B.08 Solicitation - 26QA036 - AFD CO2 Cylinder Hydrostatic Testing.pdf

PDF 3 MB Posted

Attached to
Albeni Falls Dam (AFD) CO2 Cylinder Hydrostatic Testing - Amendment 1
Solicitation number
W912DW26QA036
Issued by

About this file

This is a Request for Quote (RFQ) for AFD CO2 Cylinder Hydrostatic Testing and Recertification services issued by the U.S. Army Corps of Engineers, Seattle District.

The solicitation (W912DW26QA036) is designated as a 100% small business set-aside under NAICS code 811310 (Commercial and Industrial Machinery and Equipment Repair and Maintenance) with a size standard of $12.5 million. The contract will be awarded as a firm-fixed-price purchase order to the lowest priced, conforming quote where price is determined fair and reasonable. Quotes are due by 13 April 2026 at 11:00 AM PST. The scope of work requires the contractor to provide hydrostatic testing and recertification of approximately 48 to 62 CO2 cylinders (75-pound capacity) used in the fire suppression system at Albeni Falls Dam in Oldtown, Idaho. Services include cylinder pickup and delivery (Monday-Thursday, 7:00 AM to 3:30 PM), emptying and inspection of cylinders, hydrostatic testing at 150% working pressure, valve evaluation and potential rebuilding or replacement, and complete documentation with recertification records. The period of performance runs from award through 30 June 2026. Six separate contract line items (CLINs) require pricing: CLIN 001 covers transport, evaluation, and as-found reporting; CLIN 002 and 003 address valve rebuilding and replacement; CLINs 004 and 005 cover replacement of complete cylinder assemblies and cylinders only; and CLIN 006 covers documentation and recertification. All quoters must be registered in SAM.gov and maintain CMMC Level 1 compliance. The contract is subject to standard commercial item terms and various federal certifications including representations regarding small business status, tax liability, and covered telecommunications equipment prohibitions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Created On:

01 Apr 2026, 15:29 PM Central Daylight Time

Solicitation/Contract Form Continuation

AFD CO2 Cylinder Hydrostatic TestingInstrument Name:

QUOTER INSTRUCTIONS

1. The Solicitation (RFQ) Number is: as described in Block 5 of this solicitation W912DW26QA036 (page 1). The title is AFD CO2 Cylinder Hydrostatic Test.

2. Per Block 10 of this solicitation (page 1) this is a 100% small business set-aside. The NAICS code for this requirement is 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (Fire Extinguisher Repair and Maintenance, without Installation) with a size standard of $12.5M. The PSC is S202 - Housekeeping - Fire Protection.

3. See the Scope of Work (SOW) for a complete description of this requirement.

4. Closing Date and Time Due: 13 April 2026 NLT 1100 PST.

5. Award will be made as a Firm-Fixed Priced Purchase Order to the lowest priced quote whose quote conforms to the requirement of the solicitation and where price has been determined fair and reasonable. The quoter must provide pricing for ALL items in the solicitation for its quote to be acceptable to the Government. Quotes must set forth full, accurate and complete information as required by the RFQ.

Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.

The contractor should list any special features or warranty information applicable to the quoted product(s).

6. Quotes shall be emailed to della.s.overton@usace.army.mil with the subject line "RFQ ". All questions resulting from this RFQ shall be submitted by close of businessW912DW26QA036 two (2) days prior to the closing date. For questions email the aforementioned email address. For timely submitted inquiries, responses may be posted as an amendment to the solicitation via Contract Opportunities website at www.sam.gov prior to the RFQ closing date. Quoters are responsible for reviewing the Contract Opportunities website for any posted amendments to the

RFQ.

7. PROSPECTIVE OFFERORS: Contractors shall be registered in the System for Awards Management (SAM) prior to award of a contract or agreement resulting from solicitations.

"Registered in the System for Award Management (SAM) database" means that -

W912DW26QA036

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database.

(2) The offeror has completed the Core, Assertions, and Representations and Certification, and Points of contact sections of the registration in the SAM database.

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process.

(4) The Government has marked the record "Active".

This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment.

Registration is required prior to award of a contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation. LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFER INELIGIBLE FOR AWARD. The web site may be accessed at www.sam.gov.

Offerors are hereby notified of the following requirements concerning the Cybersecurity Maturity Model Certification (CMMC) program. Compliance with the specified CMMC level is a condition for contract award and for the duration of the contract.

(1) CMMC Program Overview:

The CMMC program is a Department of War initiative to protect Federal Contract Information (FCI) and Controlled Unclassified Information (CUI) that is handled by contractors. The program requires contractors to implement specific cybersecurity standards and, in some cases, undergo assessments to verify compliance. The CMMC program has three levels of certification.

(2) Applicable CMMC Level for this Solicitation:

* CMMC Level 1 (Self-Assessment): This level is required for contractors that will handle Federal Contract Information (FCI). Offerors must have a current self-assessment and an annual affirmation of compliance with the security requirements specified in RFO 252.204-7021.

(3) To be eligible for award, an offeror must have a current CMMC status at or above the level specified in this solicitation posted in the Supplier Performance Risk System (SPRS) (https://piee.

eb.mil). Contracting Officers will verify the offeror's CMMC status in SPRS prior to contract award.

(4) Contractors are required to maintain their CMMC status for the duration of the contract, including any option periods. This includes performing annual self-assessments and affirmations of continuous compliance in SPRS.

8. ELECTRONIC FUNDS TRANSFER (EFT): The Government will make all payments by EFT.

The USACE Finance Center (UFC) has altered their process for obtaining electronic funds transfer (EFT) banking information utilized for vendor contract payment and will no longer accept UFC Form 23 to update EFT banking information for vendors. Banking information for all vendors will be retrieved from SAM.gov and entered into CEFMS II. There are no exceptions to this policy change.

All contractors must notify the UFC via e-mail at: cefc-fc-eft@usace.army.mil when banking information has been updated in SAM.gov. Compliance with this requirement will help ensure timely payment to the correct back account.

9. State and Local Taxes

The U.S. Army Corps of Engineers is exempt from paying state and local taxes per Title 4 United States Code 104-107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142.

Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers or subcontractors.

It is the contractor's responsibility to investigate applicable federal, state, and local taxes, along with any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes.

The U.S. Army Corps of Engineers will not accept any invoice with a separate tax line. If there are any appropriate taxes, the contractor my considerer that tax as the cost of doing business and incorporate that cost within the cost of the item or job.

10. Submittals MUST include:

a) Signed and dated STANDARD FORM 1449 (Solicitation/ Contract/ Order for Commercial Items). See blocks 30a, b, and c.

b) Signed and dated STANDARD FORM 30, if applicable, for any Amendments to the solicitation.

See blocks 15a, b, and c.

c) Completed pricing information for all CLIN items.

d) Completed full text clauses that require fill-in information.

e) Required items in #11 below.

11. The contractor is required to provide the following information with your quote:

Federal Taxpayer's ID Number (EIN): ____________________________

Unique Entity ID (UEI):________________________________________

Cage Code Number __________________________________________

Remit to Address: ____________________________________________

Company Name: _____________________________________________

DBA: ______________________________________________________

Address: ___________________________________________________

City/State/Zip: _______________________________________________

Phone & Fax Numbers: _______________________________________

Point of Contact: ____________________________________________

E-Mail Address: ____________________________________________

Scope of Work

CO2 Cylinder Inspection Hydrostatic Testing & Recertification

Albeni Falls Dam | Seattle District U.S. Army Corps of Engineers

1. General: This contract is to provide inspection and recertification items and services for high-pressure carbon dioxide cylinders used in a fire suppression system at Albeni Falls Dam (AFD).

2. Description of Services: Contractor is to provide all parts, labor, materials, personnel, transportation (pickup from and delivery to AFD), perform hydrostatic testing, and refilling of the CO2 cylinders as described in this scope of work (SOW).

AFD and the government invoke the requirements of the Code of Federal Regulations 49 CFR 180.205, General Requirements for Requalification of Specification Cylinders, as applicable.

3. Type of Contract: Firm Fixed Price

4. Background: The cylinders of this contract supply pressurized CO2 to the fire suppression system in AFD’s electrical power generation units. The system uses 48-each, 75-pound CO2 cylinders. During normal operation, 48 cylinders are connected to the system, and a minimum of 48 spare cylinders are held in reserve. AFD has approximately 14 extra cylinders for a total of 62 cylinders that may require evaluation.

5. Period of Performance: The contractor shall begin work immediately after notice of award and finish no later than 30 June 2026.

6. Place of Performance: Cylinder pickup and delivery will take place at:

Albeni Falls Dam Powerhouse Entrance 2376 East Highway 2 Oldtown, Idaho 83822

Please note that pickup and delivery shall occur Monday through Thursday, from 7:00 AM until 3:30 PM. AFD personnel will stage the cylinders for the Contractor at or near the public entrance.

No pickups and deliveries are allowed on Fridays, Saturdays or Sundays or on federal holidays.

7. Points of Contact (POC):

7.1. Invoicing and Payment:

U.S. Army Corps of Engineers Albeni Falls Dam Attn: Christine Kimel, Contract Performance Specialist 2376 East Highway 2 Oldtown, Idaho 83822 Phone: 509-437-3133, x7232 Email: Christine.M.Kimel@usace.army.mil

7.2. Technical:

U.S. Army Corps of Engineers Albeni Falls Dam Attn: Jeff Smutny, Mechanical Engineer 2376 East Highway 2 Oldtown, Idaho 83822 Phone: 509-437-3133, x7223 Email: Jeffrey.D.Smutny@usace.army.mil

8. Scope of Work: Offeror shall quote each of the following CLINs.

8.1. CLIN 001 – Transport, Evaluation & As-found Reporting

• Take possession of CO2 cylinders at Albeni Falls Dam. Total quality may vary depending on the number of cylinders available. There will be at least 48 cylinders and at most 62 cylinders.

• Transport the cylinders to Contractor’s facility.

• Empty each cylinder, reclaiming the CO2.

• Remove valve, visually inspect cylinder inside and out for pitting, corrosion or other damage.

• Fill each cylinder with water and hydrotest each cylinder to 150% of the normal working pressure.

• Measure the expansion of each cylinder. If the allowable limit of permanent deformation is exceeded, mark the cylinder as unserviceable.

• Make the overall determination of each cylinder’s integrity and fitness for service and document accordingly.

• Evaluate each valve, determine if rebuilding is possible. If not, note that valve replacement is required.

• Compile an as-found inspection report for each cylinder. One report is adequate for the entire lot, but each cylinder shall be identified by serial number or most recent recertification stamp.

• Submit the As-Found Report for all cylinders and valves to the Albeni Falls POCs.

8.2. CLIN 002 – Rebuilding of Kidde Type “I” Valves

• Quote parts (rebuild kit) and labor for one (1) valve rebuild.

8.3. CLIN 003 – Replacement of Kidde Type “I” Valve

mailto:Christine.M.Kimel@usace.army.mil mailto:Jeffrey.D.Smutny@usace.army.mil

• Quote price for one (1) new complete valve.

8.4. CLIN 004 – Replacement of 75-Pound Cylinder Assembly

• Quote price for one (1) new complete cylinder with valve.

8.5. CLIN 005 – Replacement of 75-Pound Cylinder

• Quote price for one (1) new cylinder (cylinder only, no valve).

8.6. CLIN 006 – Documentation and Recertification of Cylinders & Valves

• Quote price for complete documentation of work performed.

• The recertification record(s) shall identify each cylinder assembly, describe the work performed on each cylinder, and state that cylinder and valve are serviceable.

• It is permissible for Contractor to submit one record for each cylinder and valve, or to submit one document that contains the individual recertification information for the full lot of cylinders and valves.

9. Quality Control:

9.1. The cylinders will be inspected by the AFD Quality Assurance Representative (QAR) prior to the contractor taking custody of the cylinders.

9.2. To the extent possible, the QAR will ensure that the cylinders are not damaged, are serviceable, and are suitable for testing, refilling, and re-certification.

9.3. At the time of return, each cylinder will be inspected for proper stamped markings, decals, and required documentation.

10. Definitions:

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer: A government employee with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The Contracting Officer is the only individual who can legally bind the government.

11. Government Furnished Items & Equipment:

11.1. The Government (Albeni Falls Dam) will provide a minimum of 48-each, 75-pound CO2 cylinders up to a maximum of 62-each, 75-pound CO2 cylinders. The Contractor should be prepared to transport 62 cylinders.

11.2. All cylinders are equipped with Kidde High-Pressure CO2 Fire Suppression Valves. See Appendix for the current technical datasheet.

11.3. All cylinders are assumed to be full, or nearly full, of carbon dioxide. All cylinders are complete with HPCO2 valves and protective cylinder ‘bottle’ caps. See Appendix for the cylinder technical datasheet.

12. Site-Specific Safety & Occupational Health Plan: For this contract, no safety or occupation health plan is required. The Contractor, or their subcontractor, will take possession of the cylinders at the public entrance to the powerhouse. No on-site contracted activities are anticipated.

13. Hazardous Waste: No hazardous waste will be produced on government property. Therefore, no hazardous waste training is required. No off-site hazardous waste is expected to be produced during the execution of this contract. However, if hazardous waste is produced, the proper handling and disposal is the sole responsibility of the Contractor.

Appendix B Quality Assurance Surveillance Plan

Performance Objective

Standard Performance Threshold

Method of Surveillance

All requested certifications received by Corps:

hardcopies delivered with recertified and refilled cylinders; digital copies delivered via email.

Zero Deviation from Standard

100% Inspection

All cylinders bear updated markings and decals indicating recertification and date of recertification.

100% Inspection

System is re-energized, confirmed to be fully functional.

100% Inspection

Contractor locks are removed, Contractor is signed off clearance, and system is released to AFD personnel.

100% Inspection

Effective: October 2024 K-81-1000 Rev AA

Kidde Fire Systems

High Pressure Carbon Dioxide Fire Suppression System Kidde Fire Systems High Pressure Carbon Dioxide (HPCO2) fire suppression system is the ideal fire suppression solution for heavy and light industrial applications where unoccupied spaces or assets need protection, where CO2 is an acceptable agent and other agents would be cost prohibitive, and where in addition to the primary total flooding design, a local application system may be required. CO2 agent is stored in seamless steel cylinders as a liquid under its own vapor pressure and at ambient temperature.

FEATURES

Environmentally safe

• CO2 is naturally occurring gas

• Global Warming Potential (GWP) of One (1)

• Ozone Depletion Potential (ODP) of Zero (0) Since CO2 is a gas, it can penetrate and spread to all parts of the protected area. As a gas or as a finely divided solid called 'snow' or 'dry ice', CO2 will not conduct electricity and therefore, can be used on energized electrical equipment. CO2 also leaves no residue, thus eliminating cleanup of the agent itself. Additionally, CO2 is low-cost, therefore can be used on deep-seated fires and oils, fats and greases where larger agent quantities are required.

CO2 Suppression system is the only clean agent system that can be used for deep seated fires.

A sampling of industries using Cardox LPCO2 include:

• Manufacturing

• Automotive Plants

• Cement Plants

• Industrial Food Fryers

• Power Generation

• Turbine Enclosures

• Coal Handling Systems

• Fume Handling Systems

• High Voltage Switchgear

• Metals

• Rolling Mills

• Metal Processing

• Other Industries

• Printing Presses

• Flammable Materials Storage

• Marine Applications

• Engine Rooms

• Electrical Rooms

• Paint Vaults

A choice of hardware profiles to suit various application types and requirements:

• Cylinder Sizes:

– Small: 25, 35, lb.

– Medium: 50, 75 lb.

– Large: 100, 123* lb.

Note *: Availability to be announced.

• Cylinder Orientation

– 25, 35. & 50 lb.: Mounted horizontally or vertically

(Bent Siphon Tube), Valve size: 1/2"

– 75, 100, & 123 lb.: Mounted vertically, Valve size 5/8"

• System Actuation:

– Primary: By Control Heads

– Secondary: By back-pressure without additional hard-ware

• Stop (Directional) Valve. Sizes Offered: 1/2" to 4"

• Lockout Valve. Sizes Offered: 1/4" to 4"

• Nozzle Types Offered: S & Flanged S, M, V & Flanged V, and L

• Safety Accessories for Occupiable Areas:

– Mechanical Discharge Delay

– Pressure Operated Siren

– Signage for various types

Wide operating temperature

• Range of -10 to 130 °F (-23 to 54 °C) allows extreme installation environments.

Specify with confidence!

• UL Listed

• FM Approved

• USCG Approved

2 K-81-1000

Suppression System Configuration HPCO2 systems may be configured for total flooding, local application, or both.

Total Flooding: In a total flooding system, a predetermined amount of CO2 is discharged through fixed piping and nozzles into an enclosed space or enclosure around the hazard. Total flooding is applicable when the hazard is totally enclosed and when all openings surrounding the hazard can be closed auto-matically prior to or at the start of system discharge. If all the openings cannot be closed, additional CO2 must be provided to compensate for agent loss through these openings during the discharge and appropriate concentration retention periods. The CO2 concentration must be maintained for a sufficient period of time to allow the fuel and any other surfaces or equipment in contact with the fuel to cool below the ignition temperature of the combustibles.

Local Application: Local application systems differ from total flooding in that the nozzles are arranged to discharge directly onto the fire. One of the principal uses of local- application sys-tems is to protect open tanks containing flammable liquids, but this technique can be generalized to protect three-dimensional hazards such as paint spray booths and printing presses.

CO2 systems can also consist of hand hose lines permanently connected by means of fixed piping to a fixed supply of suppression agent. These systems are frequently provided for manual protection of small, localized equipment. Although not a substitute for a fixed system, a hose line can be used to supplement a fixed system where the hazard is accessible for manual firefighting.

Cylinder and Valve Assemblies The agent cylinders are steel and equipped with a forged brass valve assembly which contains a safety disc device for protection against over pressurization due to elevated temperatures. Each valve is equipped with a side port that serves both as a fill connection and as a control port for attachment of a variety of Kidde Fire Systems control heads.

The threaded connection on the top of each valve mates with a discharge head to allow agent release and distribution into the system piping.

High pressure CO2 hardware has been in service for more than 50 years. The hardware is time-tested and has gained the trust of our cus-tomers and end users.

Cylinder Rack and Framing, Example Arrangement Single and double mounting straps are available for all cylinder sizes. However to provide flexibility of installation for three or more cylinders, three different styles of framing arrangements available:

Arrangement A This style (Figure 1) is used for a single row of cylinders, that can be either wall mounted or free standing.

Figure 1. Multiple Cylinder Mounting, Arrangement A Arrangement B This style (Figure 2) provides for one row of cylinders on each side of the framing. This arrangement is free standing and requires two aisles. It has the advantage of permitting free access to any cylinder without disturbing any other cylinder.

Figure 2. Multiple Cylinder Mounting, Arrangement B

WARNING

Cylinders are shipped from the factory with a protection cap installed that pre-vents impacts and damage to the valve during the transportation.

K-81-1000 3

Arrangement C:

This style (Figure 3) provides for a double row of cylinders on the same side of the framing. This arrangement can be free standing or wall mounted. It is generally used when the cylinders are to be wall mounted and sufficient space is not available to arrange them in a single row.

Figure 3. Multiple Cylinder Mounting, Arrangement C Larger quantities of cylinders can be accommodated by adding additional framing. All framing is supplied with pre-drilled mounting holes. Any combination of cylinder stowage, junction box installation, pneumatic selector valve installation and cylinder manifold support can be accommodated by the holes in the framing. All bolts and nuts are supplied as part of the framing. Drilling is not required at the job site in order to erect the bracketing. In addition the cylinder manifolds are arranged to be fastened to the framing.

Discharge Manifold HPCO2 Agent cylinders can be manifolded together as an End, Center, or H setup, with additional options for a for connected Main and Reserve systems.

Figure 4. Typical Manifold Layout

Discharge Heads Each cylinder and valve assembly must be equipped with a discharge head at installation to actuate the cylinder valve. The discharge head is assembled to the top of the cylinder valve and contains a spring-loaded piston which when actuated by CO2 pressure is designed to depress the main check in the valve and discharge the contents of the cylinder. The piston provides the necessary mechanical advantage to open the valve's main check. The discharge outlet is designed to mate with a flexible hose or swivel adapter for connection to the distribution piping.

The discharge head also contains an integral stop check whose function is to automatically prevent the loss of CO2 during system discharge in the event that a cylinder is removed from the distribution piping. Two different style discharge heads are available:

Discharge Hoses Flexible discharge hoses are used to provide the interconnection between the discharge head and the distribution manifold or piping. The hoses are made of wire-reinforced rubber.

A 1/2 in. flexible discharge hose is used with the 25, 35, and 50 lb cylinders. The 3/4 in hose is used with the 75, 100, and 123 lb cylinders.

Figure 5. Discharge Hose

Table 1: Discharge Heads

Plain-nut Grooved-nut

• Discharges upon activa-tion of its associated con-trol head or upon application of pressure entering through the out-let

• Used on each cylinder of a multiple-cylinder sys-tem

• Datasheet K-81-1060

• Can only be actuated by a control head. Pressure entering the outlet will not actuate the cylinder

• Used for single-cylinder, or connected single cylin-der main and reserve systems

• Datasheet K-81-1070

4 K-81-1000

Control Heads Actuation of the suppression system is initiated by use of control head(s). Control heads are components that attach to the control ports of the CO2 cylinder valves. The control head initiates the suppression system discharge by opening the cylinder valve's pilot check. This allows CO2 to pressurize the discharge head piston, which opens the main check in the valve and discharges the contents of the cylinder.

One control head is used for CO2 systems having one or two cylinders. A minimum of two control heads are required for suppression systems that have three or more CO2 cylinders.

Control heads are also used in conjunction with pressure operated time delays, stop valves, and pneumatic transmitters to control the flow of CO2 throughout the piping network. All of the control heads are self-venting in the set position to prevent accidental discharge in the event of a slow build-up of pressure in a pilot line or a slow leak at the pilot check of the cylinder valve.

There are multiple types of control heads available:

Note: For more information on each control head type, see the corresponding datasheet.

Check Valves Check valves serve to isolate a specific section of the suppression system from the entire system. Check valves are used in all fire suppression systems that are equipped with a main and reserve set of CO2 cylinders. The valves are installed in each discharge manifold to isolate the main and reserve cylinders from each other. Check valves are also used in systems incorporating directional valves where a common set of CO2 cylinders to protect areas or equipment of unequal sizes.

The check valves divide the cylinder group into subsets for discharge of the required amounts of CO2 into the protected areas or equipment. Check valves are available in sizes ranging from 1/4 to 3 in. diameter. The 1/4-inch and 3/8-inch check valves are also used in Nitrogen or CO2 pilot lines.

Figure 6. 1/4 in. Check Valve For more information, see K-85-0520, K-85-0522, and K-81-5100.

Table 2: Control Heads

Lever Operated Control Head

• Allows for manual operation of the cylinder.

• See datasheet K-85-6005

Lever and Pressure Operated Control Head

• Allows for either manual or pres-sure actuation of the cylinder.

• See datasheet K-85-0535

Pressure Operated Control Head

• Allows for pressure actuation of the cylinder.

• See datasheet K-85-0510

Electric Control Head

• Allows for electric actuation of the cylinder from a system con-trol panel. Also offers manual operation at the cylinder.

• See datasheet K-81-8010

Electric and Cable Control Head

• Allows for electric actuation of the cylinder from a system con-trol panel or remote operation through a cable system. Also offers manual operation at the cylinder.

• See datasheet K-81-8030

Cable Operated Control Head

• Allows remote operation of the cylinder through a cable system.

Also offers manual operation at the cylinder.

• See datasheets K-85-0509 and K-81-6021

Pneumatic Control Head

• Allows remote operation of the cylinder by means of pressure pulses transmitted from heat-actuated detectors (HADs) via copper tubing. Also offers man-ual operation at the cylinder.

• See datasheet K-81-7010

Table 2: Control Heads

K-81-1000 5

Stop (Directional) Valves Stop (Directional) valves allow cost-effective protection for facilities with several assets requiring protection. Stop valves find two primary applications in CO2 systems. The first application is in multi-hazard systems which share a common CO2 suppression system. Stop valves are used to route the CO2 from the shared supply to the individual areas or equipment being protected.

The second application for these valves is as a life safety device to prevent the accidental discharge of CO2 into a normally occupied area. The stop valve prevents the flow of CO2 until the attached control head is operated.

All Kidde Fire Systems Stop valves operate on a differential-pressure principle, using the pressure of the discharging CO2 to open the stop check and allow flow through the valve. All valves automatically reset (close) after discharge is completed.

Stop valves are available in sizes ranging from 1/2 to 4 in.

diameter.

For more information, see K-81-5130.

Lockout Valves A lockout valve is a manually operated valve installed between the CO2 manifold and the discharge pipe to the protected area.

The lockout valve can be locked in the closed position to prevent CO2 from discharging into the protected area. The lockout valve shall be installed at the end of the CO2 manifold or, if a common manifold protects multiple hazards, after each selector valve.

The lockout valve consists of a carbon steel or stainless steel valve with threaded ends. Either valve style can be provided with or without limit switches. Lockout valves are available in sizes ranging from 1/4 to 4 in. diameter.

Figure 7. Lockout Valves with Lock The lockout valve without limit switches is available in sizes 1/4” through 2”. The lockout valve with 2 SPDT limit switches and indicator is available in sizes 1/4” through 2”. The lockout valve with 2 SPDT explosion proof limit switches and indicator is available in sizes 1/4” through 2”. For more information, see K- 81-1300, K-81-1310, and K-81-1320.

Discharge Nozzles

Figure 8. HPCO2 Nozzles (Type S, Type M, Type V with Flange, and Type L)

Discharge nozzles control the distribution of CO2 into the protected area for total flooding or onto the protected equipment for local application. These discharge nozzles are designed to provide the proper combination of flow rate and discharge pattern to protect vital equipment. See Table 3 for more information on nozzle styles and applications.

Discharge nozzles are marked to identify the nozzle and show the nozzle's equivalent single orifice diameter. The equivalent diameter refers to the orifice diameter of a "standard" single orifice type nozzle having the same flow rate as the discharge nozzle.

Strainers are provided with nozzles having smaller orifice sizes to prevent foreign objects in the pipe from clogging the nozzle orifice.

A Flange Mounting kit is available for Type S Multijet and the Type V Vent nozzles.

Note: See flow calculation report for nozzle part numbers and drill codes.

Table 3. Nozzle Styles

Nozzle Type Application Nominal Spray Pattern

Multijet Type S Total Flood -or-

Local Application Rate by Volume

Cone Multijet Type S, Flange Multijet Type S, Coated

Multijet Type M

Vent Type V Total Flood Jet

Multijet Type L Local Application Rate by Area 180° Fan

6 K-81-1000

Multijet Nozzle, Type S The type S multijet nozzles have a female 1/2 in. NPT inlet connection for attaching to the distribution piping. The basic type S nozzle has a red painted cold-rolled steel body. A flanged type S nozzle and flanged mounting kit are also available for placing the nozzle on the exterior of a duct or enclosure. The flanged mounting kit includes a frangible disc which ruptures upon discharge. The flanged nozzle and mounting kit may be used to prevent particulate and liquid matter from clogging the orifices.

The flanged nozzle body is painted red.

Figure 9. Multijet Nozzle, Type S Flanged For more information, see K-81-1130 and K-81-1170.

Multijet Nozzle, Type M The type M multijet nozzle is similar in design and operation to the type S multijet nozzle, and is used for applications requiring higher flow rates than those attainable with the type S nozzle.

The nozzle body is longer than the type S body in order to accommodate the higher flow rates. The type M nozzle has a red painted, cold-rolled steel body and a 3/4 in. NPT inlet connection for attaching to the CO2 distribution piping.

Figure 10. Multijet Nozzle, Type M For more information, see K-81-1150 and K-81-1170.

Vent Nozzle, Type V The type V vent nozzle is a single-orifice nozzle used to discharge a jet of CO2 into an enclosure such as a duct. The type V nozzles are only used for total flooding applications.

Figure 11. Vent Nozzle, Type V For more information, see K-81-1110, K-81-1120, and K-81-1170.

Multijet Nozzle, Type L The type L multijet nozzle has a 1/2-inch NPT female connection for attaching to the CO2 distribution piping. The discharge produces a 180o flat fan pattern that is highly effective for protection of dip tanks, drain boards and similar two dimensional hazards. The nozzle is attached to the side of a tank and offers no obstruction to overhead trolleys or dipping operations.

The type L nozzles are only used for local application systems.

Figure 12. Multijet Nozzle, Type L

K-81-1000 7

Hand Hose Line Systems A Hand Hose Line System consists of a hose reel or rack, hose, and a discharge nozzle assembly connected by fixed piping to a supply of CO2.

Hand hose line systems may be used to supplement fixed fire protection systems or to supplement first response portable fire extinguishers for the protection of specific hazards for which CO2 is a suitable extinguishing agent. These systems shall not be used as a substitute for other fixed CO2 fire-extinguishing systems equipped with fixed nozzles, except where the hazard cannot adequately or economically be protected by a fixed system. The decision as to whether hose lines are applicable to the particular hazard shall rest with the authority having jurisdiction.

Hand hose line systems shall be placed such that they are easily accessible and that the hose length is adequate to reach the most distant hazard. In general, they should not be located where they will be exposed to the hazard, nor shall they be located inside any hazard area protected by a total flooding system.

If multiple hose stations are used, they shall be spaced so that one or more hose lines can cover any area within the hazard.

Figure 13. Typical Hand Hose Line System with Reel

PRESSURE OPERATED SIRENS

The Pressure Operated Sirens are used as audible alarms in and outside the hazard, warning those in the area to evacuate.

These units discharges CO2 when operated.

Note: When the CO2 discharge occurs outside the hazard, the discharge does not contribute to a firefighting concentration and the total system agent quantity must be compensated to account for the CO2 discharged by the siren.

Figure 14. Pressure Operated Siren

DISCHARGE DELAY DEVICES

Discharge delay devices are designed to delay the discharge of CO2 for an appropriate period of time to allow for an orderly and safe evacuation from the protected area. Discharge delays also provide a time interval for equipment to shutdown and auxiliary interlocks to engage prior to the agent discharge. Discharge delays are used to control the length of the pre-discharge warning period by holding back the actuation of a stop valve which prevents flow of CO2 into the hazard area. Discharge delays can use either the CO2 agent or a Nitrogen pilot cylinder to operate.

Figure 15. Discharge Delay For more information, see datasheets K-81-5210 and K-85-9130.

CARBON DIOXIDE CYLINDER

HORN/VALVE ASSEMBLY

ON BRACKET

CABLE PULL STATION

FOR MANUAL RELEASE

PLAIN NUT DISCHARGE HEAD

CABLE OPERATED CONTROL HEAD

ACTUATION CABLE

IN PROTECTIVE CONDUIT

SYSTEM PIPE

HOSE ON REEL

PRESSURE OPERATED SWITCH

PROVIDES NOTIFICATION OF

DISCHARGE

8 K-81-1000

ODORIZER ASSEMBLY

CO2 is odorless and colorless. Therefore for the safety of personnel who may occupy the hazard area, odorizer assemblies are required with each CO2 system regardless of size. Odorizers are used to inject wintergreen scent into the CO2 discharge as a means to warn occupants of the presence of CO2. Upon discharge, the CO2 pressure ruptures a burst disc to release the scent intermixing it with the CO2.

Figure 16. Odorizer For more information, see datasheet K-81-9162.

DISCHARGE INDICATOR

The discharge indicator,installed on the system, gives clear visual indication of a system discharge.

Figure 17. Discharge Indicator For more information, see datasheet K-85-0527.

SAFETY OUTLET

Use a safety outlet for pressure relief of manifold arrangements using directional valves

Figure 18. Safety Outlet For more information, see datasheet K-81-5170.

DISCHARGE PRESSURE SWITCH

Provides a pressure operated electrical switch. Once operated by system pressure, the switch can be used to enunciate alarms, shut down ventilation and/or other electrical equipment and turn on electrical automatic dampers or other necessary equipment.

Figure 19. Discharge Pressure Switch For more information, see datasheet K-81-5180.

PRESSURE TRIP

The pressure trip provides a pressure operated mechanical quick release to close dampers, shut spring loaded shutoff valves, and other similar applications

Figure 20. Pressure Trip For more information, see datasheet K-81-5200.

WARNING SIGNS

Warning signs shall be posted inside and outside all areas protected by a CO2 system, and in adjoining areas where the CO2 could migrate. These warning signs instruct the occupants to evacuate the area immediately when the alarms operate, as well as to warn personnel not to enter the protected space after a CO2 discharge until the area has been safely ventilated. Kidde Fire Systems offers different safety warning signs with wording specific to each application.

Figure 21. Sign in Every Protected Space

Figure 22. Sign at Every Entrance to Protected Space

Kidde-Fenwal, LLC 400 Main Street

Ashland, MA 01721 Ph: 508.881.2000

Fax: 508.881.8920 kiddefiresystems.com

Kidde Fire Systems, Kidde Fire Protection and Fenwal Controls branded products are created exclusively by Kidde-Fenwal, LLC, 400 Main St, Ashland, MA 01721, USA All trademarks are the property of their respective owners.

This literature is provided for informational purposes only. Kidde-Fenwal, LLC believes this data to be accurate, but it is published and presented without any guarantee or warranty whatsoever. Kidde-Fenwal, LLC assumes no responsibility for the product's suitability for a particular application. The fire suppression system design, installation, maintenance, service and troubleshooting must be performed by trained, authorized Kidde Fire Systems distributors for the product to work correctly. If you need more information on this product, or if you have a particular problem or question, contact: Kidde-Fenwal, LLC, Ashland, MA 01721 USA, Telephone: (508) 881-2000.

K-81-1000 Rev AA ©2024 Kidde-Fenwal, LLC

9 EXPORT INFORMATION (USA)

Jurisdiction: EAR

Classification: EAR99 This document contains technical data subject to the EAR.

KiddeFenwal

Figure 23. Sign at Every Entrance to Protected Space for Systems Provided with a Wintergreen Odorizer

Figure 24. Sign in Every Nearby Space Where CO2 Can Accumulate to Hazardous Levels

Figure 25. Sign at Each Manual Actuation Station For more information, see datasheet K-81-9171.

POST DISCHARGE CLEANUP

CO2 can be lethal at certain concentrations. For the safety of the personnel after a discharge, ensure all air-exchanging equipment is turned back on and all areas to where the agent was discharged or where the discharged agent could migrate, should be thoroughly ventilated and purged with fresh air.

http://www.kiddefiresystems.com

Effective: January 2019 K-81-1050 Rev AF

HPCO2 Component Description Type “I” Cylinder Valve, 5/8 in.

With Typical Cylinder

P/N: WK-840253-000

DESCRIPTION

Kidde Fire Systems' High-Pressure Carbon Dioxide (CO2) Fire Suppression Systems use a forged brass dis-charge valve to dispense CO2 from the 75-lbm or 100-lbm capacity cylinder assemblies. A US DOT compliant safety relief device, protecting the cylinder from over pressurization, is provided as part of the discharge valve assembly. A side port functions as a fill connection or as an attachment point for a compatible control head. Since the CO2 is stored under its own vapor pressure, a pres-sure gauge is not provided.

The discharge valve cannot dispense the cylinder con-tents without a properly attached discharge head. A dis-charge flex hose connects the discharge head to the system manifold. Alternatively, a swivel adapter may be used in place of a discharge flex hose to connect to the system manifold.

The discharge valve is provided as part of the HPCO2 cylinder assembly. A discharge head and flex hose need to be ordered for each cylinder assembly.

ORDERING INFORMATION

REFERENCED COMPONENTS

Figure 1. 5/8 in. Discharge Valve

FEATURES

• 5/8-in diameter bore

• 1-in NGT external threads

• 0°F (-18°C) to 130°F (55°C) agency temperature range

• Underwriters' Laboratories Listed - File Number EX923

• Factory Mutual Approved - Standard 5420

Description Part Number

Discharge Valve, 5/8 in. WK-840253-000

Description Reference Data

Sheet

Cylinder & Valve Assembly, 75/100-lbm K-81-1010

Discharge Head, Plain Nut K-81-1060

Discharge Head, Groove Nut K-81-1070

Discharge Hose, ¾" NPT K-81-1090

Adapter, Swivel K-81-1105

KIDDE is a registered trademark of Kidde-Fenwal, Inc., or its parents, subsidiaries or affiliates.

EXPORT INFORMATION (USA)

Jurisdiction: EAR

Classification: EAR99 This document contains technical data subject to the EAR.

Figure 2. Discharge Valve Components

MATERIALS:

VALVE BODY: BRASS

GASKET: COPPER

VALVE SEAT: BRASS

SLEEVE: BRASS

SLEEVE RETAINER: BRASS

MAIN CHECK: BRASS WITH RUBBER SEAT

PILOT CHECK: STAINLESS STEEL WITH RUBBER SEAT

DISC RETAINER: BRASS

PRESSURE RATING:

WORKING = 2300 PSIG (158 BAR)

HYDROSTATIC = 6000 PSIG (413 BAR)

TYPICAL

SIPHON TUBE

SLEEVE

WK-202805-000

1.25 IN -18 NS-3

(FOR CONTROL

HEAD CONNECTION)

PILOT CHECK

WK-923066-000

SLEEVE

RETAINER

WK-202804-000

VALVE BODY

WK-270403-000

VALVE SEAT - WK-202490-000

MAIN CHECK - WK-800760-000

2.5 IN. - 14 NS-3

(FOR DISCHARGE HEAD CONNECTION)

SPRING - WK-326410-000

DISC RETAINER - WK-295500-000

SAFETY DISC - 81-903684-000 (RED)

& WASHER

1 IN. NGT

TYPICAL

CYLINDER

SIPHON TUBE

STAKED IN PLACE

GASKET

WK-326420-000

Kidde Fire Systems 400 Main Street

Ashland, MA 01721 Ph: 508.881.2000

Fax: 508.881.8920 www.kiddefiresystems.com

This literature is provided for informational purposes only. KIDDE-FENWAL, INC. believes this data to be accurate, but it is published and presented without any guarantee or warranty whatsoever. KIDDE-FENWAL, INC. assumes no responsibility for the product's suitability for a particular application. Product features specified are only applicable when the fire suppression system is correctly designed, installed, maintained and serviced by trained, authorized Kidde Fire Systems distributors as per the applicable design, installation, operation, and maintenance manuals. If you need more information on this product, or if you have a particular problem or question, contact:

KIDDE-FENWAL, INC., Ashland, MA 01721 USA, Telephone: (508) 881-2000.

K-81-1050 Rev AF

©2019 Kidde-Fenwal, Inc.

A UTC Fire & Security Company

This literature is provided for informational purposes only. KIDDE-FENWAL, INC. assumes no responsibility for the product’s suitability for a particular application. The product must be properly applied to work correctly.

If you need more information on this product, or if you have a particular problem or question, contact KIDDE-FENWAL, INC., Ashland, MA 01721. Telephone: (508) 881-2000.

Kidde Fire Systems A UTC Fire & Security Company 400 Main Street Ashland, MA 01721 Ph: 508.881.2000 Fax: 508.881.8920 www.kiddefiresystems.com

K-81-1050 Rev AC © 2011 Kidde-Fenwal Inc. Printed in USA

Effective: March 2011 K-81-1050

CO2 Component Description Type “I” Cylinder Valve, 5/8-in. With Typical Cylinder

P/N: 840253

MATERIALS:

VALVE BODY: BRASS

VALVE SEAT: BRASS

SLEEVE: BRASS

SLEEVE RETAINER: BRASS

MAIN CHECK: BRASS WITH RUBBER SEAT

PILOT CHECK: STAINLESS STEEL WITH RUBBER SEAT

PRESSURE RATING:

WORKING = 2300 PSIG (158 BAR)

HYDROSTATIC = 6000 PSIG (413 BAR)

5.44 IN.

TYPICAL

SIPHON TUBE

SLEEVE

202805

1.25 IN -18 NS-3

(FOR CONTROL

HEAD CONNECTION)

PILOT CHECK

923066

SLEEVE

RETAINER

202804

VALVE BODY - 270403

VALVE SEAT - 202490

MAIN CHECK - 800760

2.5 IN. - 14 NS-3

(FOR DISCHARGE HEAD CONNECTION)

SPRING - 32641

DISC RETAINER - 29550

SAFETY DISC - 903684 (RED)

& WASHER

1 IN. NGT

TYPICAL

CYLINDER

SIPHON TUBE

STAKED IN PLACE

GASKET - 32642

(138mm)

Effective: June 2020 K-81-1010 Rev AE

HPCO2 Component Description

75 and 100 lbm Capacity Carbon Dioxide Cylinder and Valve Assemblies

DESCRIPTION

The Kidde Fire Systems High-Pressure Carbon Dioxide (CO2) Fire Suppression System uses seamless steel cyl-inders to store carbon dioxide agent. The agent is stored under its own vapor pressure as a non-flammable com-pressed gas. Due to the physical properties of CO2, both the vapor and liquid state are present within the cylinder.

Each assembly is factory fitted with a discharge valve and siphon tube. A US DOT compliant safety relief device, protecting the cylinder from over pressurization, is provided as part of the discharge valve assembly. For shipment, a standard shipping cap is included, which mates to external threads on the cylinder neck to protect the discharge valve from inadvertent damage.

Prior to removing the shipping cap, each cylinder shall be properly secured using cylinder straps or Framing/Oak Rack Kits as required.

The discharge valve cannot dispense the cylinder con-tents without a properly attached discharge head. This feature provides an enhanced safeguard during trans-port. A discharge flex hose connects the discharge head to the system manifold. Alternatively, a swivel adapter may be used in place of a discharge flex hose to connect to the system manifold. One or more control heads will be required to actuate a manifold of cylinders.

After discharge, charging accessories are required to safely vent any residual pressure to service the dis-charge valve and then re-fill the cylinder.

SPECIFICATIONS

Service Pressure, Max: 2300-psi (158-bar) Temperature, Min: 0°F (-17°C) Temperature, Max: 130°F (55°C)

DIMENSIONS

Figure 1. Cylinder

FEATURES

• US DOT 3AA-2300 Specification

• TC 3AM-176 Specification

• Type I Valve, 5/8"

• Straight Siphon Tube

• Underwriters' Laboratories Listed - File Number EX923

• United States Coast Guard Approved

• FM Approved, Standard 5420

Cylinder Capacity (lbm) A Height (in.) B Dia. (in.)

100 62.0” 10.50

75 60.0 9.25

A

B

283310

CAP SUPPLIED

WITH CYLINDER

EMPTY WT.

LBS.

FULL WT.

LBS.

All trademarks are the property of their respective owners.

EXPORT INFORMATION (USA)

Jurisdiction: EAR

Classification: EAR99 This document contains technical data subject to the EAR.

ORDERING INFORMATION

REFERENCED COMPONENTS

Description Application Approvals Part Number

Cylinder & Valve Assembly, 100-lbm Industrial and

Marine

UL/ULC

FM Approvals

USCG

Various Class Societies

81-870269-000

Cylinder & Valve Assembly, 75-lbm 81-870287-000

Description Reference Data Sheet

Discharge Head, Plain Nut K-81-1060

Discharge Head, Grooved Nut K-81-1070

Hose, ¾” Outlet Discharge K-81-1090

Adapter, Swivel K-81-1105

Strap, Single Cylinder K-81-1230

Strap, Dual Cylinder K-81-1240

Framing Kit, Steel See manual 81-CO2MAN-001

Rack Kit, Oak See manual 220610

Control Head, Electric K-81-8010*

Control Head, Cable Operated K-81-6020*

Valve, 5/8” Type I (spare only) K-81-1050

Fixture, Blow-Off K-81-9110

Adapter, Charging

* Typical listed, see referenced manuals for all applicable control heads.

Kidde Fire Systems 400 Main Street

Ashland, MA 01721 Ph: 508.881.2000

Fax: 508.881.8920 kiddefiresystems.com

This literature is provided for informational purposes only. KIDDE-FENWAL, INC. believes this data to be accurate, but it is published and presented without any guarantee or warranty whatsoever. KIDDE-FENWAL, INC. assumes no responsibility for the product's suitability for a particular application. The fire suppression system design, installation, maintenance, service and troubleshooting must be performed by trained, authorized Kidde Fire Systems distributors for the product to work correctly.

If you need more information on this product, or if you have a particular problem or question, contact:

KIDDE-FENWAL, INC., Ashland, MA 01721 USA, Telephone: (508) 881-2000.

K-81-1010 Rev AE

©2020 Carrier

Continuation of Supplies or Services and Prices/Costs

Additiona…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .