This document outlines price and payment procedures for a federal contract opportunity to renovate the interior electrical distribution system at a redevelopment hospital in Liberia. Key details include:

  • The contract includes three base items - design of the renovated electrical system, construction of the renovated system, and an optional automatic transfer switch for the main generator system. Payment will be made as jobs are completed for each base item.

  • Pricing is structured with lump sum payments for single job payment items as described in the document and price schedule. All costs must be included in the associated job item and payment will constitute full compensation for all required work.

  • The related federal contract opportunity is solicitation number W912GB24R0019 from the Department of the Army European Command to electrify Redemption Hospital in Liberia.

The document provides payment terms and outlines the scope of work items included in the contract for renovating an electrical distribution system at a hospital in Liberia being solicited by the Department of the Army European Command. Pricing and payments are structured as lump sums for completion of defined job items.

View the file

Other files

File Type Posted
B.08.02_W912GB24R0019 Amendment 0002 Conformed_ IAF-24-0005 Electrification of Redemption Hospital, Liberia.pdf PDF
B.08.02_W912GB24R0019 Amendment 0002 Summary_ IAF-24-0005 Electrification of Redemption Hospital, Liberia.pdf PDF
B.08.01_W912GB24R0019 Amendment 001 Summary_ IAF-24-0005 Electrification of Redemption Hospital, Liberia.pdf PDF
A.02.08 Statement of Work Amended 31JAN24.pdf PDF
B.08.01_W912GB24R0019 Amendment 001 Conformed_ IAF-24-0005 Electrification of Redemption Hospital, Liberia.pdf PDF
B.08.02 Att 15 - PIEE INSTRUCTIONS FOR PROPOSAL SUBMITTAL.pdf PDF
IAF-24-0005_Redemption Hospital Liberia_Pre-Proposal Conference Slides.pptx PPTX presentation
B.08.02 Att 1 Conceptual Site plan.pdf PDF
B.08.02 Att 13 Specs Binder IAF-23-0014.pdf PDF
A.02.08 Statement of Work.pdf PDF
B.08.02 Att 11 PPQ.pdf PDF
B.08.02 Att 9 Bank Letter of Assurance Sample.docx DOCX document
B.08.02 Att 5 Existing Electrical Distribution System Pictures.pdf PDF
B.08.02 Att 12 Commitment Letters.docx DOCX document
B.08.02 Att 6 Period of Performance Clause.docx DOCX document
B.08.02 Att 4 Dedication Plaque.pdf PDF
B.08.01_W912GB24R0019_ IAF-24-0005 Electrification of Redemption Hospital, Liberia_KO Signed.pdf PDF
B.08.02 Att 3 Preparation of Structural Calculations AOR AFRICOM with Att.pdf PDF
B.08.02 Att 2 Conceptual Floor Plan.pdf PDF
B.08.02 Att 14 Site Visit Registration Spreadsheet.xlsx XLSX spreadsheet
B.08.02 Att 10 Bank Letter of Guarantee Sample.docx DOCX document
B.08.02 Att 8 Price Schedule.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).

Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Design of Renovated Interior Electrical Distribution System

Unit of Measure: Job.

Payment will be made for costs associated with the design and ancillary analysis required to update the existing interior electrical distribution system as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Construction of Renovated Interior Electrical Distribution System

Payment will be made for costs associated with the procurement and construction to renovate the interior electrical distribution system as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 1: Base Item 0003: Automatic Transfer Switch for Main Generator System

Payment will be made for costs associated with the design, procurement, and installation of an automatic transfer switch, in lieu of the required manual transfer switch, for the main generator system as detailed in SECTION 01 10 10, subpart 5.4.4 GENERATOR SYSTEM. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3