This document is an Attachment to a Design-Build Statement of Work (SOW) for Independent Structural Proofing, dated October 2023. The attachment outlines comprehensive requirements for structural design verification, specifically mandating that an independent, licensed proofing engineer must review and validate all structural calculations, drawings, and design documents for a construction project.

The scope requires the proofing engineer to independently review structural design calculations, execution drawings, structural fire protection verifications, and for high seismic zones, non-structural components like electrical and mechanical system anchorage. Deliverables include a detailed proofing report listing project details, structural system descriptions, design assumptions, applicable codes, technical findings, and a final statement confirming structural design compliance. The proofing engineer must provide red-lined, stamped, and signed calculations and drawings, with the Contractor's Designer of Record required to demonstrate that all proofing remarks have been addressed in the final design submission.

View the file

Other files

File Type Posted
B.08 Solicitation - SF30 W912GB25RA0040002 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0040002 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0040001 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - SF30 W912GB25RA0040001 Mongo Health Clinic, Chad.pdf PDF
B.08 Att 7 TAG13 The Design of Ventilated Improved Pit (VIP) Latrines.pdf PDF
B.08 Att 1 SOW_Location Map.pdf PDF
A.02 SOW_Mongo Health Clinic, Chad.pdf PDF
B.08 Att 17 Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 Att 13 Price and Payment Procedures.docx DOCX document
B.08 Att 20 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 Att 19 Price Schedule Mongo Health Clinic, Chad.docx DOCX document
B.08 Att 9 Site Access.pdf PDF
B.08 Att 4 SOW_ Structural Calculations Guideline.pdf PDF
B.08 Solicitation - W912GB25RA004 Mongo Health Clinic, Chad.pdf PDF
B.08 Att 12 Period of Performance Clause Mongo Health Clinic, Chad.docx DOCX document
B.08 Att 21 Commitment Letters.docx DOCX document
B.08 Att 15 Bank Letter of Guarantee (BLG).docx DOCX document
SSP Mongo Health Clinic Chad.pdf PDF
B.08 Att 18 Past Performance Questionnaire PPQ.docx DOCX document
B.08 Att 11 Full Spec Binder_ Mongo Health Clinic, Chad.pdf PDF
B.08 Att 14 Bank Letter of Assurance (BLA).docx DOCX document
B.08 Att 5 SOW_ Dedication Plaque.pdf PDF
B.08 Att 10 Conceptual Design Package.pdf PDF
B.08 Att 2 SOW_Conceptual Site Plan.pdf PDF
B.08 Att 16 Past Performance Information Sheet_Rev 13 Feb 2023.docx DOCX document
B.08 Att 3 SOW_ Conceptual Floor Plan.pdf PDF
B.08 Att 8 WHO Fact Sheet 3.5.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT TO DESIGN BUILD SOW – SCOPE FOR INDEPENDENT STRUCTURAL PROOFING

CENAU‐EDD OCT 2023

Page | 1

I. General scope

The structural calculations and drawings must be proofed by an independent proofing engineer, licensed as required for structural design in the host nation (HN) of the appropriate discipline(s)

(ie. Concrete, steel timber) at the Contractor’s expense. A complete set of proofed and stamped structural design documents as well as the final structural proofing report must be submitted with the Corrected Final design submittal. For this purpose the Contractor must coordinate early enough with the selected proofing engineer. Contractor is responsible for ensuring proofing meets all requirements of the applicable building code, and as applicable meets all requirements necessary to achieve HN permitting. The proofing engineer must be objective and independent from DOR. All conflicts of interest between the proofing engineer and the DOR must be disclosed to the COR prior to the start of the proofing process.

II. Specific scope: The proofing effort includes:

1. Proofing of the Structural Design Calculations and the verifications of structural fire protection.

2. Proofing of structural execution drawings, including but not limited to: Reinforcement drawings, structural steel drawings, structural shop drawings, etc.

3. For high seismic zones proofing of structural execution drawings shown in non‐structural sheets, including but not limited to: Anchorage and bracing of non‐structural components (electrical, mechanical, architectural, fire protection, etc)

III. Deliverables: This task shall include the following deliverables at the final design stage:

1. Proofing Report(s):

The proofing report(s) need(s) to clearly document the proofing effort.

The report shall list as a minimum:

A. Name, title, and address of proofing engineer

Name, title, and address of designer of record

B. Project name and location

C. Complete list of proofed documents

If the proofing effort consists of different review phases the report shall be updated with each phase listing all proofed documents with dates of proofing effort.

D. Project description

E. Description of the structural system, including but not limited to: Foundation system, vertical forces resisting system, lateral forces resisting system, structural materials, etc.

F. Structural assumptions including but not limited to:

‐ Gravity Loads (dead load, live load, etc.).

‐ Environmental loads (wind, snow, rain, ice, etc.).

‐ Seismic loads and seismic design information (seismic zone, seismic design category, base shear, design spectrum, etc.).

‐ Soil data (allowable bearing capacity, subgrade reaction modulus, lateral earth pressures, etc.).

G. Applicable codes and regulations

H. Findings:

‐ Interim proofing reports shall list in detail the technical findings and the required

ATTACHMENT TO DESIGN BUILD SOW – SCOPE FOR INDEPENDENT STRUCTURAL PROOFING

CENAU‐EDD OCT 2023

Page | 2 actions

‐ Final proofing reports shall document that all findings are addressed within the final design package.

If items still need to be addressed during execution, the report shall state so.

I. Final statement: The final statement shall summarize the proofing effort. If the proofing effort is completed the statement shall state that the proofing effort is completed and that there are no structural concerns against the execution in accordance with the proofed documents

J. Stamp and signature

2. Calculations:

Complete set of red lined proofed structural calculations with proofing remarks provided to the Contractor Designer of Record during the proofing process.

The set shall be stamped and signed on the title page by the Independent Proofing Engineer.

3. Drawings

Complete set of structural red lined drawings with proofing remarks.

The set be stamped and signed on the title page by the Independent Proofing Engineer remarks provided to the Contractor Designer of Record during the proofing process.

IV. Final design documents:

The Contractor DOR shall demonstrate at the final design submittal that all structural proofing remarks are addressed within the final design documents. The final drawings shall receive a remark indicating that the independent proofing remarks are addressed.

File details come from the government source that posted it. Updated .