide information pertaining to those subcontractors IAW Section 00 21 16.
00 22 10-1
2. Phase One - Evaluation Factors for Award and Methodology
To determine the most highly qualified offerors, a source selection process will be used that involves evaluation of the Offeror's PhaseOne Proposal.
The SSEB--composed of USACE personnel, using activity representative, and as necessary, technical advisors--will conduct the evaluation. The number and identities of Offerors are not revealed to anyone that is not involved in the evaluation and award processor to other Offerors. The SSEB will evaluate proposals using the factors and evaluation criteria described in this section.
The evaluation process for Phase One consists of three parts: Proposal Compliance Review, Non-Price Factor Evaluation, and Non-Price Tradeoff Analysis.
Proposal Compliance Review. This is an initial check by Contracting Division to ensure that all required forms are complete, and…