About this file
This is a price schedule template for the Jarva-Jaani School Renovation project in Estonia, requiring contractors to provide pricing for both base and option items. The base items include reconfiguring the floor plan, electrical room upgrades, and life and safety upgrades, while the option items cover replacing combustible ceilings and updating the heat transfer station. All prices must include labor, materials, equipment, and services necessary for design and construction.
The schedule is associated with solicitation W912GB25R0034 from the Department of the Army European Command, with work to commence in October 2024. The government reserves the right to award option items up to 90 days after contract award. The project involves renovating the sub-basement of an existing school built in the 1940s/60s to meet safety and sanitary requirements, including main electrical and heating plant upgrades, fire door replacements, and ceiling refurbishment. A pre-proposal site visit is scheduled for March 12, 2025, at 1000 hours local time in Jarva-Jaani Village, Estonia (coordinates: 59°02'50.4"N, 25°53'01.8"E), with registration required by March 10, 2025.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR PRICE SCHEDULE
(Non-Israel Projects)
PRICE SCHEDULE
Jarva-Jaani School Renovation Jarva-Jaani, Estonia 23-Oct-2024
Offerors shall provide pricing for all base and option items.
The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Solicitation. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation for the period of performance for all base and option items.
Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation for the liquidated damages for all base and option items.
Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.
| Item No. |
| Title |
| Quantity |
| Unit |
| Unit Price |
| Amount |
BASE ITEMS
| 0001 |
| Reconfigure Floor Plan |
| 1 |
| Job |
| $ |
| $ |
| 0002 |
| Electrical Room Upgrades |
| 1 |
| Job |
| $ |
| $ |
| 0003 |
| Life and Safety Upgrades |
| 1 |
| Job |
| $ |
| $ |
| Total of Base Items 0001 thru 0003 |
| $ |
OPTION ITEMS
| 0004 |
| Replace Combustible Ceilings |
| 1 |
| Job |
| $ |
| $ |
| 0005 |
| Update Heat Transfer Station |
| 1 |
| Job |
| $ |
| $ |
| Total of Option Items 0004 thru 0005 |
| $ |
Total of all Base and Option Items
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --