B.01.01_Released_W91QVN23R0064.pdf

PDF 659 KB Posted

Attached to
Telecommunications Infrastructure Support Services, USFK-Wide Federal contract opportunity
Solicitation number
W91QVN-23-R-0064
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunications Infrastructure Support Services, USFK-Wide, newest first.
File Type Posted
B.01.01_ATTACHMENT 3 - PWS, EXHIBITS_W91QVN23R0064.pdf PDF
B.01.01_ATTACHMENT 2 - Schedule of Services (CLINs).xlsx XLSX spreadsheet
B.01.01_ATTACHMENT 1 - Past Performance Questionnaire (PPQ).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN23R0064 27-Apr-2023

b. TELEPHONE NUMBER

315-755-3397

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 29 May 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. PAK, MYONG SUK

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

HUMPHREYS CONTRACTING DIVISION

UNIT 15289

APO AP 96271-5584

UNITED STATES

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WT4G3U 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

HHC, 1ST SIG BDE

1ST SIGNAL BRIGADE

UNIT #15271

APO AP 96205-5271

UNITED STATES

TEL: 315-755-0210 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

238210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF125

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN23R0064

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 40,000 Linear Foot

COPPER CABLE

FFP

Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable FOB: Destination

PSC CD: J061

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 100 Each

GROUND ROD

FFP

Install Ground Rod to Include Grounding of Cable / Terminal.

UNIT UNIT PRICE MAX AMOUNT

0003 50 Each

PET HOUSING

FFP

Install Protected Entrance Terminal (PET) Housing for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

0004 50 Each

SPLICE CASE FOR COPPER CABLE

FFP

Install Splice Case for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

0005 40 Each

3/4", FIRE-RETARDANT PLYWOOD BACKBOARD

FFP

Provide Contractor Furnished Material (CFM) and Install 3/4 Inch, Fire-Retardant Plywood Backboard.

UNIT UNIT PRICE MAX AMOUNT

0006 160,000 Linear

FIBER OPTIC CABLE IN DUCT

Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

0007 800,000 Linear

LEAF FIBER OPTIC CABLE IN DUCT

Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

0008 100 Each

TERMINATION PANEL

FFP

Install Fiber Optic - Termination Panel (Wall Mount or Rack).

UNIT UNIT PRICE MAX AMOUNT

0009 100 Each

SPLICE ENCLOSURE KIT

FFP

Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).

UNIT UNIT PRICE MAX AMOUNT

0010 5,000 Linear

ENCASED BURIED (EB)-20 CONDUIT

Provide CFM & Install Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area).

Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present.

UNIT UNIT PRICE MAX AMOUNT

0011 20,000 Linear

PROVIDE CFM & INSTALL

Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit

UNIT UNIT PRICE MAX AMOUNT

0012 10,000 Linear

SUB / MULTI / MESH INNERDUCT

Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.

UNIT UNIT PRICE MAX AMOUNT

0013 1,000 Each

CORE DRILL 1/2 TO 4 INCH HOLE

FFP

Core Drill 1/2 to 4 Inch Hole

UNIT UNIT PRICE MAX AMOUNT

0014 50 Each

2 TO 4 INCH BUILDING ENTRANCE CONDUIT

FFP

Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.

UNIT UNIT PRICE MAX AMOUNT

0015 25 Each

MULTIDIRECTIONAL HANDHOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

0016 5 Each

MULTIDIRECTIONAL MAINTENANCE HOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

0017 50,000 Linear

INSTALL STRAND AND AERIAL CABLE

Provide CFM & Install strand and guy wires for aerial cable

UNIT UNIT PRICE MAX AMOUNT

0018 65,000 Linear

INSTALL CABLE ON GUY WIRES

Install cable on guy wires for aerial to include splicing, termination and testing of cable.

UNIT UNIT PRICE MAX AMOUNT

0019 20 Each

INSTALL SPLICE CASE ON STRAND

FFP

Install splice case on strand

UNIT UNIT PRICE MAX AMOUNT

0020 25,000 Linear

INSTALLATION OF 1/2-INCH TO 2-INCH EMT

Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building

UNIT UNIT PRICE MAX AMOUNT

0021 100 Linear

GALVANIZED (GIP) 4-INCH CONDUIT

Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building

UNIT UNIT PRICE MAX AMOUNT

0022 200 Linear

GALVANIZED (GIP) 4-INCH CONDUIT

Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides

UNIT UNIT PRICE MAX AMOUNT

0023 1,000,000 Linear

DEINSTALL CABLE IN CONDUITS

Deinstall cable in conduits

UNIT UNIT PRICE MAX AMOUNT

0024 6,000 Linear

INSTALL COMBINED INNERDUCT SYSTEM

Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)

UNIT UNIT PRICE MAX AMOUNT

0025 40 Each

INSTALL OUTSIDE PULL-BOX

FFP

Install outside pull-box (Various sizes)

UNIT UNIT PRICE MAX AMOUNT

0026 1,000,000 Linear

INSTALL PULLING WIRE IN DUCTS

Provide CFM & Install pulling wire in ducts

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

WAR HAZARD

FFP

Estimated Cost for War Hazard Losses is Zero ($0.00).

UNIT UNIT PRICE MAX AMOUNT

1001 40,000 Linear

OPTION COPPER CABLE

Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable

UNIT UNIT PRICE MAX AMOUNT

1002 100 Each

OPTION GROUND ROD

FFP

Install Ground Rod to Include Grounding of Cable / Terminal.

UNIT UNIT PRICE MAX AMOUNT

1003 50 Each

OPTION PET HOUSING

FFP

Install Protected Entrance Terminal (PET) Housing for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

1004 50 Each

OPTION SPLICE CASE FOR COPPER CABLE

FFP

Install Splice Case for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

1005 40 Each

OPTION 3/4", FIRE-RETARDANT PLYWOOD BACKBOARD

FFP

Provide Contractor Furnished Material (CFM) and Install 3/4 Inch, Fire-Retardant Plywood Backboard.

UNIT UNIT PRICE MAX AMOUNT

1006 160,000 Linear

OPTION FIBER OPTIC CABLE IN DUCT

Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

1007 800,000 Linear

OPTION LEAF FIBER OPTIC CABLE IN DUCT

Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

1008 100 Each

OPTION TERMINATION PANEL

FFP

Install Fiber Optic - Termination Panel (Wall Mount or Rack).

UNIT UNIT PRICE MAX AMOUNT

1009 100 Each

OPTION SPLICE ENCLOSURE KIT

FFP

Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).

UNIT UNIT PRICE MAX AMOUNT

1010 5,000 Linear

OPTION ENCASED BURIED (EB)-20 CONDUIT

Provide CFM & Install Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area).

Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present.

UNIT UNIT PRICE MAX AMOUNT

1011 20,000 Linear

OPTION PROVIDE CFM & INSTALL

Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit

UNIT UNIT PRICE MAX AMOUNT

1012 10,000 Linear

OPTION SUB / MULTI / MESH INNERDUCT

Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.

UNIT UNIT PRICE MAX AMOUNT

1013 1,000 Each

OPTION CORE DRILL 1/2 TO 4 INCH HOLE

FFP

Core Drill 1/2 to 4 Inch Hole

UNIT UNIT PRICE MAX AMOUNT

1014 50 Each

OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT

FFP

Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.

UNIT UNIT PRICE MAX AMOUNT

1015 25 Each

OPTION MULTIDIRECTIONAL HANDHOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

1016 5 Each

OPTION MULTIDIRECTIONAL MAINTENANCE HOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

1017 50,000 Linear

OPTION INSTALL STRAND AND AERIAL CABLE

Provide CFM & Install strand and guy wires for aerial cable

UNIT UNIT PRICE MAX AMOUNT

1018 65,000 Linear

OPTION INSTALL CABLE ON GUY WIRES

Install cable on guy wires for aerial to include splicing, termination and testing of cable.

UNIT UNIT PRICE MAX AMOUNT

1019 20 Each

OPTION INSTALL SPLICE CASE ON STRAND

FFP

Install splice case on strand

UNIT UNIT PRICE MAX AMOUNT

1020 25,000 Linear

OPTION INSTALLATION OF 1/2-INCH TO 2-INCH EMT

Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building

UNIT UNIT PRICE MAX AMOUNT

1021 100 Linear

OPTION GALVANIZED (GIP) 4-INCH CONDUIT

Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building

UNIT UNIT PRICE MAX AMOUNT

1022 200 Linear

Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides

UNIT UNIT PRICE MAX AMOUNT

1023 1,000,000 Linear

OPTION DEINSTALL CABLE IN CONDUITS

Deinstall cable in conduits

UNIT UNIT PRICE MAX AMOUNT

1024 6,000 Linear

OPTION INSTALL COMBINED INNERDUCT SYSTEM

Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)

UNIT UNIT PRICE MAX AMOUNT

1025 40 Each

OPTION INSTALL OUTSIDE PULL-BOX

FFP

Install outside pull-box (Various sizes)

UNIT UNIT PRICE MAX AMOUNT

1026 1,000,000 Linear

OPTION INSTALL PULLING WIRE IN DUCTS

Provide CFM & Install pulling wire in ducts

UNIT UNIT PRICE MAX AMOUNT

2001 40,000 Linear

Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable

UNIT UNIT PRICE MAX AMOUNT

2002 100 Each

OPTION GROUND ROD

FFP

Install Ground Rod to Include Grounding of Cable / Terminal.

UNIT UNIT PRICE MAX AMOUNT

2003 50 Each

OPTION PET HOUSING

FFP

Install Protected Entrance Terminal (PET) Housing for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

2004 50 Each

OPTION SPLICE CASE FOR COPPER CABLE

FFP

Install Splice Case for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

2005 40 Each

OPTION 3/4", FIRE-RETARDANT PLYWOOD BACKBOARD

FFP

Provide Contractor Furnished Material (CFM) and Install 3/4 Inch, Fire-Retardant Plywood Backboard.

UNIT UNIT PRICE MAX AMOUNT

2006 160,000 Linear

Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

2007 800,000 Linear

Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

2008 100 Each

OPTION TERMINATION PANEL

FFP

Install Fiber Optic - Termination Panel (Wall Mount or Rack).

UNIT UNIT PRICE MAX AMOUNT

2009 100 Each

OPTION SPLICE ENCLOSURE KIT

FFP

Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).

UNIT UNIT PRICE MAX AMOUNT

2010 5,000 Linear

Provide CFM & Install Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area).

Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present.

UNIT UNIT PRICE MAX AMOUNT

2011 20,000 Linear

Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit

UNIT UNIT PRICE MAX AMOUNT

2012 10,000 Linear

Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.

UNIT UNIT PRICE MAX AMOUNT

2013 1,000 Each

OPTION CORE DRILL 1/2 TO 4 INCH HOLE

FFP

Core Drill 1/2 to 4 Inch Hole

UNIT UNIT PRICE MAX AMOUNT

2014 50 Each

OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT

FFP

Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.

UNIT UNIT PRICE MAX AMOUNT

2015 25 Each

OPTION MULTIDIRECTIONAL HANDHOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

2016 5 Each

OPTION MULTIDIRECTIONAL MAINTENANCE HOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

2017 50,000 Linear

Provide CFM & Install strand and guy wires for aerial cable

UNIT UNIT PRICE MAX AMOUNT

2018 65,000 Linear

Install cable on guy wires for aerial to include splicing, termination and testing of cable.

UNIT UNIT PRICE MAX AMOUNT

2019 20 Each

OPTION INSTALL SPLICE CASE ON STRAND

FFP

Install splice case on strand

UNIT UNIT PRICE MAX AMOUNT

2020 25,000 Linear

Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building

UNIT UNIT PRICE MAX AMOUNT

2021 100 Linear

Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building

UNIT UNIT PRICE MAX AMOUNT

2022 200 Linear

Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides

UNIT UNIT PRICE MAX AMOUNT

2023 1,000,000 Linear

Deinstall cable in conduits

UNIT UNIT PRICE MAX AMOUNT

2024 6,000 Linear

Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)

UNIT UNIT PRICE MAX AMOUNT

2025 40 Each

OPTION INSTALL OUTSIDE PULL-BOX

FFP

Install outside pull-box (Various sizes)

UNIT UNIT PRICE MAX AMOUNT

2026 1,000,000 Linear

Provide CFM & Install pulling wire in ducts

UNIT UNIT PRICE MAX AMOUNT

3001 40,000 Linear

Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable

UNIT UNIT PRICE MAX AMOUNT

3002 100 Each

OPTION GROUND ROD

FFP

Install Ground Rod to Include Grounding of Cable / Terminal.

UNIT UNIT PRICE MAX AMOUNT

3003 50 Each

OPTION PET HOUSING

FFP

Install Protected Entrance Terminal (PET) Housing for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

3004 50 Each

OPTION SPLICE CASE FOR COPPER CABLE

FFP

Install Splice Case for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

3005 40 Each

OPTION 3/4", FIRE-RETARDANT PLYWOOD BACKBOARD

FFP

Provide Contractor Furnished Material (CFM) and Install 3/4 Inch, Fire-Retardant Plywood Backboard.

UNIT UNIT PRICE MAX AMOUNT

3006 160,000 Linear

Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

3007 800,000 Linear

Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

3008 100 Each

OPTION TERMINATION PANEL

FFP

Install Fiber Optic - Termination Panel (Wall Mount or Rack).

UNIT UNIT PRICE MAX AMOUNT

3009 100 Each

OPTION SPLICE ENCLOSURE KIT

FFP

Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).

UNIT UNIT PRICE MAX AMOUNT

3010 5,000 Linear

Provide CFM & Install Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area).

Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present.

UNIT UNIT PRICE MAX AMOUNT

3011 20,000 Linear

Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit

UNIT UNIT PRICE MAX AMOUNT

3012 10,000 Linear

Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.

UNIT UNIT PRICE MAX AMOUNT

3013 1,000 Each

OPTION CORE DRILL 1/2 TO 4 INCH HOLE

FFP

Core Drill 1/2 to 4 Inch Hole

UNIT UNIT PRICE MAX AMOUNT

3014 50 Each

OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT

FFP

Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.

UNIT UNIT PRICE MAX AMOUNT

3015 25 Each

OPTION MULTIDIRECTIONAL HANDHOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

3016 5 Each

OPTION MULTIDIRECTIONAL MAINTENANCE HOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

3017 50,000 Linear

Provide CFM & Install strand and guy wires for aerial cable

UNIT UNIT PRICE MAX AMOUNT

3018 65,000 Linear

Install cable on guy wires for aerial to include splicing, termination and testing of cable.

UNIT UNIT PRICE MAX AMOUNT

3019 20 Each

OPTION INSTALL SPLICE CASE ON STRAND

FFP

Install splice case on strand

UNIT UNIT PRICE MAX AMOUNT

3020 25,000 Linear

Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building

UNIT UNIT PRICE MAX AMOUNT

3021 100 Linear

Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building

UNIT UNIT PRICE MAX AMOUNT

3022 200 Linear

Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides

UNIT UNIT PRICE MAX AMOUNT

3023 1,000,000 Linear

Deinstall cable in conduits

UNIT UNIT PRICE MAX AMOUNT

3024 6,000 Linear

Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)

UNIT UNIT PRICE MAX AMOUNT

3025 40 Each

OPTION INSTALL OUTSIDE PULL-BOX

FFP

Install outside pull-box (Various sizes)

UNIT UNIT PRICE MAX AMOUNT

3026 1,000,000 Linear

Provide CFM & Install pulling wire in ducts

UNIT UNIT PRICE MAX AMOUNT

4001 40,000 Linear

Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable

UNIT UNIT PRICE MAX AMOUNT

4002 100 Each

OPTION GROUND ROD

FFP

Install Ground Rod to Include Grounding of Cable / Terminal.

UNIT UNIT PRICE MAX AMOUNT

4003 50 Each

OPTION PET HOUSING

FFP

Install Protected Entrance Terminal (PET) Housing for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

4004 50 Each

OPTION SPLICE CASE FOR COPPER CABLE

FFP

Install Splice Case for Copper Cable.

UNIT UNIT PRICE MAX AMOUNT

4005 40 Each

OPTION 3/4", FIRE-RETARDANT PLYWOOD BACKBOARD

FFP

Provide Contractor Furnished Material (CFM) and Install 3/4 Inch, Fire-Retardant Plywood Backboard.

UNIT UNIT PRICE MAX AMOUNT

4006 160,000 Linear

Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

4007 800,000 Linear

Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).

UNIT UNIT PRICE MAX AMOUNT

4008 100 Each

OPTION TERMINATION PANEL

FFP

Install Fiber Optic - Termination Panel (Wall Mount or Rack).

UNIT UNIT PRICE MAX AMOUNT

4009 100 Each

OPTION SPLICE ENCLOSURE KIT

FFP

Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).

UNIT UNIT PRICE MAX AMOUNT

4010 5,000 Linear

Provide CFM & Install Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area).

Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present.

UNIT UNIT PRICE MAX AMOUNT

4011 20,000 Linear

Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit

UNIT UNIT PRICE MAX AMOUNT

4012 10,000 Linear

Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.

UNIT UNIT PRICE MAX AMOUNT

4013 1,000 Each

OPTION CORE DRILL 1/2 TO 4 INCH HOLE

FFP

Core Drill 1/2 to 4 Inch Hole

UNIT UNIT PRICE MAX AMOUNT

4014 50 Each

OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT

FFP

Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.

UNIT UNIT PRICE MAX AMOUNT

4015 25 Each

OPTION MULTIDIRECTIONAL HANDHOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

4016 5 Each

OPTION MULTIDIRECTIONAL MAINTENANCE HOLE

FFP

Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation

UNIT UNIT PRICE MAX AMOUNT

4017 50,000 Linear

Provide CFM & Install strand and guy wires for aerial cable

UNIT UNIT PRICE MAX AMOUNT

4018 65,000 Linear

Install cable on guy wires for aerial to include splicing, termination and testing of cable.

UNIT UNIT PRICE MAX AMOUNT

4019 20 Each

OPTION INSTALL SPLICE CASE ON STRAND

FFP

Install splice case on strand

UNIT UNIT PRICE MAX AMOUNT

4020 25,000 Linear

Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building

UNIT UNIT PRICE MAX AMOUNT

4021 100 Linear

Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building

UNIT UNIT PRICE MAX AMOUNT

4022 200 Linear

Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides

UNIT UNIT PRICE MAX AMOUNT

4023 1,000,000 Linear

Deinstall cable in conduits

UNIT UNIT PRICE MAX AMOUNT

4024 6,000 Linear

Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)

UNIT UNIT PRICE MAX AMOUNT

4025 40 Each

OPTION INSTALL OUTSIDE PULL-BOX

FFP

Install outside pull-box (Various sizes)

UNIT UNIT PRICE MAX AMOUNT

4026 1,000,000 Linear

Provide CFM & Install pulling wire in ducts

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-JUL-2023 TO

30-JUN-2024

N/A HHC, 1ST SIG BDE

1ST SIGNAL BRIGADE

UNIT #15271

APO AP 96205-5271

UNITED STATES

315-755-0210

WT4G3U

0002 POP 01-JUL-2023 TO

30-JUN-2024

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0021 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0024 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0025 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0026 POP 01-JUL-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0027 N/A N/A N/A N/A

1001 POP 01-JUL-2024 TO

30-JUN-2025

N/A HHC, 1ST SIG BDE

1ST SIGNAL BRIGADE

UNIT #15271

APO AP 96205-5271

UNITED STATES

315-755-0210

1002 POP 01-JUL-2024 TO

30-JUN-2025

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1018 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1019 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1020 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1021 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1022 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1023 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1024 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1025 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1026 POP 01-JUL-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-JUL-2025 TO

30-JUN-2026

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2016 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2017 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2018 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2019 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2020 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2021 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2022 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2023 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2024 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2025 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2026 POP 01-JUL-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-JUL-2026 TO

30-JUN-2027

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3010 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3011 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3012 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3013 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3014 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3015 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3016 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3017 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3018 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3019 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3020 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3021 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3022 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3023 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3024 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3025 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

3026 POP 01-JUL-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-JUL-2027 TO

30-JUN-2028

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4010 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4011 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4012 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4013 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4014 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4015 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4016 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4017 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4018 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4019 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4020 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4021 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4022 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4023 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4024 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4025 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

4026 POP 01-JUL-2027 TO

N/A (SAME AS PREVIOUS LOCATION)

NOTICE TO OFFERORS

All sources may submit a proposal as applicable. However, the Republic of Korea (ROK)-United States (U.S.)

Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, for this requirement. All sources submitting a proposal, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal - that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.

Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer.

“All offerors interested in competing for this requirement are required to submit their price proposal in Korean Won (KW) only. A proposal submitted in currency other than Korean Won will not be considered for award.”

GUARANTEE MINIMUM AND MAXIMUM LIMITATIONS

The proposed contracting action is to establish a Multiple Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts. The guaranteed minimum of each contract awarded is $10,000.00. The combined total of all delivery/task orders issued against each awarded contract shall not exceed $12,512,987.70. The guaranteed minimum and maximum amounts are for the life of the contract.

Guaranteed Minimum Amount

Maximum Amount

Base Year $10,000.00 $2,404,475.62 1st Option Period $10,000.00 $2,452,565.13 2nd Option Period $10,000.00 $2,501,616.44 3rd Option Period $10,000.00 $2,551,648.77 4th Option Period $10,000.00 $2,602,681.74

NOTE 1: The contract line items identified below have an established ordering period as stated in the period of performance. Orders may be placed at any time during an effective ordering period.

NOTE 2: Indefinite-Delivery, Indefinite-Quantity (IDIQ) CLINs quantities are estimated only. All supplies/services will be obtained by individual delivery orders issued by the KO. Individual delivery/task order requirements will be competed amongst the multiple contracts awarded.

NOTE 3: The above minimum and maximum applies to each option period if exercised.

CONTRACT PERIOD

Base Period:

1st Option Year:

2nd Option Year:

3rd Option Year:

4th Option Year:

1 July 2023 – 30 June 2024 1 July 2024 – 30 June 2025 1 July 2025 – 30 June 2026 1 July 2026 – 30 June 2027 1 July 2027 – 30 June 2028

ADDENDUM TO FAR 52.212-1

INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(MAR 2023)

NOTE: Performance Work Statement (PWS) is attached to the Solicitation as ATTACHMENT 3.

1. INSTRUCTION FOR PROPOSAL SUBMISSION

Formal Communications: Official means of disseminating information such as requests for information concerning this solicitation shall be submitted via email myongsuk.pak.ln@army.mil to the following address:

Contract Specialist (CS): Contracting Officer (KO):

Ms. Pak, Myong Suk Mr. James E. McGill 411th CSB, Korea 411th CSB, Korea E-mail: myongsuk.pak.ln@army.mil E-mail: james.e.mcgill14.civ@army.mil

TEL: 050-3355-3397 TEL: 050-3355-3375

(1) These instructions are designed to ensure submission of essential information in order for the Government to understanding and evaluate proposals. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions with Offerors.

(2) No information concerning this solicitation or requests for clarification will be provided in response to Offeror-initiated telephone calls. All such requests must be made in writing and submitted to the above email addresses. All questions must be received no later than 1300 hours on 15 May 2023 (KST). Questions received after this date and time may not be answered.

(3) Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.

(4) Offerors are required to submit their proposal in accordance with the instructions provided below through https://sam.gov before closing of solicitation. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.

(5) The Government intends to evaluate and make award without discussion with the offerors (other than minor clarifications), unless discussions are determined to be necessary.

(6) The Government intends to select a number of vendors in the best interest of the Government, from the list of Lowest Priced Technically Acceptable offerors. Individual delivery/task order requirements will be provided fair opportunity in accordance with FAR 16.505 amongst the multiple contracts awarded.

2. PROPOSAL SUBMISSION: Solicitation Provision for Evaluation of Offers is below:

FACTOR 1. TECHNICAL CAPABILITY

Subfactor 1.1: Prime Contractor's Licenses The Offeror shall submit a copy of the following licenses. The licenses of a subcontractor cannot substitute for the prime contractor’s license.

a. Valid and current business registration (사업자등록증) issued by the Republic Of Korea (ROK) Government

b. Communications License issued by the Korean Communications Commission (KCC)

(정보통신공사업등록증).

Subfactor 1.2: Prime Contractor's Prior Experience The offeror shall submit documentation demonstrating a minimum of three (3) years of experience within the last seven (7) years with a minimum value of ₩100,000,000 per year in installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network (LAN). The experience of a subcontractor shall not be substituted for the prime contractor’s experience. The offeror shall be evaluated on submitted evidence of prior experience as required below:

a. The title of the contract/project

b. The number of the contract/project

c. Clear description of qualifying work experience

d. Length of contract/project (year/month/date – year/month/date)

e. Value of contract/project in Korean Won (₩) for a total amount per year

f. Complete point of contact at Client Organization (name, phone number, email address)

Subfactor 1.3: Staffing Plan The Offeror shall submit a written Staffing Plan with the number of employees/staff and how the Contractor’s employees shall perform install, relocate, repair, remove fiber optic, copper cable, Protected Distribution Systems (PDS), and Local Area Network (LAN) infrastructure in accordance with Performance Work Statement (PWS) and Contract Line Items identified in this solicitation. The plan shall clearly identify the following:

a. Labor categories.

b. Number of employees filling each labor category.

c. Work plan describing how the employees will perform install, relocate, repair, remove fiber optic, copper cable, Protected Distribution Systems (PDS), and Local Area Network (LAN) infrastructure in accordance with Performance Work Statement (PWS) and Contract Line Items identified in this solicitation.

d. Surge plan for periods of heightened levels of work.

e. Employee retention, replacement, and backup plan.

f. Sub-contractor's company name, point of contact (name, phone number, email address), and the percentage of business participation if a portion of the services will be sub-contracted out.

g. Any other information pertinent to the execution of this requirement.

Subfactor 1.4: Organization Chart.

The offeror shall provide an Organizational Chart that clearly shows the existence of sufficient contract oversight to ensure efficient and effective contract performance matching details from the Staffing Plan provided from Subfactor

1.3. for successful performance at all locations, and identifies at a minimum the following:

a. Logical organizational hierarchy showing all functions and all personnel involved in the completion of the overall tasks identified in the PWS.

b. Personnel identified in the Staffing Plan (Subfactor 1.3) are identified in this submitted Organization Chart.

Subfactor 1.5: Key Personnel Qualifications - Contract Manager (CM) and Project Manager (PM) The offeror shall provide a resume of the Contract Manager (CM) and Project Manager (PM) with the following qualifications:

a. Minimum Bachelors of Science (BS) degree in Information Technology or related field.

b. Demonstrating a minimum of three (3) years of experience within the last five (5) years in contract management or project management with satisfactory prior experience relating to telecommunications support (installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network).

c. CM and PM shall be able to communicate and fully be able to carry a coherent conversation in English without constant stoppage due to inadequate English language skills or understanding.

Contract Manager (CM) and Project Manager (PM)’s resume must clearly identify the qualifications above in the following format:

a. Position title held.

b. A clear description of qualifying work experience.

c. Length of work experience (year/month/date – year/month/date).

d. Complete point of contract of employer (business name, point of contact information [name, phone number, email address]).

FACTOR 2. PAST PERFORMANCE

The offeror shall have a minimum of two (2) recent and relevant Past Performance Contract References in installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network.

Recent past performance is “same or similar to” services identified in the PWS. Recent and relevant past performance should also be similar in size, scope, complexity, and contract type in installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network.

a. Past Performance Contract References. The following information shall be included for each past performance reference as applicable, A minimum of two (2) Past Performance Contract Reference submissions are required in the format below:

1. The title of the Contract/Project

2. Contract No. for the Government/Commercial Performance

3. A clear description of qualifying experience

4. Length of Contract/Project (Year/Month/Date – Year/Month/Date)

5. Value of Contract/Project

6. Complete Name of Point of Contact (including email and Phone Number) at Client

Organization/Requiring Activity (RA)

b. Past Performance Questionnaire (PPQ). Each Offeror shall ensure the Past Performance Questionnaire - Attachment #1 is sent to each Past Performance Contract Reference identified in the proposal. The Past Performance Contract Reference will then forward the completed questionnaire directly to the Contract Specialist and Contracting Officer. It is the offeror's responsibility to follow up with the reference to ensure if the required information has been forwarded prior to the closing date of the solicitation. The Offeror shall inform each reference that Contracting Officer will use their response in the evaluation of Past Performance for this solicitation. The Past Performance Contract Reference may submit the completed questionnaire via email to myongsuk.pak.ln@army.mil and james.e.mcgill14.civ@army.mil.

***NOTE: No questionnaires (emailed or otherwise) will be accepted directly from the offeror being evaluated.***

FACTOR 3. PRICE:

a. The Offeror shall provide complete price proposal to include:

1. Schedule of Services (CLINs) – Attachment #2

2. Prices shall be in local currency (Korean Won ₩)

3. Any escalation in option year pricing shall be identified

b. OPTIONS: As part of price evaluation, the Government will evaluate its option to extend services (FAR Clause 52.217-8 - Option to Extend Services) by adding one-half of the Offeror’s final option period prices to the Offeror’s total price. Thus, the Offeror’s total price for the purpose of evaluation will include the base period, 1st option, 2nd option, 3rd option, 4th option and one-half of the 4th option period. Offerors are required only to price the base and four (4) option periods. Offerors shall not submit a price for the potential one-half year extension of services period. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced.

c. A written notice of award furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

d. The offeror shall complete the pricing information for each Contract Line Number (CLIN) identified for the base and four (4) option periods.

3. COMPLETION OF PROVISIONS/CLAUSES (Other Required Documents)

Offeror(s) shall fill out the following FAR or local clauses and submit as the final part of the price proposal:

(1) 52.212-3, Alt 1, Offeror Representations and Certifications--Commercial Items Alternate I

(2) ATTACHMENT: CONTRACTOR’S TAX EXEMPTION DECLARATION

4. SIGNED SOLICITATION AND AMENDMENT: Signed first page of the solicitation (SF1449) and each amendment (SF30) (if any amendment were issued).

5. GENERAL INSTRUCTIONFS FOR PREPARATION OF PROPOSAL

(1) Offerors are required to submit proposals each Factor/Subfactor in response to this solicitation in 4 separate volumes as follows:

Volume of Section Number

Factor(s) Volume Title Page Limitation

Number of Copies Required

I Factor 1 Technical Capability 30 pages

2 (1 original with company name or symbol / 1 redacted copy)

2 (1 original with company name or symbol / 1 redacted copy)

1 Original

Subfactor 1.1 Prime Contractor's Licenses

Subfactor 1.2 Prime Contractor's Prior Experience

Subfactor 1.3 Staffing Plan Subfactor 1.4 Organization Chart Subfactor 1.5 Contract Manager (CM and PM) Qualifications II Factor 2 Past Performance 2 pages per contract described

III Factor 3 Price No page limitations

IV Other required documents from Section 3 above.

No page limitations

Note: Page submitted in excess of the stated limitations will be removed and not reviewed by the evaluation team.

(2) The offeror shall submit its proposal in accordance with the following instructions.

(a) These instructions are designed to ensure submission of essential information in order for the Government to understanding and evaluate proposals. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions with Offerors.

(b) Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.

(c) Offerors shall submit a complete offer package through https://sam.gov by the closing date and time of this solicitation listed in block 8.

(e) Offeror(s) are responsible for ensuring all proposal are received by the contract specialist and contracting officer by the date/time deadline specified.

(f) Offerors shall be available telephonically with all supporting data necessary to support/discuss their proposals within 24 hours after notification by the Contracting Officer. Times and dates for discussions with each individual entity will be confirmed in writing.

* Note 1: All pricing information shall be submitted in Volume III (Price Proposal) and no other volume.

* Note 2: All volumes (I, II, III, IV) are to be separated. (ex. Volume I – Technical Capability, Volume II- Past Performance, Volume III – Price, Volume IV – Other required documents)

* Note 3: The use of hyperlinks in proposals is prohibited in all volumes.

* Note 4: Any proposal which does not comply with these criteria shall be deemed non-responsive, and shall be eliminated from the competition.

(3) POINT OF CONTACT: Offeror shall provide the Name(s), office/mobile telephone numbers, and e-mail address of person(s) authorized to conduct discussions/negotiations and to financially bind the company.

(4) Contract References to “Day”: Unless otherwise stated herein, all references to ‘day” shall be interpreted to mean ‘calendar day’.

(5) PROPOSAL FILES

(a) Format. All information pertaining to a particular volume shall be confined to that volume. For example, all Factor 1. Technical Capability shall appear in Volume I, all Factor 2. Past Performance information shall appear in Volume II, etc . Price information shall only be presented in Volume III and shall NOT be included in Volumes I and II.

(b) Standard Proposal Instructions. All proposal volumes must:

i) Include a cover, title page, a table of contents, and the body of the proposal.

ii) Provide a list of Tables and Figures for each Volume as applicable.

iii) Provide a Glossary of Abbreviations and Acronyms for each Volume.

iv) At a minimum, all cover sheets shall contain the following information:

- Proposal for W91QVN-23-R-0064, Telecommunications Infrastructure Support Services (TISS), USFK-Wide

- Volume Number and Title

- Name and Address of Offeror

- Identification of either Original or Redacted

- Date of Submission

- Point of contact, name, email address and phone number to support/discuss if necessary for Original copy.

v) No classified material shall appear anywhere within the proposal.

vi) Volume I (Technical) shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .