B.08.02_Att13 - 01 22 00 Price and Payment Procedures.docx
DOCX document 34 KB Posted
- Solicitation number
- IEU-24-0008
- Issued by
-
Department of the Army European Command
About this file
This document is a Section 01 22 00 "Price and Payment Procedures" that details the payment items and schedule for a federal contract opportunity related to the renovation of a fire and rescue station in Svencionys, Lithuania.
The key details are:
- The contract includes base bid items for renovation of the exterior insulation and facade, replacement of the asbestos roof, replacement of roof gutters/downspouts/rainwater management system, perimeter concrete paving, and replacement of exterior doors.
- There is an optional bid item for garage improvements including exhaust system, window/light replacement, heating system renovation, and epoxy floor coating.
- The contract will be a Design-Build, Firm Fixed Price contract with an estimated value between $500,000 and $1,000,000 USD.
- The anticipated performance period is 1-2 years after contract award.
- The contract opportunity is being competed with full and open competition, with no small business set-asides.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/21
PART 1 GENERAL
PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).
Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
SCHEDULE OF ITEMS: BASE ITEMS
Base Item 0001: Renovation of exterior insulation and façade
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of an EIFS system to cover the exterior walls and attic slab. This includes but is not limited to insulating the exterior of the building, insulating the attic, replacing communications mast, providing plaster and wood type siding to various portions of the building as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0002: Replaces asbestos roof
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of a new roofing system, this includes the proper disposal of the asbestos containing roof that is currently installed. This work also includes the replacement of the flat roof membrane and adding a lighting protection system as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0003: Replace roof gutters, downspouts, and rainwater management system
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of the roof gutters and downspouts. This includes work to tie the roof gutters and downspouts into the perimeter rainwater management system. The rainwater management system is to connect to the cities system and drain water from the perimeter of the facility as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0004: Provide permitter concrete paving around building
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of the perimeter concrete apron around the building to protect the underground EIFs and water protection systems as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0005: Replace exterior doors
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of the 4 exterior doors as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Awarding of Options
The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s).
Option 1: Item 0006: Garage Improvements
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of garage improvements, including the replacement of the existing vehicle exhaust system with a new system, replacement of the garage windows and light fixtures, renovation of the garage heating system, and providing an epoxy mastic floor coating as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3