This file contains a cost breakdown and federal contract opportunity notice for the construction of an air traffic control tower in Jordan. The cost breakdown provides pricing for mobilization, site survey, tower construction including substructure, superstructure, closures, cab, interiors, services, backup generator and special inspections. It also includes pricing for supporting facilities such as demolition, site electrical and utility systems, access road, parking lot and improvements. The federal contract opportunity notice seeks bids for the design and construction of a new 12-story air traffic control tower with reinforced concrete pile foundation, steel superstructure, precast concrete facade and standing seam metal roof. The project scope includes an elevator, catwalk, fire and HVAC systems, emergency power, utilities and site work. The solicitation number is W912ER22R0006 and the contract value is between $10-25 million. The response deadline is not provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P2# 474512
PROPOSER:
RFP: W912ER22R0006
PROJECT: Air Traffic Control Tower, UD 2.4 LOCATION: Jordan DATE:
JOOH HOOH BOND
Mobilization and Demobilization in accordance with the contract documents
0002 Site Survey in accordance with the contract documents
Construct Air Traffic Control Tower in accordance with the contract documents
0003AA Construct Substructure
0003AB Construct Super Substructure
0003AC Construct Exterior Closures
0003AD Construct Air Traffic Control Cab
0003AE Construct Building Interiors
0003AF Construct Building Services
0003AG Provide & Install Backup Generator
0003AH Provide Special Inspections
0 0 0 0 0 0 0 0 0 0 0 0
Construct Air Traffic Control Tower Supporting Facilities in accordance with the contract documents
0004AA Demolition
0004AB Construct Site Electrical Distribution System
0004AC Construct Water Distribution Piping System
0004AD Construct Site Fire Water Piping System
0004AE Construct Site Sanitary Sewer Collection Piping System
0004AF Construct Site Communication Distribution System
0004AG Construct Site Storm Water Collection System
0004AH Construct Access Road
0004AJ Construct Aggregate Parking Lot
0004AK Construct Site Improvements
0 0 0 0 0 0 0 0 0 0 0 0
Option #1 Construct Asphalt Paving for Parking Lot in accordance with the contract documents
Option #2 Construct Security Fencing in accordance with the contract documents
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0006)
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
TOTAL OPTION PRICE (ITEM 0005 - 0006)
TOTAL (ITEMS 0004AA - 0004AK)
TOTAL (ITEMS 0003AA - 0003AG)
OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
EXHIBIT 1 Page 1 of 1