B.06 SOLICITATION RELEASED.pdf
PDF 1 MB Posted
- Attached to
- Construct Fiber Optic Path, Underground Conduit
- Solicitation number
- W508SW22R0003
- Issued by
-
Department of the Army National Guard
About this file
This is a solicitation for a construction project to install underground conduit to replace a fiber optic line. The solicitation requests quotes to install 500 linear feet of new duct bank and communications manhole at a National Guard base in Wyoming to maintain connectivity between buildings. Quotes are due on May 26, 2022. The project is set aside for small businesses and has a period of performance of six months. The procurement is valued between $150,000 to $250,000. The solicitation includes plans, specifications and requirements for the fiber optic line replacement work while maintaining operational communications lines throughout construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Aw ard w ill be made to the responsible offeror w hose proposal conforms to the Request for Proposal (RFP) and is most advantageous to the Government considering price and price related factors.
2. Project Title: Replace Fiber Optic Line Number: DPEZ 212224
3. Quotes are due on Wednesday May 19, 2022 at 4:30PM MST Questions are due on Monday May 12, 2022 at 10AM MST Site Visit is scheduled for Tuesday May 10, 2022 at 1PM MST at 217 Dell Range Blvd Cheyenne, WT 82009 Entry Authority List ( attached separatley) must be returned by Thursday May 5, 2022 at 12PM MST for access on day of site visit
4. The procurement is being solicted as a Small Business Set-Aside. The North American Industry classification Code is 237990. The size standard for Small Business is $39.5M.
5. The Project magnitude is betw een $150,000 and $250,000.
6. All documents including plans and specif ications w ill be available only from beta.sam.gov. Ensure to follow all directions carefully.
7. Funds are presently available for this contract. Aw ard w ill be made to the offeror w ho represents the best value to the Government as outlined in accordance w ith the criteria set forth w ithin the solicitation.
KIRSTOPHER W. KAHLE 307-772-6884
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Apr-2022
(RFP)
(IFB)
X
CALL:
Replace Fiber Optic Line
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 May 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USPFO WY 153 MISSION SUPPORT CONTRACTING
217 DELL RANGE BLVD
CHEYENNE WY 82009-4799
W50S8W
PAGE OF PAGES
1 OF
CODE W50S8W
(Title, identifying no., date):
12B. CALENDAR DAYS
04:30 PM (hour)
Sealed envelopes containing offers
WYOMING AIR NATIONAL GUARD ADMIN OFFICE
217 DELL RANGE BLVD
CHEYENNE WY 82009
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
DPEZ 212224
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W50S8W22R0003 55
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W50S8W22R0003
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Entire project. Replace fiber optic line
FFP
This project constructs 500 linear feet of new duct bank, in order to facilitate new communications lines (fiber and copper) between existing manhole M-18 to manhole M-20. The project also required new installation of a communications manhole (see plans for more information). More details can be found on “C” plan sheets, project specifications and other related documents prepared for this project.
As shown the drawings, the Contractor for this project shall be responsible for demolition of concrete and asphalt, excavating, and repaving asphalt over the dig areas. All work required to install the communication lines shall be completed under this project. The Contractor shall meet the requirements given in the specifications for all aspects of this project. The project shall be a complete and usable system, less the fiber and copper communication lines.
FOB: Destination
PSC CD: Z2NZ
NET AMT
STATEMENT OF WORK
Replace Fiber Optic Line
DPEZ 212224
Scope of Work
10 December 2021
PROJECT LOCATION
217 Dell Range Blvd
Cheyenne, WY 82009-4799
GENERAL SCOPE OF WORK
Project Objective:
The work covered by this specification consists of furnishing all labor, equipment and material and performing all work to: install a duct bank to replace fiber optic line. This is a SRM project with plans and specifications provided for the project. All work must be performed to maintain communications, install new utility, and reconstruct all damaged or excavated areas. Communication lines include, but not limited to connecting Building 20, Building 31A, Building 37 and any other communications associated with the project site, must be maintained throughout the project. This project does not install the fiber optic or copper lines but provides all infrastructure in order to facilitate the lines (see attached plans).
Plans specifically related to the fiber optic line and Specifications 27 10 00, 27 13 23.00 40, and 27 21 10.00 40 are included as part of this project.
Location:
The site for the project is Building 20, Building 31A, Building 33, Building 37 and the area between the facilities on the WYANG Base.
153d Airlift Wing
217 Dell Range Blvd Cheyenne, WY 82009
Project Funding:
1. 100% Federally Funded, however, Davis Bacon Prevailing Wages apply.
2. Only Bricks and Mortar type and built-in equipment will be constructed / installed.
3. The funds are SRM funds and all work must conform to the ANG regulations and requirements for such funds.
4. The project must also be complete and usable in order to be considered complete.
Project Time Management:
1. Based on the Scope of Work, generate a critical path project timeline schedule to be followed from project initial work to project completion.
2. Identify and inform the Owner of any substantial changes in the project timeline (eg, weather, materials, etc.). Include any potential ways to avoid delaying the completion date.
PROJECT DETAILS
Project CLIN and ABI:
CLIN 01: Entire project. Replace fiber optic line.
Period of Performance: Six Months
Evaluation Criteria: Lowest price Technically Expectable.
Project Description: This project constructs 500 linear feet of new duct bank, in order to facilitate new communications lines (fiber and copper) between existing manholes M-18 to manhole M-
20. The project also required new installation of a communications manhole (see plans for more information). More details can be found on “C” plan sheets, project specifications and other related documents prepared for this project.
As shown the drawings, the Contractor for this project shall be responsible for demolition of concrete and asphalt, excavating, and repaving asphalt over the dig areas. All work required to install the communication lines shall be completed under this project. The Contractor shall meet the requirements given in the specifications for all aspects of this project. The project shall be a complete and usable system, less the fiber and copper communication lines.
Existing Facility Condition: Refer to plan sheet C101, C102, C107, C108, and other respective plans.
Project Budget:
The project must not exceed the contracted budget. Expenses beyond the given budget will not be paid out unless the additional expense is expressly authorized by the Contracting Officer (KO) through the contract amendment procedure agreed to in the project contract. Payouts will be authorized once the Owner receives an invoice detailing authorized work performed. The authorized work performed must satisfy the given requirements in this SOW document. Payouts will be authorized in reference to the percentage of authorized work performed to the percentage of budget paid out.
Project Timeline:
A suggested timeline is listed below; however, beyond any time requirement given in this document, final work scheduling is at the discretion of the Contractor, provided the work is completed within a reasonable timeframe. The Contractor is encouraged to propose the most time-efficient solution that meets the requirements in this Scope of Work. The Contractor shall minimize disruption to base operations. The base fiber connections must remain active for the entire duration of the project.
Phase 1: Saw cut and excavate the path for the new duct bank. Install the new duct bank and manhole. Include two (2) pull strings in each conduit.
Phase 2: Prove all conduit in the duct bank by pulling object as specified by 153 Communications Flight through each conduit. The contractor may elect to scope (video record) the interior of the pipe in lieu of pulling an object through, as long as it clearly proves the path.
Phase 3: Bury, compact, and install pavement over the fiber duct bank as referenced in the drawings and specs. Clean up and restore all area to pre-construction conditions or better.
Environmental:
1. Apply for and obtain a WYPDES Storm Water Construction General Permit through DEQ. This includes submitting a Notice of Intent, a complete Storm Water Pollution Prevention Plan, the appropriate permit fee, and a map showing access to the facility from a public road. The Contractor must provide a copy of Storm Water Pollution Prevention Plan (SWPPP) to the Owner for review before applying for Department of Environmental Quality General Construction Permit.
a. If seeding is required, the Contractor will be responsible for stabilization up to and through the one year warranty period.
b. At the end of the warranty period and once the stabilization is deemed successful by the Owner, the Contractor will remove any temporary erosion control measures (e.g. silt fencing) and notify DEQ of the project’s completion. The SWPPP will then be transferred to the Owners management.
2. Communicate and coordinate with the Civil Engineering Office for any currently unknown and unforeseen environmental conditions discovered in the field during design or construction.
Other:
1. Contractor shall thoroughly check all work to ensure it meets the objective of a complete and usable system.
2. All work completed under this contract shall be guaranteed by the contractor against failure of workmanship and/or materials for a period of one (1) year from date of final acceptance of the project.
3. Contractor shall adhere to all applicable local, state, and federal laws, codes, and regulations including the current edition of the following:
a. Wyoming Public Works Standards
b. Wyoming Dept. of Environmental Quality regulations
c. International Building and Electrical Code
d. In compliance with any other federal, state, and/or authority having jurisdiction codes and ordinances, DoD and National Guard Bureau regulations, and all industry standards.
4. The Contractor will solely bear all fines and or penalties imposed by any regulatory agency that result from the Contractor’s failure to comply with applicable laws, regulations, and standards.
5. Contractor shall keep the construction site clear of trash and maintain a well-organized site appearance.
6. Perform any other miscellaneous work related to the project not covered under separate line items.
7. Contractor must “Call before you dig” to determine location of any possible gas, water, electrical lines, or other potential hazards and utilities.
8. Contractor shall submit a dig permit request to the COR for location of all WYANG government owned gas, water, electrical, sewer, or other utility lines.
9. Contractor must include pricing for any needed third party locating services in their bid.
10. Contractor is to minimize damage to the land, soil, roads, water, wildlife, and structures.
Any damage to the site in excess of normal construction operations must be repaired at the Contractor’s expense in a timely manner at no expense to the Owner.
11. Contractor will plan for all digging activities to include digging through 13 inches of concrete before reaching soil. Most of the base is covered in 13 inches of concrete, although some locations have soil on top of abandoned concrete. The Contractor will include in the bid any necessary costs for digging, drilling, cutting, or other construction activities necessary to accomplish the Project through 13 inches of ground level concrete.
12. Contractor shall hand dig within five (5) feet of any underground utility.
13. Contractor must work in good effort with other contractors in the work area, vicinity, and throughout the base.
14. Contractor shall avoid conflicts with other utilities and will “bend” communication utility around other utilities in the path.
15. Contractor shall maintain operational communication lines throughout the whole project.
16. Contractor shall provide a complete and usable utility, with the ability to connect Buildings 20, 31A, 33, 20 (relocated), and 37 via fiber and copper. Operational test must prove the utility is operating as intended.
17. Fiber and copper communication shall remain active during the project.
18. Contractor shall not cut, or demolish any existing cabling (fiber or copper).
19. Contractor shall provide “as-installed” or “as-built” drawings. Provide a minimum of two
(2) copies; one to CE and one to CF.
20. We will not allow splicing of fiber or copper. Should the contractor damage any communications line on base during the project he must replace with home runs to their respective termination locations. Reference AFBAN FS 2021 Chapter 4 for OSP Infrastructure Requirements, specifically if this run is between ITN’s. Home Run cable design is the recommended method of fiber distribution when adequate OSP pathway is available. In order to conserve preinstalled available pathway, fiber optic trunk design should be considered if ITB to EB fiber routes must traverse existing available pathway routes that are near capacity.
21. The following references must be adhered to: a. References for fiber splicing/termination in comm. rooms: IAW Corning Cable Systems, SRP 005-014, Corning Cable Systems, SRP 003-895, TO 31-10-34-WA-1, 4.9-4.10 and 4.13-4.15.
References for routing cable from demark point of entry to rack: IAW TIA 569-D, section 9.7 and 9.9.2.3, TO 31-10-34-WA-1, section 3.19 - 3.20. and AFBAN-FS 2021
PROJECT DELIVERABLES AND SUBMITTALS
Approvals and Changes:
1. Submit all proposed change order documents to the Contracting Officer (KO) and Contracting Officer Representative (COR) for approval prior to procurement of equipment and commencement of the change.
2. No deviation from approved plans, specifications and general notes will be permitted without approval. Requests are to be submitted to the KO and COR on a substitution request form (available from the COR).
Submittals (to be submitted after award):
All submittals listed below shall be submitted at least 30 working days prior to use on site, or as noted below.
1. Submittals
a. The Government shall have up to 10 working days to review/approve initial submittals. The contractor shall not proceed without approved submittals.
b. These items shall be submitted no later than the Preconstruction Meeting
i. AF 3064 (or equivalent) – Project Schedule
ii. AF 3065 (or equivalent) – Schedule of Values
c. These items shall be submitted at least 30 working days prior to use on site.
i. Safety Plan
ii. Quality Control Plan
iii. All required communication duct bank line submittals listed in the specifications. Including Specifications 27 10 00, 27 13 23.00 40, and 27
21 10.00 40. This does not include submittals involving the optical or copper cabling, which will be installed under a different contract.
iv. Conduit
v. Concrete mix design, with specified strength
vi. Joint sealants, rebar
vii. Aggregate for conduit base
viii. Rebar
ix. New manhole (shop drawing)
d. See plans and specifications for other items
2. For Each Hazardous Material
a. Manufacturer MSDS
b. # of components in material if it is a kit
c. Container type
d. Unit (oz, gal, lb, qt, ea, etc.)
e. Package (can, drum, bottle, cylinder, etc.)
f. Part Number of MSDS if multiple part numbers on MSDS.
Administrative:
1. Hold a pre-construction meeting at the project site, in person, at least 14 days before the project start date. The purpose of this meeting is to review all project work items the project schedule.
2. The Contractor shall be responsible for maintaining any necessary licenses, bonding and permits, to include any manifest requirements and for complying with any federal, Department of Transportation (DOT), state, and municipal laws, codes, and regulations applicable to the performance of work. Contractor shall provide proof of such applicable licenses and permits prior to performing any work.
3. Provide copies, when requested, of any documentation related to this project. This includes but is not limited to:
a. Prime Contractor and/or Sub Contractor contact information
b. License and/or permitting documents
c. Design drawings, either final or draft
d. Inspection or testing results
e. Other information related to this project
4. Provide a copy of Storm Water Pollution Prevention Plan (SWPPP) to BCE for review before applying for Department of Environmental Quality General Construction Permit.
Other Deliverables:
See Plans and Specifications.
MATERIAL AND EQUIPTMENT ACCOUNTABILITY
Storage
1. The Contractor is ultimately responsible for the storage and safe keeping of all materials related to the project. The WYANG may, at the discretion of the KO, authorize storage of project materials in government facilities. However even if materials are stored in government facilities, WYANG does not assume any responsibility of safe keeping or securing any materials used on the project. Any costs associated with storing project materials must be included in the bid.
2. Notify the government Project Manager prior to delivery of any material or equipment to the site. The contractor shall ensure someone is available to receive delivered materials and able to store them safely in an area to be coordinated with the government project manager. Any materials delivered without prior coordination and without having someone to take receipt, shall not be accepted and will be turned away.
Equipment
1. The Contractor will supply all necessary equipment and tools to complete the project.
Any costs for procuring equipment and tools must be included in the bid.
2. The Contractor will not utilize any government equipment or tools.
Material Disposal
1. The Contractor is responsible for the collection and disposal of all debris, demolition, rubble, residue and waste material generated in the performance of work under this contract. All such materials shall be disposed of at an off base landfill designed to receive the type of material and waste generated or recycling facility by the Contractor. The Contractor is not permitted to deposit any such materials in base trash collection containers or at any on base location without prior written approval of the Contracting Officer. At the BCE's discretion some project items may be retained for use by the government. The Contractor is responsible for all permits, paperwork for the Environmental Protection Agency (State or Federal) and any other agency requiring submission for any items disposed of or generated in the performance of work under this contract.
2. Materials classified as hazardous by US environmental rules, regulations, or laws, shall be handled and processed for disposal in accordance with those rules, regulations, or laws. The Contractor is responsible for all such materials that are residue from Contractor furnished supplies and materials which were brought to the job site by the Contractor, and for any such materials identified herein or by the drawings.
DESIGN STANDARDS, CODES, AND CRITERIA
See plans and specifications.
ACCESS AND SECURITY POLICY AND PROCEDURES
Work Hours
Work hours shall be Monday thru Friday 0700-1630 hours, with the exception of Federal holidays and Phoenix Fridays. Phoenix Fridays are every other Friday. A list can be provided to the successful awardee upon request. Contractor must have prior approval in writing to work outside these guidelines.
Base Access
1. Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the COR to arrange for their entrance onto Base property.
2. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
3. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
4. All commercial, contractor, and sub-contractors vehicles are subject to random inspections each time they enter the base.
5. If badges will be issued, they will be issued by the 153d Security Forces Squadron (SFS) to the contractor through the 153 CES COR. Badges shall be issued, tracked, and collected in accordance with instructions from Security Forces.
6. All personnel working on this project shall request and be eligible to be placed on an Entry Access List (EAL). It is the contractor’s responsibility to ensure all planned personnel have appropriate permission.
7. The COR will coordinate escorts if access to secured areas is required. The Contractor shall provide written notice to the KO and COR at least five (5) working days prior to working in secured areas. The notice shall include the working hours, location(s) of work, and number of workers. Additional information may be required by the Installation Commander before access is granted.
Escorts:
1. A security briefing will be conducted prior to the start of the project.
2. All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.
POINT OF CONTACT
All questions shall be submitted by E-mail. Questions will be answered no later than 10 days following receipt. Unless otherwise stated, all questions will be routed through the Contracting Officer and the Contracting Officer Representative.
WAGE DETERMINATION
"General Decision Number: WY20220038 02/25/2022
Superseded General Decision Number: WY20210038
State: Wyoming
Construction Type: Highway
County: Laramie County in Wyoming.
HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022
SUWY2021-001 05/15/2018
Rates Fringes
CARPENTER........................$ 21.94 4.58
CONCRETE FINISHER............$ 23.77 6.33
ELECTRICIAN
Electrician................. $ 42.00 1.68 Equipment Operator (Electrical Work Only)......$ 41.83 13.94 Ground Man.................. $ 29.70 12.86
IRONWORKER.......................$ 46.83 0.00
LABORER
GROUP 1..................... $ 17.72 7.00
GROUP 2..................... $ 18.82 7.00
GROUP 3..................... $ 21.16 7.00
LABORER CLASSIFCATIONS
GROUP 1: Erector & Installer (fences, guardrail & barrier);
Flag persons (traffic control); Form Strippers; General Laborers, Heater Tender; Material Checker; Pilot Car Driver;
Pick-up Truck Driver; Pre-watering; Presetting & Pre-irrigation (all work); Riprap Man; Tar & Asphalt Pot Tender.
GROUP 2: Asphalt Raker and Tamper; Bin Wall Installer; Chain Saw Operator (clearing & grubbing); Concrete Saw (all types);
Dump Man; Form Setter (paving); Hand Operated Vibratory Roller; High Scaler; Jackhammer & Pavement Breaker;
Landscaper, Landscape Laborer; Maintainer (traffic control);
Mortar Man on Stone Riprap; Nozzle Man (air, water, gunite & sandblasting); Pipe Setter (all pipe types); Tamper Operator (pneumatic, electric, gas & similar) GROUP 3: Drill Doctor; Form Setter and Mover; Spader: Spilling and/or Caisson Worker; Miner (driller); Machine Man; Timber Man; Powderman, Blaster, Tender; Wagon Drill, Air-Trac.
(diamond and other drills for blasting powder or grouting).
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 23.34 9.36
GROUP 2.....................$ 23.34 9.36
GROUP 3.....................$ 23.34 9.36
POWER EQUIPMENT OPERATOR CLASSIFCATIONS
ALL ELECTRICAL WORK IS EXCLUDED. FOR ELECTRICAL WORK, USE
EQUIPMENT OPERATOR CLASSIFICATION LISTED UNDER ELECTRICAL
CONSTRUCTION
GROUP 1: Air Compressor (all types); Backhoes & Excavators (to 5 CY.); Batch Bin Weighman, Sissorman or Hopper; Broom Operator (self-propelled); Chip Spreader Operator; Conveyor Belt Operator; Crusher Oiler; Form Grader Operator; Joint Machine Operator; Longitudinal Float Operator; Oiler, Utility;
Power Loader (belt & bucket type); Pump Operator; Roller Operator, self-propelled (Dirt); Skid Steer (all attachments);
Tire Repairman (large construction equip. tires); Tractor Operator (farm with or w/o power attachments); Tugger (all types).
GROUP 2: Articulated Rock Truck (all capacity); Asphalt Plant Operator; Backhoe, Excavator & Shovel (6 CY. & larger); Batch Plant Operator; Bituminous Laydown Machine Operator; Concrete Batch Plant Operator; Concrete Finish Machine Operator;
Concrete Spreader & Paver Operator; Concrete Multi Blade Span Saw (Hunt process); Crusher Operator; Dozer Operator (all sizes & power attachments); Draglines, Cranes, Piledriver & Truck Mounted Cranes (Mfg. Rating: less than 3.5 CY., and /or less than 50 Tons, all attachments); Drilling Machine, Integrated (all types); Front End Loaders (1.5 up to 10 CY.);
Hydro-type Crane (to 50 tons); Mixer Operator, Concrete (over 1yd.); Motor Patrol Operator (all excluding finish); Mulching Machine Operator; Oiler (crane & shovels); Pavement Breaker;
Hydro-Tamper & similar; Roller Operators, Asphalt (steel & pneumatic); Roto-Milling Machine (under 8 ft. wide); Scraper Equipment (all types and sizes; Screed Operator; Trenching Machine Operator.
GROUP 3: Draglines; Cranes; Piledrivers & Truck Mounted Cranes (Mfg. Rating: 3.5 CY. or larger and/or 50 tons & larger, all attachments); Front End Loaders (over 10 CY.); Heavy Duty Mechanic; Machine Doctor; Hoist Operator (two or more drums, shafts, or raises); Mixer Operator (dual drum); Motor Patrol Operator (finish); Roto-Milling Machine (8 ft. & larger).
TRUCK DRIVER
GROUP 1.....................$ 19.25 9.36
GROUP 2.....................$ 19.81 9.36
GROUP 1: ?A? Frame Truck Driver; Coring Machine (self propelled); Dump Truck Driver (to and including 13 CY.); Flat Rack Material Truck Driver (to 5 tons); Fuel Service Truck Driver; Gang Truck Driver; Gravel Spreader; Greaseman, Tireman; Serviceman; Oil Distributor Driver (to & including 3,600 gal.); Snow Plow Driver (the CY. rate of the truck);
Transit Mix or Wet Mix Truck Driver; Utility Winch Truck Driver; Water Truck Driver (to & including 3,600 gal.).
GROUP 2: Dump Truck Driver (14 to 45 CY.); Flat Rack Material Truck Driver (over 5 tons); Low Boy & Tandem Axle Float Driver; Multiple Axle Type Truck (semi); Oil Distributor Driver (over 3,600 gal); Truck Mechanics; Water Truck Driver (over 3,600 gal.); Winch Trailer Truck Driver.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 30 dys. ADC 1 N/A
FOB: Destination
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2 Alt I Security Requirements (MAR 2021) - Alternate I APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-12 Unique Entity Identifier Maintenance OCT 2016 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
DEC 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
DEC 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-6 Brand Name or Equal AUG 1999 52.211-13 Time Extensions SEP 2000 52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-8 Utilization of Small Business Concerns OCT 2018 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work
MAY 2014
52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons DEC 2021 52.222-54 Employment Eligibility Verification DEC 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-
O0016)
FEB 2021
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2021
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Products and Commercial
Services
JAN 2022
52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7006 Billing Instructions OCT 2005
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations
SEP 2019
252.215-7008 Only One Offer JUL 2019 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.223-7999 (Dev) Ensuring Adequate COVID-19 Safety Protocols for Federal
Contractors (Deviation 2021-O0009)
OCT 2021
252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned
Aircraft Systems (DEVIATION 2020-O0015)
MAY 2020
252.227-7023 Drawings and Other Data to become Property of Government MAR 1979 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7004 (Dev) DoD Progress Payment Rates (DEVIATION 2020-O0010) MAR 2020 252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7013 Requirement for Competition Opportunity for American Steel
Producers, Fabricators, and Manufacturers
JUN 2013
252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.242-7004 Material Management And Accounting System MAY 2011 252.242-7006 Accounting System Administration FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for
Military Operations
OCT 2010
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in…