This is a Schedule B Price Sheet template for solicitation W50S8W-24-R-0001 to Construct VM/AGE Complex, with a period of performance from January 1, 2025 to March 4, 2026.

The price sheet is structured to capture direct labor costs for Foreman (2,118 hours), Journeyman (72,036 hours), and Apprentice (2,917 hours), along with fringe benefits and labor overhead rates (both set at 0%). The materials/services section includes requirements for Cold Storage Bay (3,130 SF), Vehicle Maintenance Wash Bay (1,130 SF), Heated Parking Shed (2,500 SF), Vehicle OPS Parking Shed (8,000 SF), two Crane & Rail systems, demolition of existing buildings (16,400 SF), and demolition/replacement of concrete taxiway (4,668 SY). The template includes sections for Other Direct Costs, G&A (0%), and profit rate (0%), though no dollar amounts are filled in.

View the file

Other files for this federal contract opportunity

Other files attached to Construct VM/AGE Complex, newest first.
File Type Posted
E-701 - PANEL SCHEDULES.pdf PDF
E-122 - FIRST FLOOR POWER PLAN - AREA 2.pdf PDF
E-101 - GROUNDING PLAN.pdf PDF
E-123 - ELECTRICAL POWER AND LIGHTING PLANS - PARKING SHEDS.pdf PDF
27 51 16 - BR.pdf PDF
10 14 00.20 - BR.pdf PDF
crouse-hinds-arktite-200a-plugs-receptacles-connectors-catalog-page.pdf PDF
32 13 13.06.pdf PDF
08 33 23 - BR.pdf PDF
x1806-71_cpp.pdf PDF
MS90362C.PDF PDF
Solicitation Amendment W50S8W25RA0030007 SF 30.pdf PDF
VM_AGE RFIs Answered - Version 3.xlsx XLSX spreadsheet
MS27265A.PDF PDF
60554859_WY-ANG_VMAF_S22 - Sheet - S-002.pdf PDF
08 36 19 - BR.pdf PDF
BASE MAP 24 1TO400.pdf PDF
Solicitation Amendment W50S8W25RA0030006 SF 30.pdf PDF
20230610_060238.jpg JPG image
Jack Tester Info.PDF PDF
9000 Series.pdf PDF
1994 Asbestos Survey - B21_23_24.pdf PDF
20230610_060152.jpg JPG image
Solicitation Amendment W50S8W25RA0030005 SF 30.pdf PDF
20230610_062744.jpg JPG image
ANG Sustainability Requirements Scoresheet.pdf PDF
VM_AGE RFIs Answered - Version 2.xlsx XLSX spreadsheet
Solicitation Amendment W50S8W25RA0030004 SF 30.pdf PDF
Existing VM_AGE as_builts.zip ZIP file
AECOM Drawings.zip ZIP file
GCFI Equipment.zip ZIP file
Geotechnical Report.zip ZIP file
TEMPLATE - H.02 Progress Schedule AF3064 (23-C-XXXX).pdf PDF
Communications UFC.zip ZIP file
Fire Spec List.zip ZIP file
Pavement Evaluations.zip ZIP file
Laydown Areas.zip ZIP file
VM_AGE Questions and Answers Version 1.xlsx XLSX spreadsheet
Solicitation Amendment W50S8W25RA0030003 SF 30.pdf PDF
Solicitation Amendment W50S8W25RA0030002 SF 30.pdf PDF
B.07 Pre-proposal Conference Site Visit Slides (25-R-A003).pptx PPTX presentation
Pre-Proposal Conference Attendance Roster.pdf PDF
Solicitation Amendment W50S8W25RA0030001 SF 30.pdf PDF
B.08 Attachment 7 - Entry Authorization Form.pdf PDF
B.08 Attachment 4 - Contractor Hazmat Usage Tracking Instructions.pdf PDF
B.08 Attachment 5 - Past Performance Questionnaire.docx DOCX document
B.08 Attachment 8 - Wage Determination.pdf PDF
Attachment 1 - SOW- Construct VM_AGE Complex - Aug 22 2024.pdf PDF
B.08 Attachment 7 - Entry Authorization Form.pdf PDF
Solicitation - W50S8W25RA003.pdf PDF
Show all 50

Construct VM/AGE Complex has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

ESTIMATED COST

W/OUT FULLY BURDEN

TOTAL ESTIMATED COST

(DO NOT INCLUDE FRINGE

HERE) ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

0 $ -

5. FRINGE BENEFITS RATE (%)

TOTAL DIRECT

Demolish Existing Buildings SF

Demolish 7" Th Concrete Taxiway & Install Asphalt Pavement SY

Vehicle Maintenance Wash Bay SF

Heated Parking Shed SF

Vehicle OPS Parking Shed SF

Crane & Rail for Vehicle Maintenance Wash Bay EA

Crane & Rail for Refueling EA

3,169

3,169

0% $ -

1. SOLICITATION NUBMER & TITLE: W50S8W-24-R-0001 - Construct VM/AGE Complex

2. PROJECT MANAGER:

Samuel Hoekwater

3. PERIOD OF PERFORMANCE*

FROM TO

Thu, 01-Jan-25 Fri, 04-Mar-26

6. LABOR OVERHEAD RATE (%)

TOTAL 4, 5

0% $ -

16,400

4,668

1 $ -

DESCRIPTION OF COST ELEMENTS

4. DIRECT LABOR (List Labor Cat) ESTIMATED HOURS / QTY RATE/UNIT COST ($)

2,118 $ -

SUBTOTAL

0 $ -

Foreman

Apprentice 2,917 $ -

Journeyman 72,036

1,130

2,500

8,000

9. G&A RATE (%)

TOTAL 4, 5, 6, 7, 8

0% $ -

SUBTOTAL COSTS

*Each period of performance requires an IGE (base award and all optional periods or tasks.)

SUBTOTAL

SCHEDULE B - PRICE SHEET

8. OTHER DIRECT COSTS

Travel

11. GRAND TOTAL ESTIMATED COST

7. MATERIALS/SERVICES (Excluding Information Technology (IT)

Cold Storage Bay SF

SUBTOTAL

3,130 $ -

10. PROFIT RATE (%)

0 $ -

TOTAL 10

0% $ -

CUI

2 PROJECT MANAGER Brooks Harris PERow1:
Thu 01Jun23Row1:
Fri 31May24Row1:
Supervisor:
140:
fill_18:
fill_19:
fill_20:
Skilled Trades:
58:
fill_23:
fill_24:
fill_25:
Laborer:
240:
fill_28:
fill_29:
fill_30:
Designer Design Build:
45:
fill_33:
fill_34:
fill_35:
Design technician Design Build:
160:
fill_38:
fill_39:
fill_40:
5 FRINGE BENEFITSRow1:
6 LABOR OVERHEADRow1:
7 MATERIALSSERVICES Excluding Information Technology IT:
Mobilization:
1:
fill_44:
fill_45:
fill_46:
Fence Removal:
2820:
fill_49:
fill_50:
fill_51:
Fence Gate Adjustment:
2:
fill_54:
fill_55:
fill_56:
Erosion Control Silt Fence:
50:
fill_59:
fill_60:
fill_61:
Fence Temporary Barrier:
250:
fill_64:
fill_65:
fill_66:
Temporary Fence Relocation:
1000:
fill_69:
fill_70:
fill_71:
Sidewalk Concrete 4 inch:
0:
fill_74:
fill_75:
fill_76:
10 Slide Gate:
0_2:
fill_79:
fill_80:
fill_81:
Repair asphalt and concrete areas:
Other Security MeasuresRow1:
1Row1:
fill_8:
fill_9:
8 OTHER DIRECT COSTS:
fill_84:
fill_85:
TravelRow1:
1Row1_2:
Row1:
9 GARow1:
0_3:
fill_87:
fill_88:
RATE:
10 PROFITRow1:
0_4:
fill_91:
fill_92:

File details come from the government source that posted it. Updated .