B.08.02 Attachment DRAFT QASP Olmsted AFB Sunset Annex FUDS.pdf
PDF 971 KB Posted
- Attached to
- Sunset Annex Fence Repair, Middletown PA
- Solicitation number
- W912DR24Q0010
About this file
This Quality Assurance Surveillance Plan outlines the evaluation criteria and process for a fence repair contract at the Sunset Annex formerly used defense site in Middletown, Pennsylvania. The U.S. Army Corps of Engineers Baltimore District requires repair of the perimeter fence, which is a small business set-aside under NAICS code 238990 with an estimated value between $25,000 and $100,000. The plan defines the roles of the Contracting Officer and Contracting Officer's Representative in monitoring performance. Key deliverables include a work plan, site safety and health plan, and completed fence repair. Performance will be evaluated based on quality, schedule, management and regulatory compliance, with the contractor either recommended or not recommended for future work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Quality Assurance Surveillance Plan
Olmsted Air Force Base (Sunset Annex)
LONDONDERRY TOWNSHIP (Middletown), DAUPHIN COUNTY, PENNSYLVANIA
Contract# pending
FUDS Property Number: C03PA1016
Prepared By
U.S. Army Corps of Engineers, Baltimore District
Contracting Division
City Crescent Building, Room 7000
10 South Howard Street
Baltimore, Maryland 21201
January 2024
LIST OF TABLES
Table 1 – Subject Matter Experts
Table 2 – Evaluation Areas & Ratings Criteria
Table 3 – Key Deliverables by Evaluation Areas
Table 4 – Specific Evaluation Criteria for Established Key Deliverables
LIST OF ATTACHMENTS
Attachment A: Quality Assurance Monitoring Form
Attachment B: Quality Assurance Report
Attachment C: Corrective Action Form
Attachment D-5: On-Site Safety/Operations Quality Assurance Form
LIST OF ACRONYMS & ABBREVIATIONS
COR Contracting Officer’s Representative
KO Contracting Officer
PM Project Manager
PMP Project Management Plan
POC Point of Contact
QAMF Quality Assurance Monitoring Form
QAR Quality Assurance Report
QASP Quality Assurance Surveillance Plan
SME Subject Matter Experts
SOW Scope of Work
USACE U.S. Army Corps of Engineers
1.0 OVERVIEW
1.1 Introduction. This Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance that the Contracting Officer’s Representative (COR) will use in evaluating the technical and quality performance of the Contractor in accordance with the terms and conditions of the scope of work
(SOW) for Contract No. (solicitation W912DR-24-Q-0010). A copy of the signed final plan will be furnished to the Contractor so that the Contractor will be aware of the methods that the COR will use in evaluating performance of this contract and will be uploaded to the Procurement Integrated Enterprise
Environment (PIEE).
1.2 Purpose. The purpose of the QASP is to ensure that the performance of specific activities and the completion of final project deliverables are accomplished in accordance with all requirements set forth in the SOW). This QASP describes the mechanism for documenting noteworthy accomplishments or discrepancies for work performed by the Contractor. Information generated from COR’s surveillance activities will directly feed into performance discussions with the Contractor. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, the
Army receives the quality of services called for in the contract, and the Army only pays for acceptable services received.
The QASP is intended to accomplish the following:
• Define the role and responsibilities of participating Army officials.
• Define the final deliverables and standards that will be assessed.
• Describe the surveillance methodology that will be employed by the Army in assessing the
Contractor’s performance.
• Describe the surveillance documentation process and provide copies of the forms that the Army will use in evaluating the Contractor’s performance.
• Outline quality assurance procedures to be employed by the Government during performance of this task order.
• Define Evaluation Areas, including Quality, Schedule, Management, Small Business, Regulatory
Compliance, and other areas (as applicable).
• Define Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory performance standards for final deliverables and standards.
• Ensure clarity on recent changes to the formulation of contractor evaluations, from an overall/cumulative rating to a recommend/do not recommend.
• Outline corrective action procedures.
• Describe payment procedures.
2.0 ROLES AND RESPONSIBILITIES OF QUALITY ASSURANCE ARMY OFFICIALS
2.1 Contracting Officer. The Contracting Officer (KO) has overall responsibility for overseeing the
Contractor’s performance. The KO is responsible for the day-to-day monitoring of the Contractor’s performance in the areas of contract compliance, and contract administration; reviewing the COR’s assessment of the Contractor’s performance; and resolving all differences between the COR’s assessment and the Contractor’s assessment of performance. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The KO for this contract is Katie
Marrette at the U.S. Army Corps of Engineers (USACE), uestions for the KO should be directed to the assigned USACE
Contract Specialist, .
3.3 Performance Assessment Process. If a deliverable is rated as being unsatisfactory for Quality or
Regulatory Compliance at the time that the approved SOW deadline for the deliverable expires, the
Contractor may receive an unsatisfactory rating for Schedule, unless there is an Army approved delay that extends the SOW deliverable. This will only take place during the rating period, and will not necessarily influence future/later ratings.
3.3.1 Army Approved Delays. At the discretion of the COR, the performance standard of Schedule outlined in Table 4, may not be monitored due to Army-Approved delays. QAMFs will track and report this based on Contractor monthly reports to the COR.
3.4 Recommendation. In lieu of an overall rating, the Contractor will either be recommended/not recommended for similar future requirements.
3.5 Key Deliverables to be assessed. The following deliverables will be evaluated in accordance with this
QASP:
3.5.1 Final Deliverables
• Work Plan
• Site Safety and Health Plan and Accident Prevention Plan
• Completed Fence Repair
3.5.2 Monitoring Method
• 100% Inspection: All project deliverables will be evaluated through 100% inspection by onsite inspection or document review. The USACE Project Manager will document performance for each completed deliverable prior to payment, as described in Section 5.0.
• Periodic Inspection: At the USACE Project Manager’s discretion, periodic inspections will be conducted to evaluate progress toward deliverables. This will include QA Inspections (safety, geophysics, chemical data packages, etc.) by a government representative. The USACE Project
Manager may also complete a periodic progress inspection if he/she believes that deficiencies exist that must be addressed prior to deliverable completion. While corrective action or re-performance will be required if necessary, the Contractor will not be financially penalized for unacceptable performance recorded in periodic progress reports, provided that final performance evaluation of the deliverable is deemed acceptable.
• Customer Feedback: Contractor performance feedback will be obtained through periodic inquiries by the USACE Project Manager with project stakeholders. The purpose of these inquiries would be to supplement the other forms of evaluation and to also provide the Contractor with constructive criticism and/or recognition for the project deliverables completed. Customer feedback received will be thoroughly validated to ensure it relates to the requirements of the
SOW and will be used in a prudent manner by the COR. Customer feedback will also be solicited in the form of a concurrence letter by the Contractor from appropriate stakeholders for final deliverables.
3.5.3Additional Surveillance Activities
Additional Government surveillance activities may include, but are not limited to, the following:
• Review and approval of meeting minutes.
• Review of daily reports.
• Review of data deliverables.
• Oversight of field work activities.
• Review of uploaded electronic deliverables.
• Review of the Contractor’s quality control documentation.
Manager will forward these records through the COR and to the KO at termination or completion of the contract.
4.4 Technical Quality Assurance Monitoring. In general, all work will be evaluated in terms of how well the requirements of the task order are satisfied, the extent to which the work performed follows the approach found in the contractor’s technical proposal and/or implements the decision of Technical Project
Planning, and clarity of documentation. At the discretion of the COR or the Contracting Officer or
Specialist, other government officials approved by the Contracting Officer or Specialist may be asked to evaluate a particular deliverable or set of deliverables. The results of all Technical Quality Assurance
Monitoring will be documented using a Technical Review Form. Technical Quality Assurance
Monitoring Documentation will document technical criteria evaluated. Relevant forms are included as attachments to this document and will be updated as needed.
5.0 PAYMENT
5.1 Acceptable Performance. Estimates are typically made monthly, but can be made other than monthly, of the amount and value of the work and services performed by the Contractor under this contract which meet the standards of quality established under this contract. The estimates, along with any supporting data required by the Contracting Officer, shall be prepared by the Contractor and submitted along with its voucher. After receipt of each substantiated voucher, the Government shall pay the voucher as approved by the Contracting Officer or authorized representative.
5.2 Unsatisfactory Performance. If a deliverable receives an unsatisfactory rating for either the Quality or Regulatory Compliance performance standard, re-performance is required until the deliverable receives an acceptable rating. This re-performance is required regardless of cost or schedule constraints that may result from the unsatisfactory performance, unless the KO has opted to terminate the contract.
QASP Approval:
Name Date
Contracting Officer’s Representative
File details come from the government source that posted it. Updated .