This document outlines payment procedures for the renovation of the Hassi Ehel Ahmed Bichna School in Mauritania under solicitation number W912GB23R0044 issued by the Department of the Army European Command. The solicitation includes base items for the renovation of the administrative building, north classroom building, east classroom building, and VIP latrine. It also includes optional items for a photovoltaic power system, raising the perimeter wall, and electrical work in the administrative building, north classroom, and east classroom. Payment will be made as lump sums for the completion of each base and optional item. Offerors should include all costs for required work in the associated line items and subline items.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/21
PART 1 GENERAL
PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).
Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
SCHEDULE OF ITEMS: BASE ITEMS
Base Item 0001: Administrative Building Renovation
Unit of Measure: Job.
Payment will be made for costs associated with the design and renovation of the existing administrative building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0002: Classroom North Renovation
Payment will be made for costs associated with the design and renovation of the existing north classroom building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0003: Classroom East Renovation
Payment will be made for costs associated with the design and renovation of the existing east classroom building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0004: VIP Latrine
Payment will be made for costs associated with the design and renovation of the existing VIP latrine as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0005: Site Work
Payment will be made for costs associated with the work required to improve the overall conditions of the site, inclusive of the required demolition of the deteriorated school, removal of the rainwater catchment system, and clearing of grub and vegetation, as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 1: Item 0006: Photovoltaic Power System
Payment will be made for costs associated with the design and construction of a photovoltaic power system as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 2: Item 0007: Raise Perimeter Wall
Payment will be made for costs associated with the work required to raise the perimeter wall as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 3: Item 0008: Administrative Building – Electrical
Payment will be made for costs associated with the design and renovation of the electrical system in the administrative building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 4: Item 0009: Classroom North – Electrical
Payment will be made for costs associated with the design and renovation of the electrical system in the north classroom building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 5: Item 0010: Classroom East – Electrical
Payment will be made for costs associated with the design and renovation of the electrical system in the east classroom building as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3