The document is a Price and Payment Procedures specification for a design-build health clinic project in Mongo, Chad. The contract includes two base items and two optional items: Base Item 0001 covers the design of the health clinic facility, Base Item 0002 covers construction of the facility, Option 0001 covers design of a photovoltaic system, and Option 0002 covers construction of the photovoltaic system. Payment for each item will be made on a job basis, with full compensation including labor, materials, equipment, quality control, environmental protection, safety requirements, and associated tests and reports.

The payment schedule specifies that contractors will be reimbursed for each defined work element, with costs for work not specifically mentioned to be included in the most closely associated job item. The project requires design and construction of a new clinic building in Mongo, Chad, including two raised water storage tanks and ventilated improved pit (VIP) latrines. A pre-proposal site visit is scheduled for 23 April 2025, with mandatory pre-registration by 21 April 2025, and proposals must be submitted with both nonprice and price components. Contractors must be SAM registered to be eligible for the contract, which is being managed by the Department of the Army European Command.

View the file

Other files

File Type Posted
B.08 Solicitation - SF30 W912GB25RA0040002 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0040002 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0040001 Mongo Health Clinic, Chad.pdf PDF
B.08 Solicitation - SF30 W912GB25RA0040001 Mongo Health Clinic, Chad.pdf PDF
B.08 Att 6 SOW_ Scope for Independent Structural Proofing.pdf PDF
B.08 Att 7 TAG13 The Design of Ventilated Improved Pit (VIP) Latrines.pdf PDF
B.08 Att 1 SOW_Location Map.pdf PDF
A.02 SOW_Mongo Health Clinic, Chad.pdf PDF
B.08 Att 17 Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 Att 20 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 Att 19 Price Schedule Mongo Health Clinic, Chad.docx DOCX document
B.08 Att 9 Site Access.pdf PDF
B.08 Att 4 SOW_ Structural Calculations Guideline.pdf PDF
B.08 Solicitation - W912GB25RA004 Mongo Health Clinic, Chad.pdf PDF
B.08 Att 12 Period of Performance Clause Mongo Health Clinic, Chad.docx DOCX document
B.08 Att 21 Commitment Letters.docx DOCX document
B.08 Att 15 Bank Letter of Guarantee (BLG).docx DOCX document
SSP Mongo Health Clinic Chad.pdf PDF
B.08 Att 18 Past Performance Questionnaire PPQ.docx DOCX document
B.08 Att 11 Full Spec Binder_ Mongo Health Clinic, Chad.pdf PDF
B.08 Att 14 Bank Letter of Assurance (BLA).docx DOCX document
B.08 Att 5 SOW_ Dedication Plaque.pdf PDF
B.08 Att 10 Conceptual Design Package.pdf PDF
B.08 Att 2 SOW_Conceptual Site Plan.pdf PDF
B.08 Att 16 Past Performance Information Sheet_Rev 13 Feb 2023.docx DOCX document
B.08 Att 3 SOW_ Conceptual Floor Plan.pdf PDF
B.08 Att 8 WHO Fact Sheet 3.5.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the base item (Base Item 0001).

Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Design of Health Clinic Facility

Unit of Measure: Job.

Payment will be made for costs associated with the design of a new clinic facility in Mongo, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Construction of Health Clinic Facility

Unit of Measure: Job.

Payment will be made for costs associated with the procurement and construction of a new health clinic facility in Mongo, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

SCHEDULE OF ITEMS: OPTION ITEMS

Option 0001, Base Item 0003: Design of Photovoltaic System

Unit of Measure: Job.

Payment will be made for costs associated with the design of a photovoltaic system for the new health clinic facility, as indicated in SECTION 01 10 10. This work shall include all applicable site prep, demolition, and removals work to support the work elements contained in this item.

Option 0002, Base Item 0004: Construction of Photovoltaic System

Unit of Measure: Job.

Payment will be made for costs associated with the procurement and construction of a new photovoltaic system for the new health clinic facility, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3