B.02.09 Attachment F_Experience Information Sheet_R1_20210114.pdf
PDF 679 KB Posted
- Solicitation number
- W9123621R5015
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F
EXPERIENCE INFORMATION SHEET
FACTOR 1: TECHNICAL CAPABILITIES AND EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Name of Firm that performed this work (should be the Offeror or one of the offeror’s subcontractors)
Name, email, phone and fax number of POC:
Experience:
1. The location work was performed: ___________________________________
2. Date work was begun: ________________________ Date work was completed: ________________________
3. The final cost of this project: _______________________________________
4. Is this project more than 85% complete? ____ Yes ____ No If “No” explain percentage of completion
5. Provide detailed information of the work performed (refer to the categories under Evaluation of Factor 1 – Technical Capabilities and Experience, Evaluation Criteria.)
Include explanations of any performance problems, issues, or conflicts and the resolution.
(Continue typing if required to provide more information)
Vessel Repair MATOC Norfolk, VA W91236-21-R-5015
FACTOR 1: TECHNICAL CAPABILITIES AND EXPERIENCE. INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub-Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Committed Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Committed Subcontractor’s experience the project.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ____ Joint Venture ____ Committed Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Committed Subcontractor, explain how the work performed as a Committed Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals.
e. Ensure you provide a letter signed by both the Offeror and the Committed Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.
Vessel Repair MATOC Norfolk, VA W91236-21-R-5015
File details come from the government source that posted it. Updated .