B.08.02 FY21-26 Dive SATOC Pricing Schedule.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- NWD - Dive Services Base + Four Option Years Federal contract opportunity
- Solicitation number
- W912EF21Q0049
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidder Inquiry W912EF21Q0049.pdf | ||
| B.08.02 Solicitation Past Performance.pdf | ||
| B.08.02 Solicitation Key Personnel.pdf | ||
| B.08.02 Sample Task Order for Quote.pdf | ||
| B.08.02 Contractor Check List.xlsx | XLSX spreadsheet | |
| B.08.02 Solicitation (W912EF21Q0049).pdf | ||
| B.08.02 Sample Task Order for Quote.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| NWD - FY21-26 UNDERWATER DIVE SERVICES |
| IDIQ UNIT PRICE SCHEDULE |
| Note: It is estimated that all jobs performed under this contract will require a minimum 5-person crew as described in item 0001. |
| Most jobs will require dive depths of less than 100 feet and will be 1 to 2 days in duration. |
| The intent of this contract is to provide diver-directed emergency/time critical underwater services as required for the Walla Walla and Portland District for the period of base year of this contract. There are four option years. |
| PRICE SCHEDULE FOR WALLA WALLA, WASHINGTON | |||||||
| Base Year | OY1 | OY2 | OY3 | OY4 | |||
| Line Item | Description | Unit of Measure | Unit Price | Unit Price | Unit Price | Unit Price | Unit Price |
| 0001 | Basic Dive Day (8 hrs): Using surface supplied air (SSA), employing a 5 person dive team comprised of: (1) non-diving dive supervisor, (2) divers, (1) standby diver, (1) tender, . Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. (Standard length of individual dive shift per calendar day is (4) four hours, maximum of three four-hour dive shifts per 12-hour work day allowed.) | ||||||
| 0001AA | Standard dive up to 50 feet deep | Per Day | |||||
| 0001AB | 51 – 100 feet deep | Per Foot | |||||
| 0001AC | 101 – 150 feet deep | Per Foot | |||||
| 0001AD | 151 - 200 feet deep | Per Foot | |||||
| 0002 | Additional Qualified Diver added to the 5 person dive team for a basic 8 hour work day. | ||||||
| 0002AA | Standard dive up to 50 feet deep | Per Day | |||||
| 0002AB | 51 – 100 feet deep | Per Foot | |||||
| 0002AC | 101 – 150 feet deep | Per Foot | |||||
| 0002AD | 151 - 200 feet deep | Per Foot | |||||
| 0003 | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the dive site. Note: Time required to do this does not constitute part of the dive day. | ||||||
| 0003AA | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Dworshak dive site. | *1 per each task order | |||||
| 0003AB | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lower Granite dive site. | *1 per each task order | |||||
| 0003AC | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Little Goose dive site. | *1 per each task order | |||||
| 0003AD | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lower Monumental dive site. | *1 per each task order | |||||
| 0003AE | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Ice Harbor dive site. | *1 per each task order | |||||
| 0003AF | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the McNary dive site. | *1 per each task order | |||||
| 0003AG | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lucky Peak dive site. | *1 per each task order | |||||
| 0004 | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dams | ||||||
| 0004AA | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Dworshak dive site. | *1 per each task order | |||||
| 0004AB | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lower Granite dive site. | *1 per each task order | |||||
| 0004AC | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Little Goose dive site. | *1 per each task order | |||||
| 0004AD | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lower Monumental dive site. | *1 per each task order | |||||
| 0004AE | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Ice Harbor dive site. | *1 per each task order | |||||
| 0004AF | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, McNary dive site. | *1 per each task order | |||||
| 0004AG | Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lucky Peak dive site. | *1 per each task order | |||||
| 0005 | Dive Boat capable of accommodating dive crew, 2 Corps of Engineers personnel and all necessary equipment. Boat must have sufficient freeboard and horsepower to navigate the Snake River. | Per Day | |||||
| 0006 | Welding supplies and consumables | Per Hour | |||||
| 0007 | Overtime pay rate-Dive supervisor. | Per Hour | |||||
| 0008 | Overtime pay rate-Diver | Per Hour | |||||
| 0009 | Overtime pay rate-Tender | Per Hour | |||||
| 0010 | Overtime pay rate for standby diver | Per Hour | |||||
| 0011 | Overtime pay rate for ROV Pilot/Operator | Per Hour | |||||
| 0012 | Overtime pay rate for Pilebuck | Per Hour | |||||
| 0013 | Remote Operated Vehicle Crew: includes ROV pilot and operator, 8 hours per day, truck, fuel and per diems. | Per Day | |||||
| 0014 | Remote Operated Vehicle: A Class II or III, HD ROV Package Refer to section 3 CONTRACTOR PROVIDED SPECIAL UNDERWATER EQUIPMENT | Per Day | |||||
| 0015 | Additional Equipment Required based on an individual task order requirement: The Mark up percentage to be added | % | |||||
| 0016 | Mobilization and Demobilization of Modular Floats & Skiff to dive site. | ||||||
| 0016AA | Mobilization and Demobilization of Modular Floats & Skiff to Dowrshak dive site. | *1 per each task order | |||||
| 0016AB | Mobilization and Demobilization of Modular Floats & Skiff to Lower Granite dive site. | *1 per each task order | |||||
| 0016AC | Mobilization and Demobilization of Modular Floats & Skiff to Little Goose dive site. | *1 per each task order | |||||
| 0016AD | Mobilization and Demobilization of Modular Floats & Skiff to Lower Monumental dive site. | *1 per each task order | |||||
| 0016AE | Mobilization and Demobilization of Modular Floats & Skiff to Ice Harbor dive site. | *1 per each task order | |||||
| 0016AF | Mobilization and Demobilization of Modular Floats & Skiff to McNary dive site. | *1 per each task order | |||||
| 0016AG | Mobilization and Demobilization of Modular Floats & Skiff to Lucky Peak dive site. | *1 per each task order | |||||
| 0017 | Pilebuck Crew: includes 8-hour Pilebuck (4-man) crew to set up and assemble the floats and to place equipment onto floats. | Per Day | |||||
| 0018 | Modular Floats 13’ x 30’ : includes floats to accommodate dive spread and skiff with outboard | Per Day | |||||
| 0019 | Modular Floats 32’ x 30’ : includes floats to accommodate dive spread and recompression chamber and skiff with outboard. | Per Day | |||||
| 0020 | Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a six-person dive team comprised of (1) non-diving dive supervisor, (3) diver, (1) standby diver, (1) tender, . Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. | ||||||
| 0020AA | Standard dive up to 50 feet deep | Per Day | |||||
| 0020AB | 51 – 100 feet deep | Per Foot | |||||
| 0020AC | 101 – 125 feet deep | Per Foot | |||||
| 0020AD | 126 - 200 feet deep | Per Foot | |||||
| 0021 | Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a eight- person dive team comprised of (1) non-diving dive supervisor, (4) diver, (1) standby diver, (2) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. | ||||||
| 0021AA | Standard dive up to 50 feet deep | Per Day | |||||
| 0021AB | 51 – 100 feet deep | Per Foot | |||||
| 0021AC | 101 – 125 feet deep | Per Foot | |||||
| 0021AD | 126 - 200 feet deep | Per Foot | |||||
| 0022 | Penetration Dives (dives into confined spaces) 26 feet and beyond | Per Foot |
Total Walla Walla District - 0 - 0 - 0 - 0 - 0
| PRICE SCHEDULE FOR PORTLAND, OREGON | ||
| 0025 | Basic Dive Day (8 hrs): Using surface supplied air (SSA), employing a 5 person dive team comprised of: (1) non-diving dive supervisor, (2) diver, (1) standby diver, (1) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. (Standard length of individual dive shift per calendar day is (4) four hours, maximum of three four-hour dive shifts per 12-hour work day allowed.) | |
| 0025AA | Standard dive up to 50 feet deep | Per Day |
| 0025AB | 51 – 100 feet deep | Per Foot |
| 0025AC | 101 – 150 feet deep | Per Foot |
| 0025AD | 151 - 200 feet deep | Per Foot |
| 0026 | Additional qualified diver, added to 5 person dive team for basic 8-hour work day. | |
| 0026AA | Standard dive up to 50 feet deep | Per Day |
| 0026AB | 51 – 100 feet deep | Per Foot |
| 0026AC | 101 – 150 feet deep | Per Foot |
| 0026AD | 151 - 200 feet deep | Per Foot |
| 0027 | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the dive site. | |
| 0027AA | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Bonniville dive site. | *1 per each task order |
| 0027AB | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to The Dalles dive site. | *1 per each task order |
| 0027AC | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to John Day dive site. | *1 per each task order |
| 0027AD | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Astoria OR, Columbia River dive site | *1 per each task order |
| 0027AE | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Jess Dam, Rogue River, dive site. | *1 per each task order |
| 0027AF | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to John Day dive site. | *1 per each task order |
| 0027AG | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Big Cliff Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AC | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Cougar Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AH | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Detroit Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AI | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Dexter Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AJ | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Foster Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AK | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Green Peter Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AL | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Hills Creek Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AM | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Cougar Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0027AN | Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Lookout Point Dam, Willamette River Basin, dive site. | *1 per each task order |
| Note: Time required to do this does not constitute part of the dive day. All Portland District public access facilities including John Day, The Dalles, Bonneville, Willamette and Rogue River Projects as well as work sites, facilities and vessels under the direction of Channel and Harbors Branches. | ||
| 0028 | Mobilization and demobilization of workboat (dive boat) to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches | |
| 0028AA | Mobilization and demobilization of workboat (dive boat) to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches Portland Oregon, Columbia River | *1 per each task order |
| 0028AB | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, Bonneville dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, The Dales dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, John Day dive site. | *1 per each task order |
| 0028AD | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Astoria, OR Columbia River dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Jess Dam, Rogue River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Big Cliff Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Cougar Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Detroit Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dexter Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Foster Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Green Peter Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Hills Creek Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0028AC | Mobilization and demobilization of workboat (dive boat) to USACE Portland District Lookout Point Dam, Willamette River Basin, dive site. | *1 per each task order |
| 0029 | Dive Boat capable of accommodating dive crew, 2 Corps of Engineers personnel and all necessary equipment. Boat must have sufficient freeboard and horsepower to navigate the Columbia River | Per Day |
| 0030 | Welding supplies and consumables | Per Hour |
| 0031 | Overtime pay rate-Dive supervisor. | Per Hour |
| 0032 | Overtime pay rate-Diver | Per Hour |
| 0033 | Overtime pay rate-Tender | Per Hour |
| 0034 | Overtime pay rate for standby diver | Per Hour |
| 0035 | Overtime pay rate for ROV Pilot/Operator | Per Hour |
| 0036 | Overtime pay rate for Pilebuck | Per Hour |
| 0037 | Remote Operated Vehicle Crew: includes ROV pilot and operator, 8 hours per day, truck, fuel and per diems. | Per Day |
| 0038 | Remote Operated Vehicle: includes ROV (Deep Ocean Engineering Phantom XTL or equal) with maximum 500’ umbilical, generator, monitor and recorder. | Per Day |
| 0039 | Additional Equipment Required based on an individual task order requirement: The Mark up percentage to be added | % |
| 0040 | Mobilization and Demobilization of Modular Floats & Skiff | *Each |
| 0040AA | Mobilization and demobilization to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches Portland Oregon, Columbia River | *1 per each task order |
| 0040AB | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, Bonneville dive site. | *1 per each task order |
| 0040AC | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, John Day dive site. | *1 per each task order |
| 0040AD | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, The Dales dive site. | *1 per each task order |
| 0040AE | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Columbia River, Astoria, OR | *1 per each task order |
| 0040AF | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Jess Dam, Rogue River Basin | *1 per each task order |
| 0040AG | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Big Cliff Dam, Willamette River Basin | *1 per each task order |
| 0040AH | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Cougar Dam, Willamette River Basin | *1 per each task order |
| 0040AI | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Detriot Dam, Willamette River Basin | *1 per each task order |
| 0040AJ | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Dexter Dam, Willamette River Basin | *1 per each task order |
| 0040AK | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Foster Dam, Willamette River Basin | *1 per each task order |
| 0040AL | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Green Peter Dam, Willamette River Basin | *1 per each task order |
| 0040AM | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Hills Creek Dam, Willamette River Basin | *1 per each task order |
| 0040AN | Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Lookout Point Dam, Willamette River Basin | *1 per each task order |
| 0041 | Pilebuck Crew: includes 8-hour Pilebuck (4-man) crew to set up and assemble the floats and to place equipment onto floats. | Per Day |
| 0042 | Modular Floats 13’ x 30’ : includes floats to accommodate dive spread and skiff with outboard | Per Day |
| 0043 | Modular Floats 32’ x 30’ : includes floats to accommodate dive spread and recompression chamber and skiff with outboard. | Per Day |
| 0045 | Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a six-person dive team comprised of (1) non-diving dive supervisor, (3) diver, (1) standby diver, (1) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. | |
| 0045AA | Standard dive up to 50 feet deep | Per Day |
| 0045AB | 51 – 100 feet deep | Per Foot |
| 0045AC | 101 – 125 feet deep | Per Foot |
| 0044AD | 126 - 200 feet deep | Per Foot |
| 0045 | Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a 8 person dive team comprised of (1) non-diving dive supervisor, (4) diver, (1) standby diver, (2) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. | |
| 0045AA | Standard dive up to 50 feet deep | Per Day |
| 0045AB | 51 – 100 feet deep | Per Foot |
| 0045AC | 101 – 125 feet deep | Per Foot |
| 0045AD | 126 - 200 feet deep | Per Foot |
| 0046 | Penetration Dives (dives into confined spaces) 26 feet and beyond | Per Foot |
| Total Unit Portland District | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| Total /Year | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| *Each task order will have only one mob/demobilization charge whether it runs one or several days. | |||||||
| As prescribed at FAR 31.205-46, travel costs incurred for travel in the Continental United States, Alaska, Hawaii, The Commonwealth of Puerto Rico, and territories and possessions of the United States, shall not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the Joint Travel Regulations, Volume 2, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense. Lodging and per diem apply to jobs that run more than one day. Each task order will allow for these costs based on number of days over the first day and be part of the task order pricing proposal. | |||||||
| Air Travel (Economy/Coach) | Joint Travel Regulation | ||||||
| https://www.gsa.gov/travel/plan-book/transportation-airfare-rates-pov-rates-etc | |||||||
| Auto Mileage | Joint Travel Regulation | ||||||
| https://www.gsa.gov/travel/plan-book/transportation-airfare-rates-pov-rates-etc | |||||||
| Per Diem | Joint Travel Regulation | ||||||
| https://www.gsa.gov/travel/plan-book/per-diem-rates | |||||||
| Regulations applied to this IDIQ are subject to change. |