This is a Scope of Work (SOW) for CO2 cylinder inspection, hydrostatic testing, and recertification services for the U.S. Army Corps of Engineers at Albeni Falls Dam in Oldtown, Idaho.

The contract is firm fixed price and requires the contractor to inspect, test, and recertify between 48 and 62 high-pressure 75-pound CO2 cylinders used in the facility's fire suppression system. Work must commence immediately upon notice of award and be completed by June 30, 2026. The contractor must pick up and deliver cylinders at the Albeni Falls Dam Powerhouse Entrance (2376 East Highway 2, Oldtown, Idaho 83822) Monday through Thursday between 7:00 AM and 3:30 PM only; no weekend or federal holiday pickups are permitted. Services include cylinder emptying and CO2 reclamation, valve removal and inspection, visual inspection for damage, hydrostatic testing to 150% of normal working pressure, expansion measurement, serviceability determination, valve evaluation for rebuilding or replacement, and compilation of detailed as-found reports identifying each cylinder by serial number.

Six Contract Line Items (CLINs) require quotes: CLIN 001 covers transport, evaluation, and as-found reporting for all cylinders; CLIN 002 addresses rebuilding of Kidde Type "I" valves (parts and labor for one valve); CLIN 003 covers replacement of one new Kidde Type "I" valve; CLIN 004 quotes one new complete cylinder with valve assembly; CLIN 005 quotes one cylinder only; and CLIN 006 covers complete documentation and recertification records. All cylinders are government-furnished and equipped with Kidde High-Pressure CO2 Fire Suppression Valves. Points of contact include Christine Kimel (Contract Performance Specialist) for invoicing and payment, and Jeff Smutny (Mechanical Engineer) for technical matters. The Quality Assurance Surveillance Plan requires 100% inspection with zero deviation for all certifications, markings, decals, system re-energization, and final contractor clearance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

CO2 Cylinder Inspection Hydrostatic Testing & Recertification

Albeni Falls Dam | Seattle District

U.S. Army Corps of Engineers

1. General: This contract is to provide inspection and recertification items and services for high-pressure carbon dioxide cylinders used in a fire suppression system at Albeni Falls Dam (AFD).

2. Description of Services: Contractor is to provide all parts, labor, materials, personnel, transportation (pickup from and delivery to AFD), perform hydrostatic testing, and refilling of the CO2 cylinders as described in this scope of work (SOW).

AFD and the government invoke the requirements of the Code of Federal Regulations 49 CFR 180.205, General Requirements for Requalification of Specification Cylinders, as applicable.

3. Type of Contract: Firm Fixed Price

4. Background: The cylinders of this contract supply pressurized CO2 to the fire suppression system in AFD’s electrical power generation units. The system uses 48-each, 75-pound CO2 cylinders. During normal operation, 48 cylinders are connected to the system, and a minimum of 48 spare cylinders are held in reserve. AFD has approximately 14 extra cylinders for a total of 62 cylinders that may require evaluation.

5. Period of Performance: The contractor shall begin work immediately after notice of award and finish no later than 30 June 2026.

6. Place of Performance: Cylinder pickup and delivery will take place at:

Albeni Falls Dam Powerhouse Entrance 2376 East Highway 2

Oldtown, Idaho 83822

Please note that pickup and delivery shall occur Monday through Thursday, from 7:00 AM until 3:30 PM. AFD personnel will stage the cylinders for the Contractor at or near the public entrance.

No pickups and deliveries are allowed on Fridays, Saturdays or Sundays or on federal holidays.

7. Points of Contact (POC):

7.1. Invoicing and Payment:

Albeni Falls Dam Attn: Christine Kimel, Contract Performance Specialist 2376 East Highway 2 Oldtown, Idaho 83822 Phone: 509-437-3133, x7232 Email: Christine.M.Kimel@usace.army.mil

7.2. Technical:

Albeni Falls Dam Attn: Jeff Smutny, Mechanical Engineer 2376 East Highway 2 Oldtown, Idaho 83822 Phone: 509-437-3133, x7223 Email: Jeffrey.D.Smutny@usace.army.mil

8. Scope of Work: Offeror shall quote each of the following CLINs.

8.1. CLIN 001 – Transport, Evaluation & As-found Reporting

• Take possession of CO2 cylinders at Albeni Falls Dam. Total quality may vary depending on the number of cylinders available. There will be at least 48 cylinders and at most 62 cylinders.

• Transport the cylinders to Contractor’s facility.

• Empty each cylinder, reclaiming the CO2.

• Remove valve, visually inspect cylinder inside and out for pitting, corrosion or other damage.

• Fill each cylinder with water and hydrotest each cylinder to 150% of the normal working pressure.

• Measure the expansion of each cylinder. If the allowable limit of permanent deformation is exceeded, mark the cylinder as unserviceable.

• Make the overall determination of each cylinder’s integrity and fitness for service and document accordingly.

• Evaluate each valve, determine if rebuilding is possible. If not, note that valve replacement is required.

• Compile an as-found inspection report for each cylinder. One report is adequate for the entire lot, but each cylinder shall be identified by serial number or most recent recertification stamp.

• Submit the As-Found Report for all cylinders and valves to the Albeni Falls POCs.

8.2. CLIN 002 – Rebuilding of Kidde Type “I” Valves

• Quote parts (rebuild kit) and labor for one (1) valve rebuild.

8.3. CLIN 003 – Replacement of Kidde Type “I” Valve

mailto:Christine.M.Kimel@usace.army.mil mailto:Jeffrey.D.Smutny@usace.army.mil

• Quote price for one (1) new complete valve.

8.4. CLIN 004 – Replacement of 75-Pound Cylinder Assembly

• Quote price for one (1) new complete cylinder with valve.

8.5. CLIN 005 – Replacement of 75-Pound Cylinder

• Quote price for one (1) new cylinder (cylinder only, no valve).

8.6. CLIN 006 – Documentation and Recertification of Cylinders & Valves

• Quote price for complete documentation of work performed.

• The recertification record(s) shall identify each cylinder assembly, describe the work performed on each cylinder, and state that cylinder and valve are serviceable.

• It is permissible for Contractor to submit one record for each cylinder and valve, or to submit one document that contains the individual recertification information for the full lot of cylinders and valves.

9. Quality Control:

9.1. The cylinders will be inspected by the AFD Quality Assurance Representative (QAR) prior to the contractor taking custody of the cylinders.

9.2. To the extent possible, the QAR will ensure that the cylinders are not damaged, are serviceable, and are suitable for testing, refilling, and re-certification.

9.3. At the time of return, each cylinder will be inspected for proper stamped markings, decals, and required documentation.

10. Definitions:

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer: A government employee with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The Contracting Officer is the only individual who can legally bind the government.

11. Government Furnished Items & Equipment:

11.1. The Government (Albeni Falls Dam) will provide a minimum of 48-each, 75-pound CO2 cylinders up to a maximum of 62-each, 75-pound CO2 cylinders. The Contractor should be prepared to transport 62 cylinders.

11.2. All cylinders are equipped with Kidde High-Pressure CO2 Fire Suppression Valves. See Appendix for the current technical datasheet.

11.3. All cylinders are assumed to be full, or nearly full, of carbon dioxide. All cylinders are complete with HPCO2 valves and protective cylinder ‘bottle’ caps. See Appendix for the cylinder technical datasheet.

12. Site-Specific Safety & Occupational Health Plan: For this contract, no safety or occupation health plan is required. The Contractor, or their subcontractor, will take possession of the cylinders at the public entrance to the powerhouse. No on-site contracted activities are anticipated.

13. Hazardous Waste: No hazardous waste will be produced on government property. Therefore, no hazardous waste training is required. No off-site hazardous waste is expected to be produced during the execution of this contract. However, if hazardous waste is produced, the proper handling and disposal is the sole responsibility of the Contractor.

Appendix B Quality Assurance Surveillance Plan

Performance Objective

Standard Performance Threshold

Method of Surveillance

All requested certifications received by Corps:

hardcopies delivered with recertified and refilled cylinders; digital copies delivered via email.

Zero Deviation from Standard

100% Inspection

All cylinders bear updated markings and decals indicating recertification and date of recertification.

100% Inspection

System is re-energized, confirmed to be fully functional.

100% Inspection

Contractor locks are removed, Contractor is signed off clearance, and system is released to AFD personnel.

100% Inspection