B.08.02 Att 4_Existing Conditions Photographs.pdf

PDF 3 MB Posted

Attached to
IAF-23-0009 Mauritania - Hassi Ehel Ahmed Bichna School
Solicitation number
W912GB23R0044
Issued by

About this file

This file contains 22 photographs documenting existing conditions at the Hassi Ehel Ahmed Bichna School in Redpearl, Mauritania. The photographs show the school's administrative and classroom buildings, boundary walls, rainwater catchment systems, latrines, classrooms, doors, windows, ceilings, and roof structures. Deficiencies documented include damaged windows and doors missing locks, cracked latrine walls, plaster damages, improper rainwater catchment construction, unsealed roof penetrations and joints, and ridge construction issues.

The related federal contract opportunity is solicitation number W912GB23R0044 from the Department of the Army European Command for repairs and renovations to address the deficiencies photographed at the Hassi Ehel Ahmed Bichna School in Mauritania. The opportunity type is a solicitation, and the project is identified as IAF-23-0009 Mauritania - Hassi Ehel Ahmed Bichna School.

View the file

Other files

File Type Posted
B.08.03 Att 18 ProjNet Inquiry Report.pdf PDF
B.08.03 W912GB23R0044_0002 Conformed_Hassi Ehel Ahmed Bichna School.pdf PDF
B.08.03 W912GB23R0044_0002 Modifications Document_Hassi Ehel Ahmed Bichna School.pdf PDF
B.08.03 Att 17 Commitment Letters.docx DOCX document
B.08.03 W912GB23R0044_0001 Modifications Document_Hassi Ehel Ahmed Bichna School.pdf PDF
B.08.03 W912GB23R0044_0001 Conformed_Hassi Ehel Ahmed Bichna School.pdf PDF
B.08.03 Att 16_PPQ.pdf PDF
B.08.02 Att 2_Conceptual Site Plan NEW.pdf PDF
B.08.02 W912GB23R0044_Hassi Ehel Ahmed Bichna School.pdf PDF
B.08.02 Att 8_TAG13 The Design of VIP Latrines.pdf PDF
B.08.02 Att 1_Project Location Map.pdf PDF
B.08.02 Att 14 Bank Letter of Assurance Sample.docx DOCX document
B.08.02 Att 15 Bank Letter of Guarantee Sample.docx DOCX document
B.08.02 Att 9 Price Schedule.docx DOCX document
B.08.02 Att 11 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08.02 Att 13 Specs Binder IAF-23-0009.pdf PDF
B.08.02 Att 12 SOFA Agreement.pdf PDF
B.08.02 Att 5_Construction Drawings (Previous contract for reference only).pdf PDF
B.08.02 _Statement of Work (SOW) 27APR23.pdf PDF
B.08.02 Att 3_Dedication Plaque.pdf PDF
B.08.02 Att 10 Price and Payment Procedures.docx DOCX document
B.08.02 Att 6_Structural Calculations Guidelines_ AOR AFRICOM.pdf PDF
B.08.02 Att 7_Swing Gate.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hassi Ehel Ahmed Bichna School OHASIS ID# 66628 Redpearl, Mauritania

Attachment #4

Existing Conditions Photographs

Hassi Ehel Ahmed Bichna School

1: Existing Admin (front) and Classroom building and boundary wall (NAVFAC project)

2: Existing Admin bldg. (front side) and Classroom Bldg. (behind) and older damaged classroom (right)

3: Existing Classroom Bldg and VIP Latrines (right side)

4: Existing Classroom Bldg. and rainwater catchment system

5: Backside of the School Complex

6: Existing EU Classroom Building (not in scope)

7: Old/deteriorated classroom to be demolished

8: Masonry/ concrete shelving in the Admin Bldg.

9: Typical Classroom

10: Typical exterior doors (w/ missing locking hardware) and windows

11: Typical ceiling space of Admin and Classroom buildings

12: Rainwater catchment system between Admin and Classroom buildings

13: Damage window

14: Settlement /cracked latrine screen wall

15: Settlement /cracked latrine screen wall (inside)

16: Typical plaster damages

17: Existing Dry VIP Latrine

18: Rainwater Catchment, improper construction

19: Gable roof and exterior wall not sealed

20: Roof truss penetrating exterior wall not sealed

21: Ridge not properly constructed

22: Roof penetrations not sealed

File details come from the government source that posted it. Updated .